An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Boston-Access & Opportunity Committee Bi-Monthly Report January 19, 2016 The University of Massachusetts Building Authority Patricia A. Filippone, Executive Director

  2. UMBA Staffing Director of Capital Projects – Joe Naughton Capital Projects Coordinator – Sean Regan Compliance Analyst – Maggie Drouineaud

  3. UMass Boston Project Labor Agreement Projects • University Hall • Stage: Construction • Estimated Construction Cost: $105 M • OPM: Joslin, Lesser + Associates • CM: Gilbane, Inc. • Steve Duvel, Senior Project Executive • Jim Driscoll, Senior Project Manager • Danielle Skilling, EEO Compliance Officer • Utility Corridor and Roadway Relocation • Stage: Bidding/Construction • Estimated Construction Cost: $148 M • OPM: Joslin, Lesser + Associates • CM: BOND • Bob Mischler, Project Executive • Mike Spodek, Senior Project Manager • Elio DiBiase, Project Manager • Samantha Bond, Assistant Project Manager

  4. Workforce Utilization Snapshot *Veterans goal was not established in the PLA and is measured on a “Best Faith Efforts” basis.

  5. MBE/WBE Construction Business Participation *Some firms are both M and WBE.

  6. University Hall Project – to – Date M/WBE Update • Boston Residents 34% • Minority 30 % • Female 6% • Veterans 5% • M/WBE 13% • Percentage of Contracts Awarded-to-date – 100 %

  7. University Hall Results by Contractor- December 2015

  8. University Hall Results by Contractor- Project to Date

  9. General Academic Building 1 Results by Trade- December 2015

  10. General Academic Building 1 Results by Trade –Project to Date

  11. GAB 1 Workforce Diversity December 2015 Project-to-Date • Residents – % • Minority – % • Female – % • Veterans – % June 2015 • Residents – % • Minority – % • Female – % • Veterans – %

  12. GAB Project – M/WBE Construction Business Detail

  13. Utility Corridor & Roadway Relocation Project Project – to – Date M/WBE Update • Boston Residents 29 % • Minority 24% • Female 7% • Veterans 3% • M/WBE 14 % • Percentage of Contracts Awarded-to-date 97%

  14. Utility Corridor and Roadway RelocationResults by Contractor – December 2015

  15. UCRRResults by Contractor – Project to Date

  16. Utility Corridor and Roadway RelocationResults by Trade – December 2015

  17. Utility Corridor and Roadway RelocationResults by Trade – Project to Date

  18. Utility Corridor & Roadway Relocation Project Project-to-Date • Boston Residents – % • Minority – % • Female – % • Veterans – % Month of June • Boston Residents – % • Minority – % • Female – % • Veterans – 0% *Graph courtesy of Policy Group on Tradeswomen Issues (PGTI)

  19. Utility Corridor & Roadway Relocation ProjectWMBE

  20. Upcoming UMBA Projects at UMass Boston • Renovation of Existing Academic Buildings • Stage: Schematic Design • Construction Commencement – Temporarily on hold • Project Budget = $75 million • OPM: Hill International • Architect: Cannon Design • Energy Producing Facility • Stage: Entering Design Development • Construction Commencement – Summer 2016 • Project Budget = $32 million • OPM: Jacobs • Architect: Cambridge 7 • CM: Gilbane • Parking Garage • Stage: Study • Construction Commencement – Summer 2016 • Project Budget = $45 million • OPM: Skanska • Residence Hall • Stage: Study • Construction Commencement – Summer 2016 • Project Budget = $120 million