An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CRUISE TERMINAL ADVISORY PANEL FINDINGS September 25, 2007

  2. Advisory Panel Considerations History & Future of San Francisco Cruise Business • San Francisco in the World market • Demand forecast • Economic & community benefits to the City • Cruise industry standards and expectations • Does San Francisco need a new terminal? • If so ─ WHERE ? ─ HOW MUCH ? ─ HOW TO FINANCE ? ─ Can it be phased? ─ What should we do now?

  3. The Facts • Two public-private partnership attempts to build new terminal have failed. • Port needs new terminal: 1. Based on demand, size of ships, and cruise industry expectations. 2. Brings tourist dollars. Enhances City’s reputation as a world class, waterfront city. Preserves maritime industry; Jobs. Pier 35 is substandard.Only a 5-7 year life.

  4. The Current Situation at Pier 35 • Needs pier substructure and improved shed. • Only 5-7 years of life remaining. • Does not meet current industry standards. • Requires major investment: Pier is too short, aprons too narrow, shed too small.

  5. Other Piers Studied • Pier 30-32 optimal as a two-berth facility. Pro: No dredging on Eastern face Con: Seismic retrofit cost prohibitive. • Some Southern Waterfront piers may be promising, but not viable in short-term.

  6. Pier Conclusion: 27 • Pros: • Has been used as back-up berth. • Adequate berth length. • Large pier shed. • Pier in good shape. • Possibility of Pier 29 as future berth • Cons: needs dredging / only one berth.

  7. Pier 27 Options • Minimal improvements:Will not meet industry standards. $22–26 million.

  8. Pier 27 Options • Acceptable improvements:A functional terminal meeting industry standards. $50–60 million.

  9. Pier 27 Options • Optimal improvements:Two berth facility. $100 million.

  10. Pier 27 Options • Advisory Panel recommends Option 2: Acceptable Improvements

  11. Pier 27 Funding • $18 million from condo project sale proceeds for new terminal. • Potential revenue to finance: • Raise passenger fees • Special events • City tax revenue

  12. Next Steps • Develop & design funding plan • Build one-berth terminal and explore secondary berths in short-term. • Develop a longer-term cruise berthing strategy.

  13. Advisory Panel FINAL RECOMMENDATIONS 1. San Francisco needs a new cruise terminal 2. Pier 35 must be replaced 3. Commence immediately with a replacement of the primary berth

  14. Advisory Panel FINAL RECOMMENDATIONS 4. Designate Pier 27 as the primary berth 5. Commence development of primary berth design 6. Develop primaryberth financing

  15. FINAL RECOMMENDATIONS 7. Identify short-term implementation of secondary berths 8. Develop longer-term berthingstrategy 9. Implement shore side power 10. Re-affirm open space in South Beach & Northeast Waterfront

  16. CRUISE TERMINALADVISORY PANEL Frankie Lee ∙ Former Port Commissioner/ (Chair) SOHA Engineering Steve Falk ∙ San Francisco Chamber of (Vice (Chair) Commerce William Adams ∙ International Longshore & Warehouse Union Joe D’Alessandro∙ San Francisco Convention and Visitors Bureau

  17. CRUISE TERMINALADVISORY PANEL Ellen Johnck ∙ Bay Planning Coalition Redmond Kernan ∙ RFK Associates Bruce Krumrine ∙ Princess Cruises John Martin ∙ San Francisco Airport Stefano Pinna ∙ Metro Cruise Services Ben Rosenfield ∙ City Administrator’s Office Michael Sweet ∙ McNutt & Litteneker, LLP/ Rincon Pt-South Beach CAC