1 / 8

2013 CREA Energy Innovation Summit 2 MW Solar Project

2013 CREA Energy Innovation Summit 2 MW Solar Project. Location of Project. Hwy 7 & Colo Blvd in Adams County. Electricity Production. Hangar 160 Solar Field Commissioned Dec 2012 Maximum Output – 2 MW Energy Output 3,400 MWh / yr 0.25% of United Powers annual energy needs

derica
Télécharger la présentation

2013 CREA Energy Innovation Summit 2 MW Solar Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 2013 CREAEnergy Innovation Summit 2 MW Solar Project

  2. Location of Project • Hwy 7 & Colo Blvd in Adams County

  3. Electricity Production Hangar 160 Solar Field • Commissioned Dec 2012 • Maximum Output – 2 MW • Energy Output • 3,400 MWh /yr • 0.25% of United Powers annual energy needs • Supply 300 -350 homes/yr

  4. Generation Overview • 7,600 solar panels • 300 watts (DC) / panel • 25 yr warranty • Racking System • Wind tested – 120 mph • All Steel • RPS Station • (2) Inverters – 1,000 V UL • 1.85 MVA Transformer • Combiner Box • 19 panel strings • 400 panels / string • Monitoring • Real-time • @ Individual string level

  5. Solar Overview Capacity Factors • Solar 18 to 20 % • Wind 35 to 45 % • Baseload 85 to 95 %

  6. Business Case • Renewable Resource • 3 to 1 multiplier • 0.73 % of RPS • Local Contractors • Samuel Engineering • HT Solar - Mechanical • E Light - Electric • Atlas Landscaping • Construction • 3 Months / Oct - Dec • Primary Metered • Realtime data – connected to SCADA Hangar 160 Solar Field kwh $$ United Power kwh $$ Tri-State Policy 115Bill Credit Option

  7. Community • Good for the Environment • Reduces CO2 Emissions by 5,000 metric tons • Equivalent to planting 750 trees or taking 750 cars off the road • Good for the Economy • Local generation creates local construction jobs • Good for United Power • Cost of Energy is predictable and stable • Helps meet RPS requirements • Net benefit to all co-op members

  8. Renewable Generation & RPS • Continue to develop projects that benefit overall membership • Enhances community presence and co-op reputation • Provides hedge against rising energy prices • Needed to meet higher RPS requirements • Working with Tri-State to develop these small DG projects

More Related