1 / 5

ENGINEERING MODUL FORM 4

ENGINEERING TECHNOLOGY. Manufacturing > Communication > Transportation and Power > Construction > Industrial Design. ENGINEERING MODUL FORM 4. CHAPTER 9. HYDRO ELECTRIC POWER STATION. Produced by: MUHAMMAD AMIR B. RAFIDI MUHAMMAD SHAFIQ B AHMAD NURUL JANNAH BT RAMLI

deo
Télécharger la présentation

ENGINEERING MODUL FORM 4

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ENGINEERING TECHNOLOGY Manufacturing > Communication > Transportation and Power > Construction > Industrial Design ENGINEERING MODUL FORM 4

  2. CHAPTER 9 HYDRO ELECTRIC POWER STATION • Produced by: • MUHAMMAD AMIR B. RAFIDI • MUHAMMAD SHAFIQ B AHMAD • NURUL JANNAH BT RAMLI • JASHIDATUL BT GHAZALI

  3. A HYDROELECTRIC POWER STATION POTENTIAL ENERGY KINETIC ENERGY MECHANICAL ENERGY ELECTRICAL ENERGY

  4. HYDROELECTRIC DAMS • In Perak alone, there are seven hydroelectric dams; • Temenggor Dam – 382 MW • Bersia Dam – 69 MW • Kenering Dam – 108 MW • Sungai Piah Dam – 70 MW • Chenderoh Dam – 41 MW • Jor Batang Padang Dam – 100 MW • Who Dam – 150 MW

  5. COMPARISON ON THE ADVANTAGES & DISADVANTAGES OF ELECTRICAL POWER STATIONS

More Related