1 / 9

What is Oracle Hyperion Planning

What is Oracle Hyperion Planning. Centralized, web-based Budgeting and Planning application Combines Operational and Financial measures to improve Business Predictability Provides a scalable planning solution with easy to adopt web based and Microsoft Office interfaces

debbie
Télécharger la présentation

What is Oracle Hyperion Planning

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. What is Oracle Hyperion Planning Centralized, web-based Budgeting and Planning application Combines Operational and Financial measures to improve Business Predictability Provides a scalable planning solution with easy to adopt web based and Microsoft Office interfaces Provides Reporting capabilities to view any slice of data through the powerful multi-dimensional database engine

  2. Oracle Hyperion Planning Key Features • Multi-dimensional / multi user planning with a powerful business rules engine • Flexible workflow and plan management capabilities • Comprehensive Microsoft Office integration • Easy to use Web interface • Seamless creation of reports and dashboards • Proven and scalable architecture • Robust integration with ERP systems and other sources • Full set of administrative tools for application management

  3. Oracle Hyperion Planning Key Benefits • Reduce budgeting and planning cycles by weeks or months • Improve forecast accuracy • Appeal to a wider user community through an intuitive Web user interface • Shrink the learning curve for users by leveraging Microsoft Office products as an interface into Oracle Hyperion Planning • Eliminate time lag between when plans are updated and reports are refreshed • Reduce cost of ownership thought superior application deployment, management tools and packaged data integration • Lay the foundation for making the transition to Enterprise Business Planning

  4. VECG Case Study: Planning as a Consolidation Application • Client Pain Points: • Existing spreadsheet planning process is costly, inaccurate, and inflexible for adjustments • Audit findings indicated lack of controls in existing process • Difficulty consolidating between multiple operating companies and currencies to produce plan • Key Objectives: • Provide a consistent web based interface for all corporate users • Replace the multiple spreadsheets, databases and other tools currently used • Improve the accuracy of reported plan and outlook results • Reduce the cycle time required to finalize plans and monthly outlooks • Provide powerful what-if scenario analysis capabilities to facilitate HR merit and other iterative analyses • Ease currency conversion calculations and provide a standard planning methodology for all currencies • Implement efficient Planning process to reduce corporate overhead labor costs • Scope: • Corporate consolidation process for Annual Plan and Monthly Outlook • Workforce planning and HR Analytics • Source data feeds and ETL logic • Necessary Reporting and Output feeds from Planning to HFM and EDW

  5. Existing State Workflow

  6. VECG Case Study: Project Approach • Detailed Engagement Options • Assessment Phase • Document Review • Technology Review • Functional and Technical Interviews • Current Situation Assessment • Technical • Further Breakdown by Component • Functional • Further Breakdown by Functional Area • Summary of Findings • Strengths/Weaknesses/Opportunities/Requirements • Recommendations • Technical • Short Term • Medium Term • Long Term • Functional • Short Term • Medium Term • Long Term • Technology strategy • Break down technical components • High level best practices • Recommended Approach by Phase • Phase Detail • High Level Proposed Timeline • Next Steps in Detail • Objectives • Assessment Requirements met in Phase I • Phase 1 Timeline

  7. VECG Case Study: Project Strategy Phase 1 Design Develop phase 1 consolidation modules Infra Build Out (Dev) Phase 1 Deployment Prod Env Setup Phase 2 Design Develop phase 2 Outlook + R&D Phase 2 Deployment Phase 3 Design Develop phase 3 HR Analytics Phase 3 Deployment Phase 4 Design Develop phase 4 Annual Plan Phase 4 Deployment • Assumptions: • 1 VECG development resource added for Phase 1 development • Client resources focused on Requirements & Design efforts through November • Client development resource(s) to be cross-trained during phase 2 and 3 development • Client resources lead phase 4 development (assistance from VECG developers only as necessary) • VECG to lead development environment build out and cross train Client resources • Client to own production environment configuration with VECG support

  8. Future State Workflow

  9. VECG Case Study: Benefits • Dramatically reduced cycle time to Develop Plan and Monthly Forecast • Increased Accuracy of Plan • Reduced cost to develop Plan and Forecast • Rapid adoption by Planning community due to easy to use web based and Microsoft Excel interfaces • Simplified integration with HFM and EDW • AD HOC reporting capabilities unavailable in prior solutions

More Related