ENERGY CONSERVATION OPPORTUNITIES IN TEXTILE MILLS

ENERGY CONSERVATION OPPORTUNITIES IN TEXTILE MILLS . STRIKING CASE STUDIES A PRESENTATION BY TENSOR CONSULTING ENGINEERS (CHENNAI) PVT.LTD 08.08.09 at TIRUPUR. CASE STUDY 1 Present System A modern spinning mill located at Madurai of 1Lakh spindles

donagh
Télécharger la présentation

ENERGY CONSERVATION OPPORTUNITIES IN TEXTILE MILLS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ENERGY CONSERVATION OPPORTUNITIES IN TEXTILE MILLS STRIKING CASE STUDIES A PRESENTATION BY TENSOR CONSULTING ENGINEERS (CHENNAI) PVT.LTD 08.08.09 at TIRUPUR

  2. CASE STUDY 1 • Present System • A modern spinning mill located at Madurai • of 1Lakh spindles • AWES supplied by various manufacturers • Centrifugal blowers are used in the AWES • supplied by VXL for 18 cards • Observation • It was observed that the fans are energy in efficient • The operating load of the fans were 45Kw and 47Kw respectively • Cleaning interval of the secondary filter is very frequent • Proposal Implemented • The existing fans were replaced with high efficiency specially designed centrifugal blowers • The energy consumption reduced by 30% ie 32Kw each • The investment for implementing this proposal Rs.8Lakhs • The payback period is 10 months TENSOR CONSULTING ENGINEERS (CHENNAI) PVT LTD

  3. CASE STUDY 2 • Present System • Reputed corporate group of mills located in Tamilnadu • Continuous AWES supplied by various manufacturers • There were totally 36fans in various AWES • Observation • It was observed the existing fans are energy in efficient • Cleaning interval of the secondary filter is very frequent • Proposal Implemented • The energy savings achieved by replacing these centrifugal blowers is between 20% to 40% • The average payback period is just less than an year TENSOR CONSULTING ENGINEERS (CHENNAI) PVT LTD

  4. CASE STUDY 3 • Present System • Reputed corporate group o f mills located in Kerala • AWES supplied by various manufacturers • centrifugal blowers are used in the AWES in a system supplied by cross roll • Observation • AWES was supplied by cross roll • Primary disc filter and secondary drum filter in sheet metal enclosure is provided • The operating load of main centrifugal fan is 37.7Kw • Proposal Implemented • The existing AWES supplied by cross roll was replaced with energy efficient system • The operating load after replacement is only 15.7Kw • A substantial 58% reduction in energy consumption • Savings achieved • Annual savings Rs.8.5Lakhs • Investment is Rs.16Lakhs • Pay back period 2years TENSOR CONSULTING ENGINEERS (CHENNAI) PVT LTD

  5. CASE STUDY 4 • Present System • A corporate group of mills located in Tamilnadu • Comber noil collection system supplied by BatliBoi • The system had condenses and centrifugal fans • Observation • The operating load of the system was 44.5Kw for 12 combers • Proposal Implemented • The system was replaced with FSC and aerofoil blade centrifugal fans • The operating load reduced to 14.5Kw • Savings achieved • Annual savings Rs.11Lakhs • Investment is Rs.7Lakhs • Pay back period 8 months TENSOR CONSULTING ENGINEERS (CHENNAI) PVT LTD

  6. CASE STUDY 5 • Present System • A corporate group of mills in Tamilnadu without AWES • for blow room • Transport blowers are used along with aero filter and • BatliBoi system for microdust collection in blowroom • Observation • The operating load of the system was 63Kw • Proposal Implemented • AWES in sheet metal enclosure with multidrum filter • installed • The operating load after modification is 20 Kw • Savings achieved • Annual savings Rs.15Lakhs • Investment is Rs.15 Lakhs • Pay back period 12 months TENSOR CONSULTING ENGINEERS (CHENNAI) PVT LTD

  7. CASE STUDY 6 • Present System • Carding AWES supplied by BatliBoi for 16 cards • Operating load is 73Kw • Carding AWES supplied by VXL for 4 cards • Operating load of VXL AWES is 30Kw • Total operating load for both systems is103Kw for 20cards • Proposal Implemented • Provided one AWES in sheet metal enclosure with multidrum filter for 10 cards • Replaced the existing fans with high efficiency fans in BatliBoi AWES and connected to 10 cards • Savings achieved • The operating load after this modification reduced to 60Kw • A whopping 40% reduction in energy consumption • The annual savings Rs.15.5Lakhs • The investment is Rs.22Lakhs • The pay back period is 17Months TENSOR CONSULTING ENGINEERS (CHENNAI) PVT LTD

  8. CASE STUDY 7 • Present System • A leading corporate group of mills having spinning, Weaving & processing units • There are totally 82 humidification plants • All plants provided with conventional spray systems • Observation • The pump rating in conventional spray system is 5hp to 15hp • Pumps are operated for nearly 6000hrs per year • Proposal Implemented • The existing spray system was a replaced with high pressure spray system [‘Fog Master’] • Water sprayed at a pressure of 70bar • The pump installed capacity and operating load reduced by 80% • For example a 15hp pump replaced with 3hp pump • The complete reengineering package was executed and 30% energy savings achieved in all the 82plants • The average pay back period is one and half years TENSOR CONSULTING ENGINEERS (CHENNAI) PVT LTD

  9. CASE STUDY 8 • Present System • A corporate mill located in Kerala • OE Department • 80,000cfm humidification plant supplied by BatliBoi • Plant capacity was inadequate • One more plant of 80,000cfm was to be added • Observation • The airflow delivered by the present fan is around 76,000cfm with an operating load of 24Kw • Proposal Implemented • One more plant of 80,000cfm was added with very highly energy efficient design features • The plant outlet was connected to the existing supply air plenum • The new energy efficient design was able to deliver 80,000cfm with just 8Kw of power • The incremental cost was paid back in two and half years TENSOR CONSULTING ENGINEERS (CHENNAI) PVT LTD

  10. CASE STUDY 9 • Present System • A reputed corporate mill having presence in diversified industries • Unit is located at Madurai • Order was placed for 10,000 spindles spinning project with Batli Boi • Proposal Implemented • High efficiency axial fans were supplied instead of Batli Boi fans • The spray system was modified from conventional to high pressure system. • Ducting was redesigned using static regain techniques • Savings achieved • 40% reduction in the power consumption • The pay back period was one and half years TENSOR CONSULTING ENGINEERS (CHENNAI) PVT LTD

  11. CASE STUDY 10 • Present System • A leading corporate mill • 32,000 spindles new project • Complete rieter machine with auto doffing and Murata link coner • Proposal Implemented • Complete project executed with • Multi drum filters in humidification plants with automatic control • High pressure system in humidification plants • High efficiency axial flow fans • Energy efficient humidification plant design • Ducting design with linear diffuser using static regain method • The energy consumption of humidification plants & AWES compared with their own other units is less by 40% • The incremental cost was paid back in two years • Savings achieved • 40% reduction in the power consumption • The pay back period was one and half years for the incremental cost TENSOR CONSULTING ENGINEERS (CHENNAI) PVT LTD

  12. SUM - UP • Excellent savings potential in AWES and Humidification Plants. • Very attractive payback period of less than one year. • Proven in many reputed mills. • Simple retrofitting from fan replacement to system replacement. • New projects offers potentials as high as 40% savings in energy. TENSOR CONSULTING ENGINEERS (CHENNAI) PVT LTD

  13. THANKING YOU TENSOR CONSULTING ENGINEERS (CHENNAI) PVT LTD