An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Sustainability for Water Quality Infrastructure: South Bethany’s Tidal Pump System Presented to: Tri-Association Annual Conference August 27, 2008 Presented by: KCI Technologies, Inc. Oceaneering International Inc.

  2. Agenda • Sustainability in Water Infrastructure • Project Introduction • The Tides • A Tidal Pump • Moving Forward

  3. Sustainability in Water Infrastructure • Sustainability – • A state or process that can be maintained indefinitely • Balance Environment/Social/Economic Components • EPA defines it with 4 components- • Asset Management • Infrastructure Financing • System Efficiency • Innovative Solutions • Power use by water infrastructure is significant • What can be done to change it? • Innovation

  4. Sustainability in Water Infrastructure • South Bethany Tidal Pump Fits the definition on all EPA points but especially for: • System which is fiscally maintainable by projected capital resources • Energy Efficiency • Innovative Solutions

  5. South Bethany’s Inland Canals • South Bethany, Delaware canals • Built 1950s and 60s. • To increase waterfront property. • No effective means of circulation with ocean water • 1600’s inlet existed at the site • Increased stormwater loading over time

  6. South Bethany’s Inland Canals • Circulation to ocean – • Ocean City inlet -14 miles south • Indian River inlet - 7 miles north Result = Low flushing • Flow minimal to inlets. • Flushing time in canals • normal = > 120 days at dead end. • Flush to ocean based on residence time in inland bays

  7. The Problem • Poor circulation • Low oxygen levels • Excessive nutrient loading Algae Blooms Declining Shellfish and Marine Life Communities

  8. A Solution • Lloyd Hughes – Engineer and retired South Bethany Councilman devised concept for a tidal pump system • Worked up concept starting in 2002 • Produced system layout for evaluation • Conversed with regulatory personnel for initial buy-in • City Council approved funds to investigate system

  9. The Tide as Power • Kinetic - • Tidal generation turbines • Potential - • Tidal barrage generating stations • A Tidal powered pump?

  10. Tidal Pump Concept • Conventional Pump = Head delivered by impellors or other means powered by electricity / fossil fuels • Tidal Pump = Head to drive circulation delivered by the tide only

  11. The Tides • Tide cycles vary based on location on earth • Ocean and Inland Bays Tides are diametrically opposed • normally +/- 6 hours shifted • When High Tide in the Ocean its low in the canals • When Low tide in the Ocean its high tide in the canals

  12. Canal High Tide Ocean Low Tide = Canal Low Tide Ocean High Tide = Tidal Pump Concept • Tidal differential as power • Tides opposite between ocean and canal system • Draws water back and forth through underground pipes • Creates circulation

  13. Tidal Pump Concept

  14. First Steps • South Bethany evaluation • Enterix hired to assess viability by modeling preliminary system as well as the mixing predicted through • Limited study – one scenario only • Results positive – proved system could work • Town took next step for preliminary engineering study and cost estimate

  15. Design Study • KCI Teamed with Oceaneering International Inc. to complete a design study • Budgetary study • Preliminary Design • Evaluation of flow viability • Evaluation of environmental factors

  16. Design Challenges • Low flow velocity • 1 - 2 fps • 2,000 – 4,000 gpm • Environmental factors • Ocean currents, storms and waves • Scour • Ocean depth • Marine growth and fouling

  17. Innovative Solutions • Careful consideration of environmental factors • Hydraulic analysis using WaterCAD • Fully sustainable, tidal power • Fully-closed system • Similar to low pressure water distribution • Applied water distribution design and modeling techniques

  18. System Modeling • WaterCADD chosen to hydraulically model system • Variable system configurations evaluated • Roughness factors varied based on material and fouling scenarios • System similar to a potable water distribution system - closed

  19. Pipe Evaluation • Based upon the WaterCADD results the optimum size for the pipe lines could be determined. • Evaluation of a wide range of options of material completed for the system

  20. Environmental Considerations • Sediment Loading • Geology • Corrosivity • Permitting • Green Power • 8,000 kW/yr • = to 1 hp pump

  21. System Elements • Circulation of 3 mgd • 2 miles of underground pipe - HDPE • 36” – 5,010 feet on shore • 36” – 3,200 feet offshore to 2 I/O structures • 12” - 2,026 feeder lines • Dual intake/outfall structures 1,600 feet offshore • Access manholes 12 Manholes • System of manual and automated control valves for regulation of system • 11 Control Valves • 9 on the 12” manual • 2 on the 36” automatically actuated • Propeller meter for monitoring flow

  22. Project Status • Design Study completed Summer 2007 • Town conversing with regulators • To address potential permitting issues • Project funding is still pending • Grant funding will partially depend on preliminary DNREC approval • $5 to $6 Million estimated construction cost

  23. Moving Forward • Chance to harness alternative energy source and create sustainable infrastructure • ~ zero energy footprint • Green power concept • Tidal Pump application not explored before • Reduction in green house gas emissions • Potential applications world wide • Award Winning concept • ACEC Maryland • AAEE National Honor Award

  24. Questions and Answers