1 / 63

PROSESI WISUDAWAN JURUSAN TEKNIK LINGKUNGAN FAKULTAS TEKNIK SIPIL DAN PERENCANAAN

PROSESI WISUDAWAN JURUSAN TEKNIK LINGKUNGAN FAKULTAS TEKNIK SIPIL DAN PERENCANAAN INSTITUT TEKNOLOGI SEPULUH NOPEMBER SURABAYA 2 OKTOBER 2010. Program S2. Alfi Nurhidayat / 3307 202 713. IPK: 3,10 (Memuaskan) Nilai Tesis: AB Pembimbing Thesis: Prof. Ir. Joni Hermana, MScES, PhD.

dick
Télécharger la présentation

PROSESI WISUDAWAN JURUSAN TEKNIK LINGKUNGAN FAKULTAS TEKNIK SIPIL DAN PERENCANAAN

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PROSESI WISUDAWAN JURUSAN TEKNIK LINGKUNGAN FAKULTAS TEKNIK SIPIL DAN PERENCANAAN INSTITUT TEKNOLOGI SEPULUH NOPEMBER SURABAYA 2 OKTOBER 2010

  2. Program S2

  3. Alfi Nurhidayat / 3307 202 713 IPK: 3,10 (Memuaskan)Nilai Tesis: ABPembimbing Thesis: Prof. Ir. Joni Hermana, MScES, PhD Judul Tesis:Strategi Pengelolaan Air Limbah Domestik dengan Sistem Sanitasi Skala Lingkungan Berbasis Masyarakat di Kota Batu, Jawa Timur Domestic Waste Water Management Strategies with Community Based Environmental Scale Sanitation System in Batu City, Jawa Timur

  4. Ajeng Rudita Nareswari / 3308 202 003 IPK: 3,54 (Sangat Memuaskan)Nilai Tesis: ABPembimbing Tesis: Dr. Ir. Nieke Karnaningroem, MSc Judul Tesis:Evaluasi Sistem Pengumpulan dan Pengangkutan Sampah di Kecamatan Banda Raya, Jaya Baru dan Meuraxa Kota Banda Aceh Evaluation of Collection and Transport System of Municipal Solid Waste in Banda Raya, Jaya Baru and Meuraxa District, Banda Aceh City

  5. Akung Novajanto Sodiq Nu / 3308 202 004 IPK: 3,38 (Memuaskan)Nilai Tesis: ABPembimbing Tesis: Ir. Mas Agus Mardyanto, ME., PhD Judul Tesis:Evaluasi Sistem Drainase di Kota Pasuruan (Kasus Penanganan Genangan di Kecamatan Bugul Kidul)

  6. Shinta Dewi Astari/ 3308 202 006 IPK: 3,54 (Sangat Memuaskan)Nilai Tesis: APembimbing Tesis: IDAA Warmadewanthi, ST., MT., PhD Judul Tesis:Kajian Model Pengelolaan Sampah Berbasis Masyarakat Di Kecamatan Wonocolo Kota Surabaya

  7. Jupri Triwidagdo / 3308 202 008 IPK: 3,38 (Memuaskan)Nilai Tesis: ABPembimbing Tesis: Prof. Ir. Sarwoko Mangkoedihardjo, MScES Judul Tesis:Kajian Pengelolaan Prasarana Lingkungan Permukiman di Panarukan Hilir Sungai Sampean Kabupaten Situbondo Study of Environmental Infrastructure Management of Settlement at The Panarukan Downstream of Sampean River Situbondo

  8. Diah Kusumaningrum / 3308 202 011 IPK: 3,64 (Memuaskan)Nilai Tesis : AB Pembimbing Tesis: IDAA Warmadhewanti, ST., MT., PhD Judul Tesis:Evaluasi Pengelolaan Prasarana Lingkungan Rumah Susun di Surabaya (Studi Kasus : Rusunawa Urip Sumoharjo) Evaluation of Environmental Infrastructure Management of Apartment for Low Income People in Surabaya (Case Study : Rusunawa Urip Sumoharjo)

