An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. August 7, 2013 | NEPOOL markets committee Erin H. O’Brien Senior Tariff analyst | market development FCM Efforts and Manual 20 Clean-up Conforming Manual Changes

  2. Background FCM Efforts and Manual 20 Clean-up

  3. Conforming Manual Changes – Background • Bring Manuals 20 and MVDR in line with previous FCM efforts: • Static De-list Bid Changes • After the qualification determination notifications are issued, the ISO will open a seven-day window to allow Market Participants to modify Static De-list Bids. • FCM Redesign Changes • Offer floor mitigation • Elimination of floor price • Revised mitigation rules • Dynamic De-list Bid threshold • Elimination of Pivotal Supplier and Quantity Rule • Elimination of “Cost of New Entry” (CONE)

  4. Conforming Manual Changes – Background(continued) • Manual 20 clean-up • Update use of defined terms consistent with Section I.2.2. • Address expiration of Master FCM Schedule included in M-20, Section I • General clean-up • Incorporate or correct hyperlinks • Update or remove outdated practices • Make non-substantive grammatical edits

  5. Examples of Manual Changes • Static De-List Bid Changes for Manual 20 • Add submission window to FCM Master Schedule • Include cross references to MR1, Section III.13.1.2.3.2.1.1.2 where appropriate • FCM Redesign Changes – Offer Floor Mitigation • Replace references of “.75 times CONE” to state “the relevant Offer Review Trigger Price” • Update Section 13 references to point to Appendix A provisions • FCM Redesign Changes – Elimination of Floor Price • Delete provisions related to the floor price

  6. Examples of Manual Changes (continued) • FCM Redesign Changes – Revised Mitigation Rules • Update the Dynamic De-List Bid threshold from “.8 times CONE” to “$1.00 kW/month” • FCM Redesign Changes – Elimination of CONE • Replace references of “2*CONE” to state “the Forward Capacity Auction Starting Price” • Manual clean-up • Delete expiring dates in FCM Master Schedule and update with FCTS references • Update former GADsnXL references to PowerGADs with associated software hyperlink • Update defined term use by lower casing terms or applying the correct defined term

  7. Static De-list Bid – Past Committee Review

  8. FCM Redesign – Past Committee Review