Enhancing TDF Model Results Using Intersection Control Specific Delays and Turning Movement Level Matrix Estimation for a Downtown Circulation Study. Presented to the 11 th Conference on Transportation Planning Applications May 9, 2007 By Gregory Giaimo, Ohio Department of Transportation.

dwaynet
Télécharger la présentation

Presented to the 11 th Conference on Transportation Planning Applications May 9, 2007 By

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Enhancing TDF Model Results Using Intersection Control Specific Delays and Turning Movement Level Matrix Estimation for a Downtown Circulation Study Presented to the 11th Conference on Transportation Planning Applications May 9, 2007 By Gregory Giaimo, Ohio Department of Transportation

  2. Motivation of Presentation • Demonstrate Use of New Techniques to Improve TDF Model Results for Project Analysis • Emphasis on a Careful and Methodical Implementation versus “Push Button”

  3. Two Key Tools • Explicit Intersection Delay Modeling • Turn Movement Level Matrix Estimation

  4. Background on the Mansfield Traffic and Parking Study • Various one way street configurations downtown to be analyzed • Need opening (2012) and design year volumes for the AM and PM peak hours • Consultant has already set up and run a Synchro analysis using the base year counted volumes and the existing operational configuration • Task: to create good forecast turn movement volumes on these alternatives for further Synchro operational analysis to produce a final alternative

  5. Study Flow Chart Turn counts and Synchro files from MPO Compress car/truck, get trip end file and confidence levels Forecast zonal variables from MPO Code alternative networks Check variables, reformat and fix as necessary Assign both periods for all three years (base, opening, design) to all networks Check network & count coding Reassign, correct obvious path problems, reassign Add detailed signal timing and progression Create scenarios in full model for forecast years Run matrix estimation to create final base year demand volumes Take DBF turn volumes to XLS and convert to Synchro CSV format Rerun base year model using revised network Extract sub areas for each period for each forecast year Extract sub area network and trip table for AM and PM periods Calculate Fratar factors by zone to adjust base year demand to future Calculate Fratar targets at sub area cordon Fratar base demand to future

  6. Network Lane Checking • Turn lane configurations in the model were checked vs. Synchro. These were double checked vs. aerial photos and video log. • Errors in network were corrected and full validation model rerun. • Some errors in the Synchro data were found and were sent to the MPO

  7. Check Count Consistency PM Peak Turn Volumes Aggregated to Links • Turn counts were checked for consistency in a spreadsheet • They were also aggregated to link level and plotted on the network • Overall, the turn counts from adjacent intersections were reasonably consistent

  8. Study Flow Chart Turn counts and Synchro files from MPO Compress car/truck, get trip end file and confidence levels Forecast zonal variables from MPO Code alternative networks Check variables, reformat and fix as necessary Assign both periods for all three years (base, opening, design) to all networks Check network & count coding Reassign, correct obvious path problems, reassign Add detailed signal timing and progression Create scenarios in full model for forecast years Run matrix estimation to create final base year demand volumes Take DBF turn volumes to XLS and convert to Synchro CSV format Rerun base year model using revised network Extract sub areas for each period for each forecast year Extract sub area network and trip table for AM and PM periods Calculate Fratar factors by zone to adjust base year demand to future Calculate Fratar targets at sub area cordon Fratar base demand to future

  9. Updating Signal Operations • Updated signal timings and progression based on Synchro files • Moral: assumed default signal operation parameters don’t work with operational level studies Over-ride signal locations Signal phasing editor

  10. Study Flow Chart Turn counts and Synchro files from MPO Compress car/truck, get trip end file and confidence levels Forecast zonal variables from MPO Code alternative networks Check variables, reformat and fix as necessary Assign both periods for all three years (base, opening, design) to all networks Check network & count coding Reassign, correct obvious path problems, reassign Add detailed signal timing and progression Create scenarios in full model for forecast years Run matrix estimation to create final base year demand volumes Take DBF turn volumes to XLS and convert to Synchro CSV format Rerun base year model using revised network Extract sub areas for each period for each forecast year Extract sub area network and trip table for AM and PM periods Calculate Fratar factors by zone to adjust base year demand to future Calculate Fratar targets at sub area cordon Fratar base demand to future