  9. Euis Nurul Hidayah / 3308 201 005 IPK: 3,86 (Dengan Pujian)Nilai Tesis: APembimbing Tesis:Dr. Ir. Nieke Karnaningroem, MSc Judul Tesis:Penerapan model HP2S terhadap pola pengendapan flok pada proses sedimentasi Implementation of HP2S model towards settling flocs on sedimentation process

  10. Sriliani Surbakti / 3308 201 007 IPK: 3,12 (Memuaskan)Nilai Tesis: ABPembimbing Tesis: Prof. Ir. Wahyono Hadi, MSc, PhD Judul Tesis:Potensi Pengelolaan Sampah Menuju Zero Waste Yang Berbasis Masyarakat Di Kecamatan KedungKandang Kota Malang Solid Waste Management Potential Towards Zero Waste Management Of Community Based Solid Waste in KedungKandang District, Malang City

  11. Program S1

  12. Nadia Zahra / 3304 100 001 IPK: 2,97 (Memuaskan)Nilai Tugas Akhir : ABPembimbing Tugas Akhir:Ir. Hari Wiko Indaryanto, M.Eng Judul Tugas Akhir:Evaluasi Sistem Plambing Rumah Susun WonorejoEvaluation of Plumbing System in Rumah Susun Wonorejo

  13. Bayu Yudha Andika / 3305 100 012 IPK: 2,72 (Memuaskan)Nilai Tugas Akhir : BCPembimbing Tugas Akhir:Ir. Mas Agus Mardyanto, ME., PhD Judul Tugas Akhir:Pengolahan Air Kolam Penampungan Lindi dengan Filter Granular Karbon Aktif pada Reaktor HorisontalLeachate Treatment by Granular Activated Carbon Filter in a Horizontal Reactor

  14. Ghani Arasyid / 3305 100 023 IPK: 2,93 (Sangat Memuaskan)Nilai Tugas Akhir : ABPembimbing Tugas Akhir:Prof. Wahyono Hadi Judul Tugas Akhir:Pembuatan Etanol dari Sampah Pasar Melalui Proses Pemanasan dan Fermentasi Bakteri Zymomonas mobilisEthanol Making From Greengrocers Solid Waste Through Heating Process and Fermentation Using Zymomonas mobilis

  15. Ridzky Nanda / 3305 100 069 IPK: 3,13 (Sangat Memuaskan)Nilai Tugas Akhir : AB Dosen pembimbing: Ir. Ati Hartati, MSc Judul Tugas Akhir:Studi Pengelolaan Limbah Industri Sebagai Upaya Penerapan Produksi Bersih Di Pabrik Kelapa Sawit Aek Nabara Selatan - PT. Perkebunan Nusantara III, Labuhan Batu Tengah, Sumatera UtaraStudy On the Management of Industrial Waste for Cleaner Production Implementation at South Aek Nabara Crude Palm Factory - PT. Perkebunan Nusantara III, Central Labuhan Batu, North Sumatera

  16. Fadly Rachman Hakim / 3305 100 073 IPK: 3,13 (Sangat Memuaskan)Nilai Tugas Akhir : AB Pembimbing Tugas Akhir: Ir. M. Razif, MM Judul Tugas Akhir:Penelitian Pengolahan Limbah Pencucian Mobil dengan Koagulasi-Flokulasi secara Batch Research of Coagulation-Flocculation Treatment in Batch for Car Wash Waste water

  17. Sonny Saputra / 3300 100 076 IPK: 3,12 (Sangat Memuaskan)Nilai Tugas Akhir : BCPembimbing Tugas Akhir:Ir. Didik Bambang, MT. Judul Tugas Akhir:Perencanaan MRF di Kecamatan Gedangan SidoarjoMRF Planning in Gedangan SubDistrict, Sidoarjo City

