An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RPC project status report RPC IB meeting 28 June 2011 Pigi Paolucci

  2. Outline • CMS and RPC news • Organization chart • Manpower issues • Upgrade structure • 2011 ESP RPC IB meeting - Pigi Paolucci

  3. CMS reached the fb-1

  4. LHC plans

  5. No any significant RPC downtime & dead time during the last 3 months Trigger L1-RPC : 0:04:02min/ 535 hours A closer look to that 0% !....

  6. Full Barrel Endcap Trigger history plot Beam Halo Mu 10 RPC IB meeting - Pigi Paolucci

  7. Run 2011 RPC shift The present table contains the requested shift per institution. The shift are calculated considering 48 weeks of runs and 3 shifter per week (DOC, DM and CAF) plus 15% of contingency. The request is to provide 2 shift(weeks)/EPS See Gabriella talks

  8. Editorial board S. Qian, M. Abbrescia S. Bianco Conference Committee S. Park, B. Pavlov Institution Board L. Litov Steering committee W. Van Doninck, M. Maggi H. Hoorani, A. Colaleo, A. Sharma (PM+DPM+RC+TC+DPG) Project Manager P. Paolucci M. Tytgat & G. Pugliese Resource manager A. Colaleo DPG D. Piccolo K. Bunkowski C. Carillo Tech. Coordination S. Buontempo A. Dimitrov Run Coordinator L. Benussi H. Shahzad N. Zaganidis Upgrade G. Iaselli Sharma S. Buontempo RPC IB meeting - Pigi Paolucci

  9. Upgrade G. Iaselli A. Sharma S. Buontempo Technical Coordination S. Buontempo A. Dimitrov High eta Bakelite HPL Mainten. & repair. (RE,RE) Dimitrov & Shahzad Electronics F. Loddo Chamber instal. Gap production DCS hardware Resp. Cable instal. Power system Chamber mechanics Test beam Nicolas Cooling J. Crotty Off-detector electronic Chamber design Documentation Dimitrov Gas Benussi Power cable GIF activity Ghent site M. Tytgat R&D N. Zaganidis India site L. Pant Chamber production Signal cable Equipment DB D. Uzunova Trigger Warsaw CERN site CERN CERN test stand CERN RE1/1 at P5 Commissioning at P5 Chamber QC at CERN Run coordination & Upgrade Covered RPC IB meeting - Pigi Paolucci Manpower needed Not covered

  10. Critical task (March 2011) • We still have few important tasks not covered: • Online Database (Warsaw is looking for a student) • Detector Control System (none) • Power system (temporary solution) • Offline Database (Bari group) • WMB (none from July 2011) RPC IB meeting - Pigi Paolucci

  11. Critical tasks (Today) • 2 tasks have been now covered: • Online Database (Warsaw is looking for a student) • Detector Control System • Electronic Coordinator (F. Loddo)  • Power system (Hassan and Anton)  • Offline Database (Korea Univ & Bari group)  • Time needed to have experts • WMB (covered until October 2011) • Mihee will work with Umberto on noise in WMB RPC IB meeting - Pigi Paolucci

  12. Next issues (March 2011 and now) • WBM deployment at CAF/P5 !!! manpower needed • Working at CAF/P5 very well  OK • Historical plots and noise have to be included • DQM efficiencies and DB • Under test • Noise and DB • Geometry and noise per roll ready • Noise per strip asap • CMS center instructions for shifters OK  • Upgrade schedule and milestones – under definition • Upgrade money matrix - still under discussion in CMS PVT RPC IB meeting - Pigi Paolucci

  13. 2011 manpower • Cimmino 2 months Feb RC/DPG • Mircho 3 months May RC/DPG • Umberto 3+3 months (RPC & CERN) June RC/DPG • 1+1 month (CERN + RPC) Sept • Alaa 3+3 months (RPC & Egypt) Aug DPG • Uzunova 5 months (RPC & upgrade) July TC/Up • 2 months from CMS TC • 2 months from RPC upgrade Dec • Anton 12 months Dec TC RPC IB meeting - Pigi Paolucci

