1 / 11

Technology Update

Technology Update. 11 J an 2011. TIES Technology Audit. TIES identified issues with: N etwork hardware (switches, servers) Network routing Network security Network configuration Backup system System updates and patches Active Directory. Network Upgrades so far….

elpida
Télécharger la présentation

Technology Update

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Technology Update 11 Jan 2011

  2. TIES Technology Audit TIES identified issues with: • Network hardware (switches, servers) • Network routing • Network security • Network configuration • Backup system • System updates and patches • Active Directory

  3. Network Upgrades so far… • Replaced all network switches • Wireless Access Points • Migration to 2010 Exchange server • Reconfigure Active Directory including permissions structure • Installed redundant firewall and filter • Installed new email filter

  4. Issues That Remain • Single points of failure (no redundancy) • 100’s of websites on multiple servers • Archaic servers and end of life software • Back up and recovery systems are inadequate • Difficult system administration and maintenance

  5. Virtualization - Definition

  6. Virtualization - Need • Replace archaic hardware • Centralize systems • Provide Redundant systems • Dynamic expansion • Affordable recovery of systems & data

  7. Virtualization - Advantages • Easier systems management • Easier systems administration • Easier systems maintenance • Easier data recovery • Easier deployments • Hardware consolidation • Going green

  8. Virtualization - Goals • Provide: • a reliable, flexible, and manageable infrastructure • for a well-designed Windows Server infrastructure. • services within the private cloud for the infrastructure. • highly available data access within the private cloud accompanied with dynamic management and administrative capabilities.

  9. Project Scope • Setup an infrastructure with a virtualization platform on new servers and storage hardware • Finish upgrade on Microsoft Active Directory (AD) services • Virtualize and configure any needed infrastructure services.

  10. Project Costs Hardware HP SAN P4500 with support $ 88,680.34 VMware Licensing $ 21,802.02 Server Hardware $ 33,903.44 Rack and Power $ 8,872.69 Microsoft Windows 2008 R2 Datacenter $ 2,317.68 Labor (estimated 350 hrs @ $125/hr) • Hardware Installation 90 hours • Active Directory related 98 hours • Migration to existing cloud 98 hours • Testing 32 hours • Post Installation 32 hours Total $43,750.00 Total estimated cost $199,326.17

  11. Questions?

More Related