  18. Muhammad Al Bashir / 3306 100 005 IPK: 3,51 (Dengan Pujian)Nilai Tugas Akhir : APembimbing Tugas Akhir:Dr. Ir. Nieke Karnaningroem, MSc Judul Tugas Akhir:Studi Kinerja Instalasi Pengolahan Air Limbah Industri Minuman (Studi Kasus: Industri Minuman PQR, PT XYZ) Performance Study of Wastewater Treatment Plant of Beverages Industry (Case Study: PQR Drinking Industrial, PT XYZ)

  19. Nurrina Azyyati Riski / 3306 100 006 IPK: 3,27 (Sangat Memuaskan)Nilai Tugas Akhir : ABPembimbing Tugas Akhir:Ir. Didik Bambang, MT. Judul Tugas Akhir:Perencanaan Ulang Sistem Plambing dan Pengolahan Air Buangan Mx Mall Kota MalangRedesign of Plumbing System And Waste Water Treatment Of Mx Mall Malang

  20. Eka Masrifatus Anifah / 3306 100 016 IPK: 3,37 (Sangat Memuaskan)Nilai Tugas Akhir : APembimbing Tugas Akhir:Welly Herumurti, ST., M.Eng Judul Tugas Akhir:Studi Kemampuan Lumpur Alum untuk Menurunkan Konsentrasi Ion Logam Zn (II) pada Limbah Cair Industri Elektroplating Study of Alum Sludge Capability to Remove Zn (II) Metal Ions Concentration on Electroplating Industry Waste Water

  21. Ardhana Wiranata / 3306 100 017 IPK: 3,13 (Sangat Memuaskan)Nilai Tugas Akhir : ABPembimbing Tugas Akhir:Ir. Didik Bambang, MT. Judul Tugas Akhir:Perencanaan Ulang Sistem Plambing Kapal Musthika Kencana II Redesign of Plumbing System of KM. Musthika Kencana II

  22. Maritha Nilam Kusuma / 3306 100 021 IPK: 3,24 (Sangat Memuaskan)Nilai Tugas Akhir : ABPembimbing Tugas Akhir:Prof. Ir. Joni Hermana, MScES., PhD Judul Tugas Akhir:Kajian Emisi Karbon Pada Industri Air Minum Dalam Kemasan (Studi Kasus : PT XYZ) Study of Carbon Emission at The Bottled Water Industry (Case Study : PT XYZ)

  23. Hasriyani / 3306 100 028 IPK: 3,47 (Sangat memuaskan)Nilai Tugas Akhir : APembimbing Tugas Akhir:Prof. Ir. Joni Hermana, MScES., PhD Judul Tugas Akhir:Studi Kinerja Boezem Morokrembangan Pada Penurunan Kandungan Total Solid dan Zat Organik sebagai Permanganate Value (PV) Study of Boezem Morokrembangan Performance on Removing Total Solid and Organic Matters as Permanganate Value (PV)

  24. Karina Rindang Trapsila Siwi / 3306 100 030 IPK: 3,55 (Dengan Pujian)Nilai Tugas Akhir : APembimbing Tugas Akhir:Abdu Fadli Assomadi, Ssi, MT. Judul Tugas Akhir:Aplikasi Elektrokoagulasi Menggunakan Pasangan Elektroda Aluminium untuk Pengolahan Air dengan Sistem Kontinyu Application of Electrocoagulation Using Aluminium Electrode Pairs for Water Treatment with Continuous System

  25. Citra Dita Maharsy Suaidy / 3306 100 032 IPK: 3,05 (Sangat Memuaskan)Nilai Tugas Akhir : BPembimbing Tugas Akhir:Dr. Ir. Nieke Karnaningroem, MSc Judul Tugas Akhir:Studi Peningkatan Kapasitas Pengolahan di Instalasi PDAM Ngagel I Surabaya Study of Capacity Uprating for Water Treatment Plant Ngagel I Surabaya

  26. Noriko Masyitah Reza / 3306 100 038 IPK: 3,26 (Sangat Memuaskan)Nilai Tugas Akhir : ABPembimbing Tugas Akhir:Prof. Dr. Yulinah Trihadiningroem, MAppSc Judul Tugas Akhir:Perencanaan Sistem Pengelolaan Sampah Kawasan Wisata Kebun Binatang Surabaya (KBS) dan Kecamatan Wonokromo di Kota Surabaya Design of Solid Waste Management System of Surabaya Zoo (KBS) Area And Wonokromo District in Surabaya City