  14. 2011-2012 manpower news • We have two very critical position to assure for the next two year: • Detector expert & Trigger and DAQ expert • positions are now covered in the best way by • Anton and Karol • Karol fellow has been extended to Dec 2011 • Project associate for the 2012 • Anton contract finish in June 2011 • Project associate for the 2012 RPC IB meeting - Pigi Paolucci

  15. News about RPC organization 4th RPC General Meeting - Pigi Paolucci RPC MB, coordinators and experts have access to a shared google documents used to prepare the weekly report to the XEB meeting: Very good way to share info ! Please ask to have access June 14th:TC:Everything was perfectly stable before the gas kill on 31th May. Then after a power-cut in SG5 and a gas kill we had 5 trips in the barrel and 1 in the endcap.All have been recovered. One chamber temporarily in SG mode till next access.Trigger: Muon Trigger rate variations observed (~9%) in last weeks, the most probable reason is variation of the RPC chamber efficiency (by 2-3%) with the pressure variation (impacting the trigger efficiency in the endcaps by 3-4%, and thus the rate). Still not clear is the variation of the cluster size could impact the probability of promoting the low pt muons to high pt (impacting the rate on given threshold). Variation is not present with low PT cut (Mu0 and Mu7) and increase from Mu16 to Mu20RC: stable since the HV scan - no problem with the new set of WP and efficiency very stable in time (2-3% of variation due to the pressure) P/T correction in PVSS has been discussed and defined and will be tested during the next TSDPG:DQM: experts are investigating in the offline DQM to speed-up it. Right now we are using 4MB and we already deleted 4.000 histograms. Work is on going. MC: Comparison of number of RPC hits in MuonReco of 2011 data with summer2011 MC, show nice agreement in barrel and endcap. Some small discrepancy in overlap region under studyUpgrade: MB:

  16. News about RPC organization 4th RPC General Meeting - Pigi Paolucci • Shared google calendar with meetings and vacation (Pigi and Gabriella) • please ask to be included in the list • Minutes provided by all the coordinators – thanks a lot • XEB and XEC minutes circulates in real time • MB and FB minutes and news in a week • All info sent to Group Leader (we ask to circulate)

  17. Action Items 4th RPC General Meeting - Pigi Paolucci HV setting with P/T correction – approved by CMS but in a human version Improve history plots monitoring (current, noise, efficiency) using WBM and database Include DQM trigger check in CAF duties Spare components procurement Long 2012shut-down plan Bakelite and gap production Link and Control board prototype tests at 904 (Oct-Dec)

  18. ESP 2011 • ESP 2011 have been approved by RPC and CMS • Most of the RPC pledges have been approved after having consulted TC/RC/DPG/Upgrade • Some DPG task to be checked: • PVT 6 needed 13.6 pledge • Analysis 36 56 • Up soft 4 0 • Gap prod 8 16 • End of the year RPC MB will fill the work done with the help of the coordinators • Few tasks without any results. To be double checked RPC IB meeting - Pigi Paolucci

  19. RPC IB meeting - Pigi Paolucci

  20. ESP status (June 2011) RPC IB meeting - Pigi Paolucci

  21. 2011 ESP status (country & institution) RPC IB meeting - Pigi Paolucci

  22. EPS hot task RPC IB meeting - Pigi Paolucci

  23. Conclusion • Project is in good shape and many improvements have been done during the 2010-2011 shut-down • ESP pledge letters deadline is in 2 weeks. • Manpower: DCS – WBM – Online experts – detector expert • 2010 expenditure were in line with our budget 269 KCHF • 2011-2012: we have to cover 2 critical tasks • 2011 budget is necessary – contribution request in few days RPC IB meeting - Pigi Paolucci