WR-ALC Maintaining the Fleet

Air Force Materiel Command. WR-ALC Maintaining the Fleet. Maj Gen Polly Peyer HQ WR-ALC/CC 26 Aug 2010. Integrity  Service  Excellence. Why Team for the Future?.

dragon
Télécharger la présentation

WR-ALC Maintaining the Fleet

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Air Force Materiel Command WR-ALC Maintaining the Fleet Maj Gen Polly Peyer HQ WR-ALC/CC 26 Aug 2010 Integrity  Service  Excellence

  2. Why Team for the Future? • Due to the rapid pace of technology, the maintenance of an aging fleet requires teaming with other organizations within the Government, Industry and Academia • New technologies are needed to provide additional capabilities and ensure the warfighter has the means to defend against challenges from potential adversaries

  3. Challenges Increased Aircraft Availability • Reduced costs • Enhanced competitiveness • Improved systems / processes • Added core competencies • Added partnerships • Constrained budgets Increased Effectiveness • Increased reliability • Reduced maintenance • Improved safety • Enhanced suitability

  4. Facing the Challenges • High Velocity Maintenance (HVM) • C-5 Avionics Modernization Program (AMP) Systems Integrated Lab Integrated Aircraft Test Environment • Corrosion Program • F-15 Rewire Program • Versatile Depot Automatic Test System (VDATS)

  5. High Velocity Maintenance (HVM) Project Description Why HVM? • An AFMC-wide initiative to dramatically transform production operations in support of increasing aircraft availability, seeking to better emulate industry’s high daily rate of touch-labor maintenance • HVM examines all processes which impact aircraft programmed depot maintenance across the enterprise, including not only product flow, but also funding, requirements, infrastructure, materiel support, and information technology • Pilot Platform: AFSOC C-130 Fleet • Program Manager: Mr. Jerry Mobley • Aircraft Availability • GWOT, Aging Fleets, $ Constraints • Scheduled Maintenance Impacts Aircraft Availability • Inefficient Depot Maintenance Processes • Low velocity compared to Industry • Airline burn rate 500-900 hours/day • ALC PDM 145-220 hours/day • Field and Depot not synchronized • Function as two independent sys • A/C condition not well known 1000 Industry Velocity Stakeholders & Teaming Partners Benefits Velocity (hrs/day) • MAJCOM Customers (AFSOC, AMC, AETC, AFRC, ANG) • AFMC (A4, C-130 SPO, 402 MXW, OC-ALC/HVM, OO-ALC/HVM) • AFGLSC • DLA • Flight Test Squadron • AFRL • Intergraph/AACL (Std Visual Work / PIIs) • Boeing (IETMs) • M1/DERCO (Supply Integrator / Task Kitting) • Robins-Gioia (PDMSS Support) • MERC (Industrial Engineering / Shadow Tools / Simulations) • ICF (Supply Chain Management Services) • Georgia Tech (Transition Planning & CAVE Development) • Simpler (Lean Sensei Support) • Increased Aircraft Availability to the Warfighter • Reduced Depot Possessed Time • Dramatically Increased Burn-Rates (Touch Labor Time) • Synchronized Field Inspection & Depot Maintenance Programs • Mechanic-Centric Focus Yielding Greater Production Efficiency • Advance Condition Knowledge Greatly Improving Accuracy in Supply Forecasting & Lead-Time Availability • Point-of-Use Task Kitting Supporting Mechanics based on Known Requirements • Integrated Planning, Scheduling, Analysis, & Data Collection Processes – Result: Actual Requirements Drive Choreographed Execution of Scheduled Maintenance Tasks 500 USAF Depot Velocity Mx Cycle 0 ISO HSC ISO PDM ISO

  6. Examples of HVM Technology Insertion • Mechanic Centric Focus - Redesigned C-130 maintenance stands • Pre-Planned Work – Task kits • Adherence to Standard Work – Andon system • Aircraft Condition – Pre-induction inspections utilizing borescopes • Automated Access to Tech Orders -Toughbooks for mechanics • Production Control Boards – Touch screen monitors • Fleet Mgt Tool – Eagle Modification Action Plan (EMAP)

  7. C-5 AMP Systems Integrated Lab Integrated Aircraft Test Environment C-5 #840059 crash near Dover AFB on 3 April 2006 402 SMXG participated in post crash recovery efforts C-5 AMP flight deck arrives at Robins on 23 August 2006 Minor construction project addition to Software Support Facility Jan 2010

  8. C-5 AMP Systems Integrated Lab Integrated Aircraft Test Environment (Cont.) Benefitss: • Establishes an organic independent verification and validation capability at WR-ALC • Hardware in the loop aircraft test environment improves fidelity of test • Reduction of in ground and flight testing; therefore increasing aircraft availability • Improves Core compliance and 50/50 • Commercial off the shelf solution

