Hydrometric Instrument/Asset Management In Hydstra. Paradigm Adjustment?. Basic Tenet. we believe: if you don’t know what your instrumentation is doing….. then you can’t say with any confidence what quality data you’ve got. ergo the instrument database is important. Instrument Database.

daxia
Télécharger la présentation

Hydrometric Instrument/Asset Management In Hydstra

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Hydrometric Instrument/Asset ManagementIn Hydstra Paradigm Adjustment?

  2. Basic Tenet we believe: if you don’t know what your instrumentation is doing….. then you can’t say with any confidence what quality data you’ve got. ergo the instrument database is important

  3. Instrument Database • DWE has operated the Hydstra Instrument database since 1989 in some form or other • It was initially just used as an inventory for hydrometric assets (ie current meters and associated hydrographic equipment)

  4. However • With the regionalisation of the Department in 1990, the hydrometric unit was divided into 6 major regions • Each of those regions became largely autonomous • Each of the regions headed their own way with instrumentation and instrumentation management

  5. Next to Latest Incarnation • With the creation of DWE in 2007 there was a move back to centralised management and a greater recognition of the need to have centralised reporting and common systems across all hydrometric activities

  6. Current Hydstra Instruments use • Now used by OoW to capture all hydrometric instrumentation information: • Asset management records (INSTREG) • Location records (INSTHIST) • Service / repair records (INSTREPR) • Calibration records (INSTCAL) • Now we have: 705 model numbers registered 21689 instruments registered

  7. Drivers for Change • Asset management requirements driven by Federal projects • Improve the link between our instrument and calibration records to our data quality • Use HYVIST to capture test and measurement records • Better reporting on the data from our instrument database • A consistent, national approach….. if possible

  8. 1. Federal Projects • Effectively our whole network (~ 1000 SW sites) will be replaced by new technology and telemetered within the next 3 years • NWC – Hydrometric Network Expansion • $6 million over 3 years • Install/upgrade ~ 150 new sites • Convert ~ 300 sites to IP • BOM – Modernisation Project • $4.3 million in last 2 years (not only hydrometric) • Upgrade shelters and infrastructure • Upgrade loggers, sensors and telemetry for the remaining sites

  9. 1. Federal Projects • We need good asset management reporting • ie what went where when • We need to prove we aren’t double dipping • We need to be able to forecast replacement intervals and costs • We want to improve standardisation/consistency across the state • When Federal funds run out we will need to be able to secure state funds for asset replacement

  10. 2. Quality Codes • DWE introduced a new quality coding system which tried to link instrument performance to quality codes Quality 1 - No data in the period have been adjusted from sensing system measurement in any way - see code definitions

  11. Quality 2. - Data adjusted during processing - see code definitions Quality 3. - No data in the period have been adjusted from sensing system measurement in any way - see code definitions

  12. 2. Quality Codes • However it’s probably a tad too complex • You have to know what each code means for each sensor • There is no easy way for a user to link this objectively to data quality • It is not easy to rank/group quality • And there was no easy way to relate it to our instrument records • So we are looking at making some changes

  13. HYVISIT • It’s a site visit management system being rolled out state wide • its been in use in various guises for over 20 years in some areas • You start off by creating a set of questions (CODES) • Assign question(s) to instrument model(s) • Decide whether you want it to be a prompt for actions • Decide if you want to record the results (INSTRESP) • You can also link different questions to different types of visits (eg. regular, special, annual, instrumentation) • The questions will be activated according to the instruments/equipment installed at a site

  14. HYVISIT • For example say you were visiting 219025 Brogo River at Angledale

  15. HYVISIT Questions

  16. HYVIST - Data

  17. HYVISIT - Reports

  18. Proposals for Hydstra Modifications • New structure for INSTMOD • Linking of calibration records to Instruments • Changes to HYVISIT especially reports • Possible standalone version? • Changes to HYDMWB to access data from Instrument database and INSTRESP • New KPI’s and Reporting

  19. a) New Structure for INSTMOD Recommending 9 core INSTMOD Groups • Recording devices • Sensors • Test & measurement equipment • Plant & equipment • Surveying • Infrastructure • Power systems • Communications • OH&S

  20. Recording Devices- Structure Data Logger / PLC / Chart Example

  21. Sensors - Structure Level / Water Quality / Meteorological Example

  22. How can this be achieved ? • With modifications to existing fields and the creation of additional fields in INSTMOD & INSTREG • In INSTMOD • Primary Key = Model => Core groups • Secondary Key =New = options under core groups • In INSTREG • Same Primary and Secondary Key as INSTMOD • Cost renamed to Purchase Cost • New Fields – Manufacturer, Manufacturers Model Number, Purpose

  23. b) Other Proposed Database Changes • Ability to linking to relevant documents • Ability to add hyperlinks – eg. calibration doco, photos, technical specs etc • Other reporting Options • Financial aspects – eg. depreciation calcs • Service and calibration scheduling

  24. c) HYVIST Enhancements • Linking of Visit records to Instrument models • To enable better instrument reporting • Better links to TS data • Historical date-stamping – instrument performance, hydrographer changes (integration with HISTORY database) • OH&S issues (eg. record of site inductions) • Full standalone operation and auto uploads

  25. d) Data Managers Workbench • Linkages to Instrument records • e.g. be able to view reference values (staff gauge and counter readings) collected from HYVIST during editing

  26. e) KPI and General Reporting • Ability to report on the ongoing relationship between the reference point (staff gauge/benchmark) and the sensing recording system. • The KPI is whether the performance check meets our standards (+/-10mm or 1%). A non conformance could be attributed to the sensor, logger or staff gauge a combination of them.   • Ability to report the % of logging and or sensing systems that result in height data greater than 5mm, 10mm and 15mm from the reference (SG) and hence overall system performance. • Ability to report on the amount and % of record recorded of missing or poor quality record attributed to a type of sensor, type of logger, type of station per station, hydrographer, area, client, state. • Ability to report on the total number of failures of a type of equipment and the resultant affect of these failures.

  27. e) KPI and General Reporting • Register the control as a instrument and be able to report the % of times that the gauged flow deviated from the existing rating curve by 5%, 10% 15% 20% and above per station, area, client, state, hydrographer • Be able to reflect the depreciation status of individual equipment and/or the station. • Be able to report the current status of individual station, roll up to a report for area, hydrographer, client, state on the calibration, performance check per our procedural requirements. • Be able to extract history for a particular piece of equipment or station, client, area or state

  28. Where to from here? DWE have submitted a BOM project proposal for 2009/10 • National 2 day workshop to examine instrument record management • Hopefully establish an agreed overall vision and consistent Australian wide approach • Proposed to be under the aegis of the AHA • Funding for initial modifications to the Hydstra Instrument database

  29. Possible outcomes ? • AHA forum with reps from all lead State water agencies to discuss national approach to instrument and calibration records • HUG - Instrument users group established to drive changes to INST Manage

  30. Moving Forward • What ever the outcomes of the BOM funding proposal we would like to move forward • We will be requesting changes to the INST databases • We would like them to be consistent with a nationally adopted practice • Would you like to be part of this activity??

  31. Thank you & question time Contacts DWE C.Maes colin.maes@dnr.nsw.gov.au J.Hayes john.hayes@dnr.nsw.gov.au Acknowledgements DWE – P.Corbett,Project Manager – BoM Projects M.Robinson,Hydrometric Co Ordinator – Central West