1 / 9

Equipment Care

Equipment Care. Aim. To highlight the importance of Equipment Care and briefly outline the process of how it is measured. Why do we Care for our Equipment?. The Process. Unit Policy – Outlining Comdts Commitment UECD & Regular Meetings Held (Minutes produced)

dixon
Télécharger la présentation

Equipment Care

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Equipment Care

  2. Aim To highlight the importance of Equipment Care and briefly outline the process of how it is measured

  3. Why do we Care for our Equipment?

  4. The Process • Unit Policy – Outlining Comdts Commitment • UECD & Regular Meetings Held (Minutes produced) • MEI – Qualified REME Personnel – Unit Responsibility • ECI – Land Army Team – Annual Inspection (Graded)

  5. ECI • Annual assessment of a unit’s equipment care and management systems. • Carried out by ECI Team on behalf of AD Eqpt Plans. • Contributes to a unit’s MFP assessment. • Ensures that units are carrying out MEI effectively and advises on how to improve their standards of equipment care. • Monitor standards of equipment care, repair and inspection.

  6. Important Bits • Audit Trail • Record of Training • Programming of Equipment Care (Weapon Cleaning on Company Weekends) • Education (Notice Boards and Training) • Record of Faults and Correct Procedures • Record of Checks and Correct Procedures • Record of Cleaning (Book and Company Checks) • Stores & Equipment Checks – CAA’s Monthly, OC’s quarterly and Snap Checks (Paperwork for Audit)

  7. Mandatory Equipment Inspection (MEI) • It embraces all required L1 and L2 inspections. • MEI frequency will depend on the type of Equipment held. • Cadet GP A2 – 12monthly • Other Weapon systems 6 monthly (No. 8) • The responsibility for ensuring MEI is carried out on time, and by appropriately qualified personnel, is vested in the CO. • MEI is not in itself a legal requirement, but our Duty of Care is. • In agreement with VOSA, the annual MEI of a vehicle is equivalent to an MOT.

  8. Weapon Inspection’s • Lt Pepper will now cover a number of the main areas when it comes to inspecting the weapons

  9. QUESTIONS?? • Remember – • Use it – clean it • Break it – Report it • No matter what, record it for audit purposes

More Related