Technical Affairs Water Projects Department. 2006. Water Projects Department Role Summary of Running Projects Recently Awarded Contracts Under Tendering Projects Budget. Water Projects Department Role

demi
Télécharger la présentation

2006

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Technical Affairs Water Projects Department 2006

  2. Water Projects Department Role • Summary of Running Projects • Recently Awarded Contracts • Under Tendering Projects • Budget

  3. Water Projects Department Role In order to help kahramaa achieve its objectives, WP role is to provide Kahramaa with design engineering and execution of all water related projects and other civil constructions such as :

  4. Construction of New and Refurbishment of Water Retaining Structures e.g. 1.1 Reservoirs (RC, steel, GRP, glass fused etc..) 1.2 Tanks (RC, steel, GRP, glass fused etc.. ) • Construction of New, Extensions, Refurbishment of Pump Stations. • Construction of Primary Mains downstream the Power and Desalination Stations • Extensions and Replacement of Primary Mains • Extensions and Replacement of Distribution Networks • General Buildings (e.g. Warehouses, Administration Buildings Water Laboratories ,..etc)

  5. Water projects department currently has a number of running contracts. Some contracts are newly awarded; And some others are being prepared for tendering soon. In addition New projects are frequently received from the end user (WNA) to cover the timely development in QATAR.

  6. Summary of Running Projects

  7. Ras Laffan Pipeline & Associated Extension of Mains Rep. & Upgrad. Of Mains 1. Ras Laffan A & B water pipelines and associated reservoirs. Total amount: QR 911,927,064 2. Extensions of Mains at Greater Doha, Al khor Ph I & II , Al Nassiriyah, Al Ghuairiyah and Muraikh. Total amount: QR 285,217,742 3. Replacement and Upgrading of Mains at Doha and Mesaieed. Total amount: QR 270,932,629 Grand Total Amount for Running Projects: QR 1,468,077,435

  8. Water supply Upgrading Works Replacement Works Recently Awarded Contracts

  9. Project #: GTC 60/2005 Upgrading New & Old Salwa Distilate & Rising Mains Title Description of Works Supply and lay of DI pipes ranging in size from 400 mm. to 1400 mm. Length of Mains (Kms) 31 93.8 Contract Value in Ml. QR Al Jaber Engineering Co. Contractor Jan 2006 Jan 2007 Start Date Compl. Date

  10. GTC 63/2005 Project #: Replacement of Dist. Mains at Doha (Package 1) Title Supply and lay of DI pipes ranging in size from 100 mm. to 900 mm Description of Works Length of Mains (Kms) 75.8 99.7 Contract Value in Ml. QR AL Waha Contracting & Trading Co. Contractor Sep 2007 Jan 2006 start Date compl. Date

  11. Project #: GTC 69/2005 Replacement of Water Dist. Mains at Doha & Messaieed City Title Supply and lay of DI pipes ranging in size from 100 mm to 600 mm. Description of Works 80 Length of Mains (Kms) Contract Value in Ml. QR 44.2 Contractor Boom Construction Co. Start Date Feb 2006 Feb 2008 Compl. Date

  12. GTC 70/2005 Project #: Water Supply to Madinat Alshamal, Aljerian & Um Salal Ali Title Description of Works Supply and lay of DI pipes ranging in size from 100 mm to 600 mm. 160 Length of Mains (Kms) 95 Contract Value in Ml. QR HBK Co. Contractor Apr 2006 start Date Oct 2008 Compl. Date

  13. Project #: GTC 71/2005 Upgrading of Pumping Stations at Salwa Industrial Area & Bani Hajer Title Description of Works Replacement of 32 old pumps with new VFD pumps at 5 water Stations, Old Salwa, New Salwa, Airport, Salwa Indut. Area and Bani Hajir including replacement of old equipment. Contract Value in Ml. QR 132 Torishima Contractor May 2006 Oct 2007 Compl. Date Start Date

  14. Reservoirs & Pump stations Pipelines Works Replacement Works Future Projects Under Tendering

  15. Doha South Reservoir and Associated Pipeline Title Description of Works 4 nos. Reservoirs and 8 pumps each of 450 liter per second at 55 meter head 35 Length of Mains (Kms) Madinat Al Shamal RPS & Associated Pipelines Title One 6 MIG RC reservoir + 4 new pumps each of 125 liter per second at 40 meter head. Description of Works

  16. PermanentReservoir & Pumping Station at Shahaniyah to Doha Title 600mm dia pipeline, in addition to one6MIGD Reservoir and New pump house including 4 New pumps Description of Works Length of Mains (Kms) 11

  17. Upgrading of West bay & Gharafa Water Stations Title Supply and lay of DI pipes ranging in size from 400 mm to 900 mm+ Pump Stations Description of Works Length of Mains (Kms) 22.6 Ext. of Mains at Doha Suburbs Title Supply and lay of DI pipes ranging in size from100 mm to 900 mm. Description of Works Length of Mains (Kms) 118

  18. Provision of Distribution Networks at Doha & North Area (Phase1) Title Description of Works Supply and lay of DI pipes ranging in size from 100 mm dia. to 600 mm dia. at Doha and North Qatar 265 Length of Mains (Kms) Provision of Distribution Networks at Doha &South Area (Phase1) Title Supply and lay of DI pipes ranging in size from100 mm to 400 mm. Description of Works 107 Length of Mains (Kms)

  19. Replacement of Mains at Doha (Package-3) Title Supply and lay of DI pipes ranging in size from100 mm to 900 mm. Description of Works 100 Length of Mains (Kms) Replacementof Old Pipes at Various Locations Title Supply and lay of DI pipes ranging in size from100 mm to 400 mm. Description of Works Length of Mains (Kms) 121

  20. Replacement of Dist. Mains at Doha Vicinity, Wakrah & Wukair package-2 Title Supply and lay of DI pipes ranging in size from100 mm to 600 mm. Description of Works 138 Length of Mains (Kms)

  21. BUDGET

  22. Thanks Presented By: Eng. Mohamad Thani AL-Maadead Head of design Water Projects Kahramaa web site www.km.com.qa