This document provides a comprehensive cost estimate for infrastructure development Phase II, highlighting three alternatives. Alternate A has an estimated cost of $1,898,106.78, including heated walkways, pedestrian bridges, and retaining walls. Alternate B costs $2,302,739.71, offering expanded features. Additionally, estimates for pod and bandstand designs are outlined, amounting to $635,168.70 and $411,017.55, respectively. Key components of each alternative, such as permitting, landscaping, and utilities, are noted alongside what is not included in the estimates.

efrat
Télécharger la présentation

Costs Breakdown for Phase II Infrastructure Development

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Group Members: Gilliland, John Goodell, Christopher Jemison, Jennifer Longden, Katherine Oliveira, Nickolas Cost Estimating Phase II

  2. Alternative AEstimated at $1,898,106.78 Included in Estimate: Not Included in Estimate: • 11,048 S.F. of Heated Walkways • 2 Pedestrian Bridges • 2762 L.F. of 24” retaining wall • 4 tons of Class 2A Fill & Back Fill • 1390 L.F. of Railings • Pods • Band Stand • Permitting • Landscaping • Utilities & Trenching • Storm water

  3. Alternative BEstimated at $2,302,739.71 Included in Estimate: Not Included in Estimate: • 15,200 S.F. of Heated Walkways • 1 Pedestrian Bridge • 3750 L.F. of 24” retaining wall • 1914 tons of Class 2A Fill & Back Fill • 1875 L.F. of Railings • Pods • Band Stand • Permitting • Landscaping • Utilities & Trenching • Storm water

  4. Pod DesignEstimated at $635,168.70 Included in Estimate: Not Included in Estimate: • 7,800 S.F. of Heated Walkways • 390 L.F. of 24” retaining wall • 390 L.F. of 36” retaining wall • 390 L.F. of Railings • 26 Park Benches (2 & 3 seat) • Permitting • Landscaping • Utilities & Trenching • Storm water

  5. Band Stand DesignEstimated at: $411,017.55 Included in Estimate: Not Included in Estimate: • 1 Structure • 20 L.F. of Mechanical Compaction • 20 L.F. of Grading the Existing Surface • Seeding • Permitting • Landscaping • Utilities & Trenching • Storm water

  6. Environmental & Permitting To Be Determined

  7. Questions