Pipeline and Hazardous Materials Safety Administration (PHMSA) Manufacturer’s Application Process

Pipeline and Hazardous Materials Safety Administration (PHMSA) Manufacturer’s Application Process. Manufacturers Webinar Washington D.C. November 17, 2016 Presented by : Neil Benninghoven Pressure Vessels Division (PHH33) Pipeline and Hazardous Materials Safety Administration (PHMSA).

dmichaelson
Télécharger la présentation

Pipeline and Hazardous Materials Safety Administration (PHMSA) Manufacturer’s Application Process

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Pipeline and Hazardous Materials Safety Administration (PHMSA)Manufacturer’s Application Process Manufacturers Webinar Washington D.C. November 17, 2016 Presented by : Neil Benninghoven Pressure Vessels Division (PHH33) Pipeline and Hazardous Materials Safety Administration (PHMSA)

  2. PHMSA's mission is to protect people and the environment by advancing the safe transportation of energy and other hazardous materials that are essential to our daily lives. Our Mission

  3. Discussion Points • Manufacturer Applications • Additional Information Requests • What Happens Next

  4. Discussion Points (Cont.) • Technical Review • Approval Application • Design Drawings • Summary Sheet

  5. Manufacturer Application • Separate Application from IIA to PHMSA • 49 CFR 107.705 & 107.807 • Cover letter explaining the request • Complete design and marking drawings • Summary sheet for all documents and test results

  6. Manufacturer Application (cont.) • Chemical Analysis Report • 49 CFR 178.35(2)(i)(ii) • IIA Stamped Copies of Drawings • 49CFR 107.803(5)(6)

  7. Additional Information Requests • 49 CFR 107.709(b) • 30 days to respond • Denial After no response • IIA’s / U.S. Agents will now be copied on any/all requests for additional information

  8. Additional Items of Concern • Combined Applications for different areas of approval • RIN and Competent Authority (CA), must be two separate applications • Incomplete Drawings • Missing information on manufacturer drawings • Missing Pre-Audit Reports • Need to be completed prior to submittal of application for approval

  9. Technical Review Discussion Points • Approvals Application • Design Drawing • Sample Design Drawing • Summary Sheet

  10. What do we Need in an Application? • Cover letter explaining the request • Complete design drawing - a fully dimensioned sketch including minimum wall thickness, service and test pressure, cylinder volume and weight, the method of manufacture, heat treatment, material chemistry,  guaranteed mechanical properties, batch test requirements, design calculations and marking etc. • Summary sheet for all the test results: • Batch and Design qualification test results • Hydraulic pressure test, Hardness test reports etc. • Dimensional checks and UE examination results/reports • Include photos of tests where relevant. • Drawing and test reports should be in English and stamped by the IIA. • Request a limit on applications to one subject/design type (< 4 designs)

  11. Design Drawing Must include the following: • Reference to specification to which the design complies. • A fully dimensioned sketch covering all dimensions as required in the reference standard; Marking drawing or outline as appropriate • Service and test pressures (in proper units), Min volume and Empty cylinder weight • Method of manufacture, Material chemistry, Heat treatment

  12. Design Drawing (cont.) • Mechanical Properties (Tensile test, Bend/Flattening and Charpy tests etc.) • Tests on every cylinder such as Hardness test, Thickness check etc. • Performance tests required on batch basis (Burst, Cycle, Flaw tests etc.) • Sidewall thickness calculations (as required by the specification / standard) • Proper title for the drawing clearly indicating the scope and any limitation of the applicable design. Note: Test requirements – please do not copy text verbatim from the spec but provide the actual acceptable test value/range

  13. Sample Design Drawing *XYZ AC *XYZ

  14. Application Summary Sheet • Should reference: • All documents (drawings and test reports) provided in the report on a spreadsheet format. • Number all document's in the report and indicate their location (page number) on the summary sheet. • The standard to which the design is made and show that the design satisfies the requirements of applicable clauses. • The design and marking drawings provided • Provide: • Batch test (Tensile, Bend/Flattening, Charpy tests etc.) requirements and the results/reports • Design qualification test ( Burst, Cycle, Pre-flaw tests etc.) requirements and the results/reports • Hydraulic pressure test, Hardness test results/reports etc. • Dimensional checks and UE examination results/reports • Include photos of tests where relevant such as; Burst, Cycle, Flattening etc.

  15. Sample Summary Sheet for Approvals Application

  16. Questions? DISCLAIMER: Please note that just submitting the application following the above recommended format does not guarantee an approval by itself. The formal approval depends on providing satisfactory drawings and test results.