Airport considerations and airport solutions. Session 5 Presentation 3. Construction plan. Vehicle access requirements  determine standard routes supervision requirement  need for additional airport safety officers Personnel

dorcas
Télécharger la présentation

Airport considerations and airport solutions

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Airport considerations and airport solutions Session 5 Presentation 3

  2. Construction plan • Vehicle • access requirements  determine standard routes • supervision requirement  need for additional airport safety officers • Personnel • supervision requirement  need for additional airport safety officers • safety and security familiarization  implement a training program

  3. Construction plan • Facilities • Taxiways, runways, lighting, signage  determine availability • Communication requirements with ATC • Marking and Signage requirements • FOD  develop a FOD control plan • Runway recall  determine the recall time • Works  develop and distribute NOTAMs

  4. Runway use • Multiple runways • shortened runway considerations: • Determine new effective operational dimensions • Single runway • Airport congestion  review movement numbers and update SOPs as required • Runway and taxiway availability  coordinate and determine • RFF runway access  review and update as required

  5. Traffic Management • Aircraft parking  determine if additional parking is needed • Change in aircraft type  identify additional ground handling requirements • extended airport operating hours  identify the need for additional human resources

  6. Weather • Determine the effect on: • the duration of the works  update NOTAM if required • site access  develop alternative access • condition of materials  provide protection • safety of personnel  develop a contingency plan • fuel stock availability with additional aircraft traffic requirements coordinate with fuel providers

  7. Not common considerations • Emergency response plan  review and revise as required • All changes to normal operations  coordinate and communicateto all airport users • extended airport operating hours  coordinate and promulgate revised hours