  11. Rerun Base Year Model Save Paths

  12. Study Flow Chart Turn counts and Synchro files from MPO Compress car/truck, get trip end file and confidence levels Forecast zonal variables from MPO Code alternative networks Check variables, reformat and fix as necessary Assign both periods for all three years (base, opening, design) to all networks Check network & count coding Reassign, correct obvious path problems, reassign Add detailed signal timing and progression Create scenarios in full model for forecast years Run matrix estimation to create final base year demand volumes Take DBF turn volumes to XLS and convert to Synchro CSV format Rerun base year model using revised network Extract sub areas for each period for each forecast year Extract sub area network and trip table for AM and PM periods Calculate Fratar factors by zone to adjust base year demand to future Calculate Fratar targets at sub area cordon Fratar base demand to future

  13. Extract Sub Area Net and Trip Table • Not always necessary but helpful in this case

  14. Study Flow Chart Turn counts and Synchro files from MPO Compress car/truck, get trip end file and confidence levels Forecast zonal variables from MPO Code alternative networks Check variables, reformat and fix as necessary Assign both periods for all three years (base, opening, design) to all networks Check network & count coding Reassign, correct obvious path problems, reassign Add detailed signal timing and progression Create scenarios in full model for forecast years Run matrix estimation to create final base year demand volumes Take DBF turn volumes to XLS and convert to Synchro CSV format Rerun base year model using revised network Extract sub areas for each period for each forecast year Extract sub area network and trip table for AM and PM periods Calculate Fratar factors by zone to adjust base year demand to future Calculate Fratar targets at sub area cordon Fratar base demand to future

  15. Fratar Cordon Volumes • 24 Hour Link car/truck counts at cordon converted to period level directional values using full model assignment • Original sub area trip table Fratared

  16. Study Flow Chart Turn counts and Synchro files from MPO Compress car/truck, get trip end file and confidence levels Forecast zonal variables from MPO Code alternative networks Check variables, reformat and fix as necessary Assign both periods for all three years (base, opening, design) to all networks Reassign, correct obvious path problems, reassign Check network & count coding Add detailed signal timing and progression Create scenarios in full model for forecast years Run matrix estimation to create final base year demand volumes Take DBF turn volumes to XLS and convert to Synchro CSV format Rerun base year model using revised network Extract sub areas for each period for each forecast year Extract sub area network and trip table for AM and PM periods Calculate Fratar factors by zone to adjust base year demand to future Calculate Fratar targets at sub area cordon Fratar base demand to future

  17. Check for Routing Problems • Fratared trip tables assigned and assignments checked for path problems • Some small speed adjustments corrected most problems • Due to odd routing of SR 13 through CBD, SR 13 through trips were placed in their own volume group to force them on the SR 13 signed route (because a much shorter path down Main Street exists but counts indicate the through traffic largely remains on the signed route)

  18. Study Flow Chart Turn counts and Synchro files from MPO Compress car/truck, get trip end file and confidence levels Forecast zonal variables from MPO Code alternative networks Check variables, reformat and fix as necessary Assign both periods for all three years (base, opening, design) to all networks Check network & count coding Reassign, correct obvious path problems, reassign Add detailed signal timing and progression Create scenarios in full model for forecast years Run matrix estimation to create final base year demand volumes Take DBF turn volumes to XLS and convert to Synchro CSV format Rerun base year model using revised network Extract sub areas for each period for each forecast year Extract sub area network and trip table for AM and PM periods Calculate Fratar factors by zone to adjust base year demand to future Calculate Fratar targets at sub area cordon Fratar base demand to future

  19. Prepare Inputs for Matrix Estimation • Car/Truck are compressed, turning movement counts were by class but truck volume was too low to bother with independently • Extract trip ends • Add confidence levels to data: • Trip table cell 1 • Internal trip end 10 • External trip end 50 • Older turn count 50 • New turn count 75

