An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Report of Working Group II: TRANSPARENCY IN IMPLEMENTATION with regard to selection of beneficiaries, identification of works, preparation of estimates etc

  2. Members of Group II • Mr K S Gopal • Dr Indira Rajaraman • Mr Brajendra Ganesh • Mr Pankaj Hazarika • Mr D Bandyopadhyay (Chairperson) • Mr A P Mukherjee (Member, ARC) • Dr Lekha S Chakraborty (Rapporteur) • Dr H K Amarnath

  3. Question I: Selection Criteria • Interpreting Section III of Act. • Delimiting Household • Rigidly enforce “Kitchen” definition/ Census information. • When more than three adults in a household, SECOND JOB CARD should be provided.

  4. QII: How to ensure no “Elite Capture” • Anybody “entitled”/ volunteering should be provided jobcards. • If Panchayats does not give jobcards, the programme implementation officer must ensure this. • Distribution of Jobcards based on Census listing.

  5. QIII: Procurement of Materials • OPEN TENDER • DISPLAY TENDER NAMES, PRICING, MATERIALS ETC AT “EGAS WEBSITE” (village public display).

  6. Q IV: DATA IN PUBLIC DOMAIN • MUSTER ROLL should be available for anyone to inspect. • Create website at village level and present the details • Record every WEEK, the details in the website. • Tracking the entire process through IT and making the database available to the public.

  7. Q V: Checks and Balances • Strengthen Panchayat system. • Use SHGs in taking up works. • NGOs to be used, only if Panchayat system is not effective. • Corresponding check between Panchayat and NGOs.

  8. Q V: Checks and Balances (contd..) • Each block to have “Citizens’ Monitoring Committee” • involving local Doctors, Teachers, Journalists, Human Rights Activists with Review every three months and facility for inspection and report to the State Councils. • Synergy with RTI • at every step and pro-active information sharing by Govt. agencies.

  9. Q VII: WAGES • Not less than minimum wage: safety Clause to be included. • Wages to be EQUAL across gender and to be ensured by Programme Implementation Officer. • Task should be fair, reasonable and according to the capacity of an average man/woman.

  10. Q VII: WAGES (contd…) • ‘TIME AND MOTION “ study to be the basis for ‘outturn’ schedules. • Engineering Staff College of India study. • Gender specific works study to ensure minimum wages. • Schedule of rates of all Departments to be aligned with NREGI schedule of rates.

  11. Q VII: WAGES (contd…) • Ensure period-specific schedule of rates to determine variations in seasonality. • LEAD to be determined with Panchayat works having local lead. • Gender dimensions of LEADs must be included in deciding the schedule of rates.

  12. Q VIII: Quality of Work • Entrust work to LABOUR BANKS. • Provide advance to Labour Banks to take up work. • No involvement of Contractors. • QUALITY OF LIFE TO WORKERS at worksite should be ensured including crèches, shades and water.