  9. AF Corrosion Prevention and Control Office Lavatory Assessment Project Description Way Forward • Ensure lavatory refurbishment is mandated in all PDM work packages • Recommend immediate action on issues facing C-5, KC-10, and B-52 • Encourage SPOs to actively engage w/field units and hold annual CPABs • Include lessons learned and AFCPCO early in future new acquisition process – KC-X • Assess the overall impact of corrosion caused by aircraft lavatory/crew relief systems • Develop recommendations, and aid AFMC/CC directed lavatory IPT in implementing optimal solutions. Stakeholders & Teaming Partners Benefits • Platforms: B-1, B-2, B-52, C-5, C-17, C-130, E-3, E-8, KC-10, KC-135, RC-135 • Partnership: Industry, ALCs, and DoD Contractors Reduce corrosion damage and repair/replace areas in and around aircraft lavatory/crew relief systems.

  10. Lavatory Corrosion and Solutions B-52 skin repair due to extensive corrosion in lavatory area

  11. Lavatory Corrosion and Solutions (cont) Above and below: Typical cannon plug corrosion under lavatory Above: Condemned toilet - Bad field repair Above: Possible replacement for B-52s: C-130J type Above: Leaking toilet on other A/C set aside to be reinstalled without repair.

  12. F-15 Rewire (Eagle Division) Project Description Status • Replacement of 1970’s-era Kapton wire with new composite • wire in 176 long term F-15C/D aircraft • Estimated cost of program is $683M (engineering, val/ver • kits (3ea), production kits, labor, Wire Integrity Tester (WIT)) • Landing gear, wings, some radar cables not included. • Estimated 5,000 man-hour PDM effort • Program Manager: Mr. Reggie Jenkins (WR-ALC/GRMAB) • Engineer: Mr. Alan Byrd (WR-ALC/GRMEA) • Three ( 3) validation/verification aircraft completed in CY08-09 of 3 distinct aircraft configurations, CV1, CV2, DV1. Aircraft have returned to home stations. • Production installs began Oct 09 (FY10), end in FY15. • TCTO 1F-15-1551 • 7 complete @ WR-ALC, 5 complete @ KAL • 5 in work @ WR-ALC, 6 in work @ KAL • Boeing, St Louis on contract for initial 99 shipsets. • Interconnect/IAI on contract for remaining 74 shipsets. Benefits Stakeholders & Teaming Partners • Eliminates 30-60 down days per year, per aircraft , for wiring related maintenance . • Eliminates funding associated with Depot teams required to replace multiple harnesses/wires as a result of large-scale burns. • Eliminates 143,520 man-hours of wiring related maintenance annually. • Eliminates $44M in Line Replaceable Unit (LRU) exchange fees annually due to false LRU removal. • MAJCOM Customers (ACC, USAFE, PACAF, AFMC, ANG) • DLA (kits) • Boeing (Engineering, kits) • InterConnect, Inc/Israel Aerospace Industries (IAI) (kits) • Korean Airlines (KAL) (PDM installs ) • CK Technologies, Inc. (diagnostic tester)

  13. F-15 Rewire (cont.) Bay 5 Old Wiring Bay 5 New Wiring

  14. F-15 Rewire (cont.) ECS Bay Old Wiring ECS Bay New Wiring

  15. Versatile Depot Automatic Test System (VDATS) • VDATS is the standard family of tester for the Air Force • Currently three different configurations: DA-1, DA-2, and RF-1 • Government owned Supported Platforms VDATS POCs NamePhone # Joe Eckersley – Section Chief 472-0255 Matt Mosely-PM 472-0298 Jonathan Hill-PM 472-0308 Jeff Burrows-ES 472-0301 Larry Adams-Eng 472-0295 Bob Pennington-SIL FLT Chief 468-1307 • WR, OO, OC-ALC • B-2 • F-15 IFF • F-16 IFF • Global Hawk • LAIRCM • MILSTAR • JSTARS • Space Crypto • CARA • AN/APX-119 • Kadena Mini-Depot

  16. VDATS Benefits • Test Program Set standardization • Significant reduction in Automatic Test Equipment (ATE) footprint • 24 scheduled ATE replacements From This… To This! Decreasing footprint, Combating obsolescence, and Reducing cost!

  17. Teaming for the Future Always seeking Opportunities Benefits • Reduced development and operations costs for the Government • Improved technology and capability for Government • Improved responsiveness to the warfighter WR-ALC partnership efforts • Use government sponsored development efforts • Increase maintenance partnerships • Foster performance based logistics solutions

  18. What is in the future? More Joint Efforts Continuous Condition Monitoring • Integrated systems health monitoring • Aircraft subsystem diagnostics • Prognostics based on existing data Maintenance Acceleration/Increased Density • Cost reduction • Crack and corrosion detection and prevention • Reduce coating removal time • Bonded repair technology • Depot and maintenance shop improvement • Supply chain enhancements