  20. Run Matrix Estimation • Can accept various data items such as: • Link or turn counts • Trip ends • Seed trip table • Etc. • All inputs require confidence levels • Relative values • Order of magnitude difference needed to see much impact • Adjusts the trip matrix to fit the various weighted (through confidence levels) observed data with minimum error

  21. Run Matrix Estimation (cont.) 2 Matrices required, trips and confidence level Need a path file from a previous assignment ASCII, zone, origins, destinations, O confidence, D confidence The information contained in the print file is extremely important and should be well understood by anyone wishing to use matrix estimation properly ASCII, screen number, from-through-to nodes, count, confidence level

  22. Run Matrix Estimation Print File This shows that convergence occurred and the number of iterations. This shows input matrix characteristics, the warning messages show counts that had no trips assigned in the prior assignment. This is important, a link or turn with no assignment before won’t get any in matrix estimation either. This shows how good each zones trip ends match. Here’s information on average confidence levels and amounts of data, very important for helping set confidence levels. This shows how well each count was matched, notice that the counts match better than trip ends due to higher confidence.

  23. Study Flow Chart Turn counts and Synchro files from MPO Compress car/truck, get trip end file and confidence levels Forecast zonal variables from MPO Code alternative networks Check variables, reformat and fix as necessary Assign both periods for all three years (base, opening, design) to all networks Check network & count coding Reassign, correct obvious path problems, reassign Add detailed signal timing and progression Create scenarios in full model for forecast years Run matrix estimation to create final base year demand volumes Take DBF turn volumes to XLS and convert to Synchro CSV format Rerun base year model using revised network Extract sub areas for each period for each forecast year Extract sub area network and trip table for AM and PM periods Calculate Fratar factors by zone to adjust base year demand to future Calculate Fratar targets at sub area cordon Fratar base demand to future

  24. Check Forecast Variables • Variables checked in spreadsheet and through plots • Noticed large discrepancy between 2000 and 2005 due to changes in assumptions

  25. Check Forecast Variables (cont.) • In contrast the 2005 and 2030 variables are consistent and show growth in reasonable areas • Since the forecast variables aren’t “official” it was decided to use these to derive growth factors for the base year

  26. Study Flow Chart Turn counts and Synchro files from MPO Compress car/truck, get trip end file and confidence levels Forecast zonal variables from MPO Code alternative networks Check variables, reformat and fix as necessary Assign both periods for all three years (base, opening, design) to all networks Check network & count coding Reassign, correct obvious path problems, reassign Add detailed signal timing and progression Create scenarios in full model for forecast years Run matrix estimation to create final base year demand volumes Take DBF turn volumes to XLS and convert to Synchro CSV format Rerun base year model using revised network Extract sub areas for each period for each forecast year Extract sub area network and trip table for AM and PM periods Calculate Fratar factors by zone to adjust base year demand to future Calculate Fratar targets at sub area cordon Fratar base demand to future

  27. Run Forecast Year Model New Scenarios added for forecast land use Base Year Model with Forecast Variables

  28. Study Flow Chart Turn counts and Synchro files from MPO Compress car/truck, get trip end file and confidence levels Forecast zonal variables from MPO Code alternative networks Check variables, reformat and fix as necessary Assign both periods for all three years (base, opening, design) to all networks Check network & count coding Reassign, correct obvious path problems, reassign Add detailed signal timing and progression Create scenarios in full model for forecast years Run matrix estimation to create final base year demand volumes Take DBF turn volumes to XLS and convert to Synchro CSV format Rerun base year model using revised network Extract sub areas for each period for each forecast year Extract sub area network and trip table for AM and PM periods Calculate Fratar factors by zone to adjust base year demand to future Calculate Fratar targets at sub area cordon Fratar base demand to future

  29. Fratar to Forecast Year • Trip ends extracted from forecast year trip tables • Fratar factors (not targets) calculated in spreadsheet • Separate Origin and Destination factors (excerpt below is from the Origin factor computation)