  27. Dandy Kurnia Herlambang / 3306 100 041 IPK: 3,00 (Sangat Memuaskan)Nilai Tugas Akhir : ABPembimbing Tugas Akhir:Dr. Ir. Nieke Karnaningroem, MSc Judul Tugas Akhir:Evaluasi Kinerja Instalasi PDAM NGAGEL II Surabaya Performance Evaluation of Water Treatment Plant Company NGAGEL II Surabaya

  28. Ratna Gumilang / 3306 100 043 IPK: 3,31 (Sangat Memuaskan)Nilai Tugas Akhir : ABPembimbing Tugas Akhir:IDAA Warmadewanthi, ST., MT., PhD Judul Tugas Akhir:Studi Penentuan Koefisien Biodegradasi Air Limbah Domestik Influen Boezem Morokrembangan Study to Determine Biodegradation Coefficient of Domestic Wastewater in Morokrembangan Boezem Influent

  29. Lina Pratiwi Rahmadewi / 3306 100 045 IPK: 3,45 (Sangat Memuaskan)Nilai Tugas Akhir : ABPembimbing Tugas Akhir:Prof. Dr. Yulinah Trihadiningroem, MAppSc Judul Tugas Akhir:Perencanaan Material Recovery Facility di Kecamatan Sukolilo - Surabaya Design of Material Recovery Facility at Sukolilo District - Surabaya

  30. Rizky Mega Kusuma Putri / 3306 100 046 IPK: 3,11 (Sangat Memuaskan)Nilai Tugas Akhir : ABPembimbing Tugas Akhir:Prof. Dr. Yulinah Trihadiningroem, MAppSc Judul Tugas Akhir:Perencanaan Material Recovery Facility di Kecamatan Gubeng, Kota Surabaya Design of Material Recovery Facility at Gubeng District, Surabaya City

  31. Abdul Aziz / 3306 100 050 IPK: 3,09 (Sangat Memuaskan)Nilai Tugas Akhir : ABPembimbing Tugas Akhir:Abdu Fadli Assomadi, Ssi, MT. Judul Tugas Akhir:Pemetaan Kecukupan Vegetasi Untuk Mereduksi Konsentrasi Karbon Dioksida (CO2) di Kampus ITS Surabaya Mapping of Vegetation Sufficiency to Reduce Carbon Dioxide (CO2) Concentration at Campus ITS Surabaya

  32. Dachliana Saraswati / 3306 100 052 IPK: 3,30 (Sangat Memuaskan)Nilai Tugas Akhir : ABPembimbing Tugas Akhir:IDAA Warmadewanthi, ST., MT., PhD Judul Tugas Akhir:Upaya Penanganan Limbah Batubara Sisa Proses Pembakaran (Studi Kasus PT. Surya Rengo Containers, Krian-Sidoarjo) Treatments of Coal Combustion Residues (Case Study of PT. Surya Rengo Containers)

  33. Andri Lukismanto / 3306 100 063 IPK: 3,45 (Sangat Memuaskan)Nilai Tugas Akhir : APembimbing Tugas Akhir:Abdu Fadli Assomadi, Ssi, MT. Judul Tugas Akhir:Aplikasi Elektrokoagulasi Pasangan Elektroda Besi untuk Pengolahan Air dengan Sistem Kontinyu Application of Electrocoagulation Iron Electrode Pairs for Water Treatment with Continuous System

  34. Ratri Adiastari / 3306 100 069 IPK: 2,82 (Sangat Memuaskan)Nilai Tugas Akhir : BPembimbing Tugas Akhir:Susi Agustina, ST., MT Judul Tugas Akhir:Kajian Mengenai Kemampuan Ruang Terbuka Hijau (RTH) Dalam Menyerap Emisi Karbon di Kota Surabaya Study of Green Open Space Ability to Adsorb Carbon Emission Surabaya City

