1 / 5

WLTP-DTP Subgroup Additional Pollutants Progress report

WLTP-DTP Subgroup Additional Pollutants Progress report. Date: 25. Sept. 2012. Meeting schedule. Validation of AP. NO/NO2  sufficient results expected from VP2 N2O  no f urther validation required NH3  additional validation necessary EtOH  additional validation necessary

dunnp
Télécharger la présentation

WLTP-DTP Subgroup Additional Pollutants Progress report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WLTP-DTP Subgroup Additional PollutantsProgress report Date: 25. Sept. 2012

  2. Meeting schedule

  3. Validation of AP NO/NO2  sufficient results expected from VP2 N2O  no further validation required NH3  additional validation necessary EtOH  additional validation necessary Aldehydes  additional validation necessary

  4. Open issues for NH3 sampling and measurements In Situ extractive Approach to solve Sampling during engine off x xx  request to labs to collect data Lost sample x  theoretical approach Addition of diluent x  diluent according spec for pure gases Calibration x Loss of NH3 in sample system x  best practice/literature Temperature of analyser (FTIR) x  technical discussion Temperature condition x  best practice/literature Temperature and material x  best practice/literature of sampling lines Filter material x  best practice/literature

  5. Validation of measurement of EtOH and Aldehydes Additional measurement campaign necessary • At least two weeks, ca. sept. 2013 (depending on availability of instruments) • JRC will host (to be confirmed) • Instrument manufacturers methods: • AVL • Horiba • Innova (to be verified) • MAHA • Sensors • GC-Method • FTIR • Call for instruments (on CIRCA) • Vehicles: 2 different FFV, 2 Gasoline

More Related