1 / 10

Safe by Design Group – PSLG Safety Forum 14 th December 2012

Safe by Design Group – PSLG Safety Forum 14 th December 2012. Paul Clark -IP (Central) Head of Engineering Tony Wilkins - SBDG Chairman (Mott McDonald) Jason Johnston – IP Programme Engineering Manager. Safe by Design (SbD) - Overview. Safe by Design Programme. Design Risk Assessment.

denna
Télécharger la présentation

Safe by Design Group – PSLG Safety Forum 14 th December 2012

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Safe by Design Group – PSLG Safety Forum 14th December 2012 Paul Clark -IP (Central) Head of Engineering Tony Wilkins - SBDG Chairman (Mott McDonald) Jason Johnston – IP Programme Engineering Manager

  2. Safe by Design (SbD) - Overview Safe by Design Programme Design Risk Assessment Early Focus on Buildability and Temporary Works CDM Roles & Responsibilities Lessons Learnt Procurement & Programme Plan Plan Plan Plan Plan Develop Develop Develop Develop Develop Implement Implement Implement Implement Implement Review Review Review Review Review BAU CONTINUOUS IMPROVEMENT

  3. PSLG Feedback (1) – Progress to date • Designer’s Risk Assessment • Implementation phase, sharing ideas capacity added to the SbD collaboration site • New multi-disciplinary PAN/0082 published Oct 2012 • Red triangles on drawings adopted to highlight risks from DRA • Early focus on Temporary Works and Buildability • Guidance notes uploaded onto collaboration site • Key messages being incorporated into Contract Requirements Technical

  4. Standard Design – Use of Warning Triangles 4

  5. PSLG Feedback (2) – Progress to date • CDM Roles / Responsibilities • Development complete • Implementation challenges • Lessons learnt • Examples received • Uploaded onto collaboration site • Engagement challenges • Procurement & Programme • Include commitment to SbD in CRT, mid tender reviews and tender assessment • Wider adoption of collaborative working and ECI

  6. Safe by Design Forward Plan 6

  7. PSLG Feedback – Future Initiatives • Cross discipline representation on 2013 Safety by Design Steering Group endorsed • Behavioural change foundation to SbD endorsed • SbD Group to consider and report back on measures to be put in place to monitor the effectiveness of implementation • ORR feedback on recent Safety by Design audits to be disseminated • The need to coordinate cross discipline / cross route SbD initiatives was emphasised

  8. Future Governance of SbD

  9. Mott MacDonald Actions

  10. Safe by Design Questions

More Related