  35. Widya Sagita Irsyada / 3306 100 071 IPK: 3,01 (Sangat Memuaskan)Nilai Tugas Akhir : APembimbing Tugas Akhir:Prof. Ir. Joni Hermana, MScES., PhD Judul Tugas Akhir:Kajian Perilaku Masyarakat Terhadap Upaya Mitigasi Pencemaran Udara Di Kota Surabaya Study Of People Behavior on the Implementation Of Air Pollution Mitigation Program in Surabaya

  36. Desy Gigih Pratiwi / 3306 100 072 IPK: 3,10 (Sangat Memuaskan)Nilai Tugas Akhir : BPembimbing Tugas Akhir:Ir. Didik Bambang, MT. Judul Tugas Akhir:Perencanaan Ulang Instalasi Pengolahan Air Limbah (IPAL) PG. Toelangan, Tulangan-Sidoarjo Redesign of Waste Water Treatment Plant of Toelangan Sugar Company, Tulangan-Sidoarjo

  37. Fitri Arini / 3306 100 073 IPK: 3,41 (Sangat Memuaskan)Nilai Tugas Akhir : ABPembimbing Tugas Akhir:Susi Agustina, ST., MT Judul Tugas Akhir:Studi Kontribusi Kegiatan Transportasi Terhadap Emisi Karbon di Surabaya Bagian Timur Study of Transportation Activities Contribution Towards Carbon Emission in Eastern Part of Surabaya

  38. Ririh Asmawati / 3306 100 076 IPK: 2,96(Sangat Memuaskan)Nilai Tugas Akhir : BPembimbing Tugas Akhir:Welly Herumurti, ST., M.Eng Judul Tugas Akhir:Studi Kemampuan Lumpur Alum Untuk Menurunkan Konsentrasi Fosfat Pada Limbah Industri Pupuk Study of Alum Sludge Capability to Remove Phosphate Concentration on Fertilizer Industry Waste Water

  39. Renandia Tegar Asririzky / 3306 100 079 IPK: 2,91(Sangat Memuaskan)Nilai Tugas Akhir : APembimbing Tugas Akhir:IDAA Warmadewanthi, ST., MT., PhD Judul Tugas Akhir:Studi Carbon Footprint (CO2) dari Kegiatan Permukiman di Kota Surbaya Bagian Tengah (Pusat dan Selatan) Study of Carbon Footprint (CO2) From The Settlement Activities In The Middle Of Surabaya City (Central and South)

  40. Tisna Ayuning Tyas / 3306 100 080 IPK: 3,06 (Sangat Memuaskan)Nilai Tugas Akhir : ABPembimbing Tugas Akhir:Prof. Dr. Yulinah Trihadiningroem, MAppSc Judul Tugas Akhir:Kajian Pengelolaan Sampah di Kecamatan Bubutan, Kota Surabaya Study of Solid Waste Management at Bubutan District, Surabaya City

  41. Nicolaus / 3306 100 081 IPK: 2,94 (Sangat Memuaskan)Nilai Tugas Akhir : BPembimbing Tugas Akhir:Ir. M. Razif, MM Judul Tugas Akhir:Efisiensi Program Car Free Day Terhadap Penurunan Emisi Karbon The Efficiency ff Car Free Day Program to Reduce Carbon Emission

  42. Desi Alinawati Affandi / 3306 100 082 IPK: 3,28 (Sangat Memuaskan)Nilai Tugas Akhir : ABPembimbing Tugas Akhir:Prof. Ir. Wahyono Hadi, MSc., PhD Judul Tugas Akhir:Peningkatan Kualitas Air PDAM Cepu di Sistem Distribusi dengan Menggunakan Mikrofilter Lilitan Kain Ditinjau dari Parameter Kekeruhan, Warna dan Zat Organik Enhancement of Drinking Water Quality of Water Treatment Plant Cepu within Water Distribution System using Fabric Loops Microfilter with Observed Parameters Turbidity, Color and Organic Matter

