1 / 6

Proposition for a future phase of the project:

Proposition for a future phase of the project:. simulations with others FLUXNET sites:. Sites that can be used. i.e. 31 sites, nearly 100 years of data. ORCHIDEE. EC measurements. Seasonally (JJA) bin-averaged diurnal cycles. R n (W/m 2 ). H (W/m 2 ). LE (W/m 2 ). NEE (µmol/m 2 /mth).

donagh
Télécharger la présentation

Proposition for a future phase of the project:

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Proposition for a future phase of the project: simulations with others FLUXNET sites:

  2. Sites that can be used i.e. 31 sites, nearly 100 years of data

  3. ORCHIDEE EC measurements Seasonally (JJA) bin-averaged diurnal cycles Rn (W/m2) H (W/m2) LE (W/m2) NEE (µmol/m2/mth)

  4. ORCHIDEE EC measurements Bin-averaged seasonal cycles Rn (MJ/m2/mth) H (MJ/m2/mth) LE (MJ/m2/mth) NEE (gC/m2/mth)

  5. Agreement by PFTs

  6. 3/ Necessity to have Soil carbon and biomass 4/ Because of difference of model behavior at the beginning of The run it should be interesting to test models on young stands (e.g Bilos in french « Landes »)

More Related