Traffic and Pedestrian Safety Update for June 2012

Traffic and Pedestrian Safety Update for June 2012. By Richard DeBusk, EHS Division. Traffic and Pedestrian Related Safety Concerns. 33 Safety Concerns received in May – 31 traffic related (94%) Some concerns included: B79 forklift operators – going the wrong way on Glaser Road

dianner
Télécharger la présentation

Traffic and Pedestrian Safety Update for June 2012

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Traffic and Pedestrian Safety Update for June 2012 By Richard DeBusk, EHS Division

  2. Traffic and Pedestrian Related Safety Concerns • 33 Safety Concerns received in May – 31 traffic related (94%) • Some concerns included: • B79 forklift operators – going the wrong way on Glaser Road • Continued concerns at B45/New Fire Station • Uneven pavement on Chu Road/CRT • Stop Sign near B-65/CRT • Several slip hazards in roads/walkways reported (B-15, and B-67) • Can’t use GPS when traveling – not reimbursable by Lab • Began customer feedback survey this month

  3. LBNL Traffic Violations • March 2012 (only after 3/13) • 6 citations issued • All in vicinity of B-71 • April 2012 • 12 citations issued • 1 near Parking Lot L (B-46) • 1 on McMillian Road near GPL • 9 near B-71 • 1 near B-76

  4. Traffic and Pedestrian Safety Observations for May 2012 • Bicyclists on Chu Road • Stopping for Stop Sign • 4 stopped for stop sign (19%) • 17 did not stop at stop sign (81%) • Speeding • 3 were not speeding (14%) • 18 were speeding (86%) • Vehicles on Chu Road • Stopping for Stop Sign • 11 stopped at stop sign (38%) • 18 did not stop at stop sign (62%) • Speeding • 6 were not speeding (21%) • 23 were speeding (79%)

  5. Traffic Fines (Vehicles and Bikes) Violation Fine and Points Construction Zone $234 / 1 $468 / 1 $280 / 1 $560 / 1 $480 / 1 $960 / 1 $234 / 1 $234 / 1 • Failure to stop at a STOP sign • Speeding – 10mph or less in excess of posted speed limit • Speeding - >10mph above posted speed limit • Failure to obey traffic control devices in construction site

  6. Road Safety Day Update