  43. Norra Phersiana / 3306 100 083 IPK: 3,30 (Sangat Memuaskan)Nilai Tugas Akhir : BPembimbing Tugas Akhir:Ir. M. Razif, MM Judul Tugas Akhir:Analisa dan Pemetaan Kebisingan Akibat Aktifitas Kerja di PT. XYZ Analysis and Mapping of Noise due to Work Activities at XYZ Company

  44. Candra Dwi Ristika / 3306 100 084 IPK: 3,14 (Sangat Memuaskan)Nilai Tugas Akhir : ABPembimbing Tugas Akhir:Ir. Didik Bambang, MT. Judul Tugas Akhir:Perencanaan Sistem Plambing Pada Kereta Api Sancaka dan Stasiun Surabaya (Gubeng-Semut) Design of Plumbing System Plan in Sancaka Train and Surabaya Railway Station (Gubeng-Semut)

  45. Zafira Nadida / 3306 100 087 IPK: 3,33 (Dengan Pujian)Nilai Tugas Akhir : ABPembimbing Tugas Akhir:Welly Herumurti, ST., M.Eng Judul Tugas Akhir:Studi Kemampuran Lumpur Alum untuk Menurunkan Konsentrasi Fluorida dalam Air Limbah Industri Pupuk Study on Alum Sludge Capability to Reduce Fluoride Concentration in Fertilizer Industry Waste Water

  46. Muhimatul Khoiroh / 3306 100 088 IPK: 3,15 (Sangat Memuaskan)Nilai Tugas Akhir : ABPembimbing Tugas Akhir:Prof. Ir. Wahyono Hadi, MSc., PhD Judul Tugas Akhir:Peningkatan Kualitas Air PDAM CEPU di Sistem Distribusi dengan Menggunakan Mikrofilter Lilitan Kain Ditinjau dari Parameter Total Coli Enhancement of Drinking Water Quality of Water Treatment Plant Company in Cepu within Water Distribution System using Fabric Loops Microfilter with Observed Parameter Total Coli

  47. Tri Rahmawati / 3306 100 089 IPK: 3,35 (Sangat Memuaskan)Nilai Tugas Akhir : BCPembimbing Tugas Akhir:Prof. Dr. Ir. Sarwoko Mangkoedihardjo, MScES Judul Tugas Akhir:Perencanaan Multiple Tray Aerator untuk Menurunkan Kandungan Besi (Fe) dan Mangan (Mn) pada Air Baku di PDAM Kota Lumajang Design of Multiple Tray Aerator to Reduce Iron (Fe) and Manganese (Mn) on Raw Water at Water Treatment Plant Lumajang City

  48. Lailatul Azizah / 3306 100 090 IPK: 3,31 (Sangat Memuaskan)Nilai Tugas Akhir : APembimbing Tugas Akhir:IDAA Warmadewanthi, ST., MT., PhD Judul Tugas Akhir:Studi Pengaruh Salinitas Terhadap Proses Degradasi Sampah TPA Benowo Study on The Effect of Salinity in Biodegradation Process at Benowo Final Disposal Site

  49. Annas Taufan / 3306 100 091 IPK: 3,07 (Sangat Memuaskan)Nilai Tugas Akhir : ABPembimbing Tugas Akhir:Abdu Fadli Assomadi, Ssi, MT. Judul Tugas Akhir:Model Alat Pengolahan Fe Dan Mn Menggunakan Sistem Venturi Aerator dengan Variabel Kecepatan Aliran dan Jumlah Pipa Venturi Instrument Model of Fe and Mn Treatment using Venturi Aerator with Variables Venturi Flowrate and Pipe Quantity Variables

  50. Nur Maya Sari / 3306 100 098 IPK: 3,10 (Sangat Memuaskan)Nilai Tugas Akhir : ABPembimbing Tugas Akhir:Ir. Bowo Djoko, M.Eng Judul Tugas Akhir:Studi Kinerja Biosand Filter Untuk Pengolahan Air Minum Ditinjau Terhadap Parameter Kekeruhan dan Besi Study on the Performance of Biosand Filter for Drinking Water Treatment for Parameters Turbidity and Iron

More Related