  30. Study Flow Chart Code alternative networks Turn counts and Synchro files from MPO Compress car/truck, get trip end file and confidence levels Forecast zonal variables from MPO Check variables, reformat and fix as necessary Assign both periods for all three years (base, opening, design) to all networks Check network & count coding Reassign, correct obvious path problems, reassign Add detailed signal timing and progression Create scenarios in full model for forecast years Run matrix estimation to create final base year demand volumes Take DBF turn volumes to XLS and convert to Synchro CSV format Rerun base year model using revised network Extract sub areas for each period for each forecast year Extract sub area network and trip table for AM and PM periods Calculate Fratar factors by zone to adjust base year demand to future Calculate Fratar targets at sub area cordon Fratar base demand to future

  31. Code Alternative Networks • Four alternatives • Alt. 1: Two way operation on Main and Diamond • Alt. 2: Two way operation on Main and Walnut • Alt. 3: Two way operation on Diamond, Main, Mulberry and Walnut • Alt. 4: As Alt. 3 plus two way operation on First and Second • In addition to adding two way operation, lane configurations and signal operations updated appropriately

  32. Code Alternative Networks (cont.) Alternative 1 Nobuild (Existing) TURNLANE annotated, LANES colored

  33. Code Alternative Networks (cont.) Alternative 3 Alternative 2 TURNLANE annotated, LANES colored

  34. Code Alternative Networks (cont.) Alternative 4 TURNLANE annotated, LANES colored

  35. Study Flow Chart Turn counts and Synchro files from MPO Compress car/truck, get trip end file and confidence levels Forecast zonal variables from MPO Code alternative networks Assign both periods for all three years (base, opening, design) to all networks Check variables, reformat and fix as necessary Check network & count coding Reassign, correct obvious path problems, reassign Add detailed signal timing and progression Create scenarios in full model for forecast years Run matrix estimation to create final base year demand volumes Take DBF turn volumes to XLS and convert to Synchro CSV format Rerun base year model using revised network Extract sub areas for each period for each forecast year Extract sub area network and trip table for AM and PM periods Calculate Fratar factors by zone to adjust base year demand to future Calculate Fratar targets at sub area cordon Fratar base demand to future

  36. Assign & Export to Synchro • Save Turn Volumes to DBF • Lookup tables of Synchro direction codes and intersection ID’s required in spreadsheet to convert Cube From-Thru-To node • A pivot table in spreadsheet then easily converts turn movements to the tabular format required by Synchro

  37. Impact of Adjustments on Volume

  38. Impact of Adjustments on Volume (cont.)

  39. Turn Volumes From Several Methods • The obvious question: After all this effort what is the impact on the final results? • Different turning movement volumes are obtained using the adjusted sub-area model vs. simply coding the network changes/variables into the original model as shown below • What impact do these differences have?

  40. 2000 Alternative 1, PM Peak Assignment, Intersection of Diamond & Park Ave West Validated Regional Model Adjusted Sub-area Model 236 Left 859 Through 353 Right 263 Left 389 Through 378 Right

  41. Turn Volumes From Several Methods (cont.) • As expected the adjusted model matches counts better • While the standard link based %RMSE of this model is 33%, the CBD turning movements have a substantially higher value of 73% for the validation year model

  42. Turn Volumes From Several Methods (cont.) • The regional model using junction based assignment performs marginally better than the regional model using equilibrium when compared to counts

  43. Turn Volumes From Several Methods (cont.) • However, more importantly, the sensitivity of traffic to the coded alternative is much closer to that obtained with the adjusted model

  44. Turn Volumes From Several Methods (cont.) • Changes resulting from the forecast year are much smaller than the model error (without adjustments) due to the low growth in the area

  45. Turn Volumes From Several Methods (cont.) • Changes resulting from the alternative are similar magnitude to the model error without adjustment • Thus, the adjustment process and junction modeling is most likely needed to reasonably predict turning movement level outputs in an area highly regulated by traffic control devices such as the CBD

  46. Comparison of Model LOS How do these volume differences impact the decision making process? Different Volumes, Same Methods (Year 2000 No Build Shown) Original Model Final Sub Area Model

  47. Questions Please Use Microphone