U.S. 421 Bridge DES# 1006286 Thursday, July 17, 2014 5:30 p.m. Frankfort Community Public Library

U.S. 421 Bridge DES# 1006286 Thursday, July 17, 2014 5:30 p.m. Frankfort Community Public Library 208 West Clinton Street, Frankfort, IN. Agenda. Welcome & Introductions Formal Public Hearing Presentations Public Statements for the Record Adjourn Formal Hearing

dysis
Télécharger la présentation

U.S. 421 Bridge DES# 1006286 Thursday, July 17, 2014 5:30 p.m. Frankfort Community Public Library

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. U.S. 421 Bridge DES# 1006286 Thursday, July 17, 2014 5:30 p.m. Frankfort Community Public Library 208 West Clinton Street, Frankfort, IN

  2. Agenda • Welcome & Introductions • Formal Public Hearing • Presentations • Public Statements for the Record • Adjourn Formal Hearing • Invited to the display area for Q & A with the project team

  3. Public Hearing • Conducted as a requirement to the National Environmental Policy Act (NEPA) • Requires evaluation of potential impacts to surrounding natural, cultural, and social environments • Impacts are described in the environmental document • Requires opportunity for the public to be involved and comment in the decision making process of said impacts

  4. Environmental Document • Level 4 Categorical Exclusion classification means the actions do not have a significant effect on the environment. • Released for public involvement on June 18, 2014 • Document available for viewing • Published legal notice • Frankfort Times • July 1 & July 8, 2014

  5. Options to Participate • Verbally as a Public Statement • Statements are recorded • Comment form • Submit via mail or at sign-in table • Email • rclark@indot.in.gov • Comment period ends • Thursday, July 31, 2014 Please feel free to use any and all methods.

  6. How Comments are Addressed • All comments will be addressed in the final environmental document as a result of: • The public statements recorded at public hearing • Written statements • Informal comments are always welcome, however, please note general conversations are not part of the official record.

  7. Environmental Document • INDOT Public Involvement, Room N642Indiana Government Center North100 North Senate Avenue, Indianapolis, IN 46204-2216Phone: (317) 232-6601 • INDOT Crawfordsville District Office41 West 300 North Crawfordsville, IN 47933 Phone: (888) 924-6368 • Frankfort Community Public Library 208 West Clinton StreetFrankfort, IN 46041 Phone: (765) 659-4622

  8. Environmental Studies Elements of environmental documents: • Right of way • Hazardous materials • Threatened & endangered species • Historic & archaeological • Community impacts • Floodplains • Land use • Wetlands & waterways • Noise • Air quality • Public involvement

  9. Environmental Impacts • No right of way required • Section 106 • Historic Bridge

  10. Purpose and Need • Purpose: Maintain U.S. 421 connection over Kilmore Creek. • Need: Supported by the deteriorated condition of the bridge superstructure and substructure. • Recent bridge inspection July 2013 received a rating of “poor”.

  11. Alternatives • Do nothing • Preferred alternative • Rehabilitation for continued vehicular use • Repaired in accordance with the Secretary of Interior’s Standards for Rehabilitation

  12. Bridge over Kilmore Creek • Bridge is historic • Constructed in 1941 according to Indiana State Highway Commission standardized plan • Eligible for listing in the National Register of Historic Places under Criterion C for engineering significance

  13. Bridge Inventory • Results of Historic Bridge Inventory • U.S. 421 Bridge is Select • Select means: • Suitable candidate for preservation • Considered excellent example • MUST be preserved when using FHWA funding

  14. Rehabilitation • Rehabilitation project highlights • Repair, protect & preserve the integrity and qualities of the “Select” bridge while providing a safe structure • In-kind replacements • Some rivets replaced with high-strength bolts • New railing • Cleaning & painting

  15. Project Development • Historic bridge project development process • Seek consulting party comment • No objection to date • Identify preferred alternative • Repair/rehabilitation • Hold public hearing • Comment period ends July 31, 2014 • Environmental document approval • After hearing comment period ends

  16. U.S. 421 Bridge • Removal and reconstruction of portions of the substructure • Removal of the existing bridge deck • Reconstruction of portions of the steel truss

  17. U.S. 421 Bridge • Components replaced • Concrete deck, including curb and expansion joints • Stringer, diagonal, knee brace member and some lattice bars • Mudwall and portions of end bent numbers 1 & 2, including bridge seat and portion of abutment walls • Top portion of curved wing walls • Concrete approaches and guardrail • Bridge will be cleaned and painted green

  18. Utilities Utility work will done prior to construction.

  19. Maintenance of Traffic • Proposed • U.S 421 Road Closure • Detour on state routes • State Road 75 and State Road 26 • Most economical option • Shortest construction time • Safest

  20. Project Schedule • Public hearing – July 17, 2014 • Completion of the environmental document – August 2014 • Completion of the design phase – September 2014 • One year construction schedule is anticipated to begin in spring 2015.

  21. Public Comments • For written submissions: • Rickie Clark INDOT Public Hearings N642 100 North Senate Ave Indianapolis, IN 46204rclark@indot.in.gov • Respectfully request comments to be postmarked by July 31, 2014. • All comments will be reviewed and evaluated and given full consideration before final design decisions.

  22. Public Comments • Speakers from sign-in sheet • Public statements will be recorded. • Please be courteous and mindful of appropriate language. • Open to the floor for additional public statements for the record.