1 / 4

Foamcast

Foamcast. Project data Title : Shortening lead times and improving quality by innovative upgradings of the lost foam casting process Project type: GROWTH project of the EU Reference: G1RD-CT-2000-00417 Period: 01/02/2001 - 31/01/2004 Collaborators: Guillaume Houzeaux. Objectives

diamond
Télécharger la présentation

Foamcast

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Foamcast Project data • Title: Shortening lead times and improving quality by innovative upgradings of the lost foam casting process • Project type: GROWTH project of the EU • Reference: G1RD-CT-2000-00417 • Period: 01/02/2001 - 31/01/2004 • Collaborators: Guillaume Houzeaux

  2. Objectives • To propose a mathematical model for lost foam casting • To develop a numerical method to approximate it

  3. Key numerical ingredients • Level set method to track the interface • Domain decomposition thermal coupling • Fixed-mesh ALE method to cope with the domain deformation • Stabilized finite element methods (flow equations, heat equation, level set transport)

  4. Results

More Related