1 / 86

Lean Manufacturing

Kohler Operating System. Lean Manufacturing. Lean Manufacturing Customer Order Driven (Pulled) One-piece Processing Near-Zero, Idle Inventory Quality Problems are Surfaced. Traditional Manufacturing Planned and Scheduled (Pushed) Batch Processing Extensive Idle Inventory

dwingate
Télécharger la présentation

Lean Manufacturing

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Kohler Operating System Lean Manufacturing

  2. LeanManufacturing Customer Order Driven (Pulled) One-piece Processing Near-Zero, Idle Inventory Quality Problems are Surfaced Traditional Manufacturing Planned and Scheduled (Pushed) Batch Processing Extensive Idle Inventory Quality Problems are Hidden vs

  3. TIME PRE R&D A/R MFG DIST PLAN PRE R&D A/R MFG DIST PLAN Time — Source of Competitiveness

  4. Lead Time Definition The amount of time it takes to convert raw material into finished goods and ship them to the customer. The elimination of waste will reduce lead-time which has a favorable affect on safety, quality, delivery, cost and productivity.

  5. Order Problems/Waste Excess Inventory Problems/Waste Problems/Waste Long Lead Time Excess Inventory Delivery Lead Time Is Affected by Flow

  6. TIME Raw Material Finished Goods = Value Added (VA) Time = Non-Value Added (NVA) Time Product Lead Time

  7. Reducing Waste Improves Flow

  8. Extra Inventory Extra Defects WASTE OF OVERPRODUCTION Extra Space Extra Handling Extra Machinery Extra Paperwork Extra Overhead

  9. Sea of Inventory Line Long Lack of Balance Communication Transportation Housekeeping Problems Poor Scheduling Long Setup Quality Time Supplier Absenteeism Problems Machine Delivery Breakdown Excess Inventory Hides Problems

  10. Reducing Excess Inventory . . . . . . . . Exposes Problems Raw Material Finished Product to Customer Sea of Inventory Line Long Lack of Communication Balance Transportation Housekeeping Problems Poor Scheduling Long Setup Quality Time Supplier Absenteeism Problems Machine Delivery Breakdown

  11. KOHLER Just-in-Time (JIT) Mfg. Producing just what is needed, when it is needed, in the amount needed, with only the minimum required materials, equipment, labor, and space.

  12. “Push” vs. “Pull” Material Flow Using an MRP system or other mechanism, work is scheduled and pushed through each stage in the production process in order to meet specified delivery dates for finished products. Push Work at each stage in the production process is pulled through the system by actual demand for final products. Pull THINK:“Bucket Brigade…”

  13. JIT Production? Pull Systems? Kanban? … How does it all relate? • “Kanban” • Means “card” in Japanese • It is a “pull” production system and used as the means of production control in JIT • How kanbans work: • When an order to produce a finished product is issued to the plant, workers withdraw components from a “standard container” and build the product. • Each container has a kanban on it, which is sent to the upstream as an authorization to produce. • This in turn activates kanbans at that operation, sent to the next operation upstream, and so on. The process goes all the way to kanbans issued to the vendor to produce and/or ship. • Computer control is unnecessary:

  14. Seeing JIT/Kanban at Work

  15. Seeing JIT/Kanban at Work

  16. Seeing JIT/Kanban at Work Flow

  17. Seeing JIT/Kanban at Work

  18. Seeing JIT/Kanban at Work Work Center 1

  19. Seeing JIT/Kanban at Work Work Center 1 Work Center 2

  20. Seeing JIT/Kanban at Work Work Center 1 Work Center 2 Work Center 3

  21. Seeing JIT/Kanban at Work Container to be worked on

  22. Seeing JIT/Kanban at Work Flag or signal marker

  23. Seeing JIT/Kanban at Work Start Simulation(Any Questions?)

  24. Seeing JIT/Kanban at Work

  25. Seeing JIT/Kanban at Work

  26. Seeing JIT/Kanban at Work

  27. Seeing JIT/Kanban at Work

  28. Seeing JIT/Kanban at Work

  29. Seeing JIT/Kanban at Work

  30. Seeing JIT/Kanban at Work Puts flag on post

  31. Seeing JIT/Kanban at Work Puts flag on post

  32. Seeing JIT/Kanban at Work

  33. Seeing JIT/Kanban at Work Setup

  34. Seeing JIT/Kanban at Work Run

  35. Seeing JIT/Kanban at Work

  36. Seeing JIT/Kanban at Work Run

  37. Seeing JIT/Kanban at Work

  38. Seeing JIT/Kanban at Work

  39. Seeing JIT/Kanban at Work

  40. Seeing JIT/Kanban at Work

  41. Seeing JIT/Kanban at Work

  42. Seeing JIT/Kanban at Work

  43. Seeing JIT/Kanban at Work

  44. Seeing JIT/Kanban at Work

  45. Seeing JIT/Kanban at Work

  46. Seeing JIT/Kanban at Work What happens next?

  47. Seeing JIT/Kanban at Work

  48. Seeing JIT/Kanban at Work

  49. Seeing JIT/Kanban at Work

  50. Seeing JIT/Kanban at Work

More Related