1 / 82

Reporting & Recordkeeping Requirements § 63.1515 – 63.1517

Reporting & Recordkeeping Requirements § 63.1515 – 63.1517. Reporting and Recordkeeping Requirements. § 63.1515 – Notification requirements § 63.1516 – Reporting requirements § 63.1517 – Recordkeeping requirements. Notification Requirements. § 63.1515. Notification Requirements.

elan
Télécharger la présentation

Reporting & Recordkeeping Requirements § 63.1515 – 63.1517

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Reporting & Recordkeeping Requirements §63.1515 – 63.1517

  2. Reporting and Recordkeeping Requirements • §63.1515 – Notification requirements • §63.1516 – Reporting requirements • §63.1517 – Recordkeeping requirements

  3. Notification Requirements §63.1515

  4. Notification Requirements • Initial Notification - §63.1515(a) • 1515 Notification of compliance status - §63. (b) Required Notices

  5. Initial Notification Requirements • Must submit if: • Area source becomes a major source • New or reconstructed affected or major affected sources • Intends to construct or reconstruct affected source

  6. Must submit by: • 120 days after effective date ( if startup date precedes effective date), or • Within 120 days of becoming subject to rule

  7. Information that goes in initial notification per 63.9(b)(2) • Identity of relevant standard • Owner/operator

  8. Physical address of source • Nature, size, design, method of operation, capacity • Major or area

  9. In addition to initial notification, • Notice of special compliance obligations (see 63.6(b)(3),(4))

  10. Notice of performance tests and VE tests • Additional notice requirements for sources using CMS

  11. Notification of performance tests and VE tests • Performance test notice – 60 days prior to test • Opacity or VE test notice – 30 days prior to test

  12. Additional information required in notices for sources using CMS • Requirements defined in 63.9(g), e.g., date of CMS performance evaluation

  13. Notification of Compliance Status • General requirements: • Required of each owner and operator • Within 60 days of compliance dates in §63.1501

  14. General Requirements Cont’d.: • Signed and accuracy certified by responsible official • May be submitted in following manner: • In operating permit application

  15. May be submitted in following manner Cont’d.: • In amendment to operating permit application • Separate submittal • Combination of above

  16. Notification of Compliance Status • All information required by 63.9, e.g., • Method of determining compliance • Test results Required Information

  17. Required Information Cont’d. • Methods to determine continuous compliance • Statement as to compliance

  18. Approved site-specific test plan and CMS performance evaluation results • Unit labeling per §63.1506(b) Required Information - continued

  19. Required Information - continued • Operating parameter value (range) for each affected source or emission unit • Include supporting documentation • Procedure use to establish value (lime, injection rate, flux rate, etc.)

  20. Required Information - continued • Capture/collection equipment design information • Conformance with bag leak detection specifications

  21. Required Information - continued • Documentation specifications for afterburner used on scrap dryer/delac/decoat kiln Documentation of specifications for sweat furnace afterburner – temperature/residence time

  22. Required Information - continued • Approved OM&M Plan • Startup, shutdown, and malfunction plan

  23. Reporting Requirements§63.1516

  24. Required Reports • Startup, shutdown, and malfunction plan-§63.1516(a) • Excess emissions/summary report- §63.1516(b)

  25. Required Reports Cont’d. • Annual compliance certifications- §63.1516(c)

  26. Startup, Shutdown, and Malfunction (SS&M) Plan • Develop/implement Plan according to 63.6(e)(3)

  27. Startup, Shutdown, and Malfunction (SS&M) Plan Cont’d. • For malfunctions, plan to also include: • Procedures to determine and record cause • Corrective actions to be taken

  28. Excess Emissions Summary Report • Required semiannually (every 6 months) • 60 days after end of 6-month period • Must contain information on CMS performance per 63.10 (c) General

  29. Excess Emissions Summary Report Cont’d.General • When no deviations from parameters-report “No excess emissions”

  30. Report required if . . . • Corrective action, per OM&M Plan, not initiated within 1 hour for: • Bag leak detection alarm • COM deviation • VE from aluminum scrap shredder

  31. Excursion from approved operating parameter value or range • Action taken not consistent with SS&M Plan Report required if . . .

  32. Report required if . . . • Affected source not operated according to this subpart • Deviation from 3-day, 24 hr rolling avg. emission limit for SAPU

  33. Excess Emissions Summary Report Thermal chip dryer – Only unpainted aluminum chips used • Dross-only furnace – Only dross used Required Certifications

  34. Sidewell group 1 furnace, w/APCD- • Molten metal level above top of hearth/ sidewell passage during reactive fluxing, and Required Certifications- continued

  35. Required Certifications- continued • Reactive fluxing only in sidewell (or hearth) equipped with APCD for PM, HCI, D/F • Group 1 melting/holding furnace, w/o APCD – Only clean charge used

  36. Required Certifications- continued • Group 2 furnace • Only clean charge used • No reactive fluxing • In-line fluxer using no reactive flux – Onlynonreactive, non-HAP fluxes used

  37. Submit results of any performance test documenting: • Test methods and procedures • Process operations • Monitoring parameters ranges/values for each test

  38. Annual Compliance Certifications • Required by 40 CFR part 70 or 71 • Certify continuing compliance, for the year, based upon: • Any period of excess emissions reported as required

  39. Annual Compliance Certifications Cont’d. • Met all monitoring, recordkeeping, and reporting requirements

  40. Recordkeeping Requirements§63.1517

  41. Recordkeeping Requirements • General requirements for keeping records • Subpart RRR • General Provisions (63.10(b)) •Specific requirements of subpart RRR

  42. General Recordkeeping Requirements Subpart RRR • Retain records for 5 years – most recent 2 yrs onsite, remaining 3 yrs offsite