An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. City of Polson April 5, 2010 PUBLIC HEARING Water System Improvements PRESENTATION ON PRELIMINARY ENGINEERING REPORT

  2. Project Scope • Prepare Preliminary Engineering Report (PER) • Address Short and Long-Term Water System Problems • Incorporate Results from Hydraulic Modeling Performed by Thomas, Dean and Hoskins • Develop Financial Plan • Pursue Financial Assistance • Keep the Public Informed

  3. What is a PER?? • Analysis of the Existing Water System • Identification of System Deficiencies, Current and Future Regulatory Issues • Evaluate Viable Solutions, Develop Costs • Identify the Most Cost-effective Option • Develop a Workable Financial Plan • Assess Environmental Impacts • Implementation Strategy

  4. Preliminary Engineering ReportsKeys to Success • Document Need!! • Comply with PER Outline • Reasonable Capital and O&M Costs • Address Existing and Future Regulations • Workable Financial Plan • Encourage Public Involvement

  5. Project Design Criteria

  6. Problem Evaluation and Resolution • Water Supply • Storage • Distribution – Water Mains, Valves and Hydrants • Develop Financial Plan

  7. Water Supply Problems • Additional Water Needed to Meet Anticipated Peak Demand • Water Needed on East Side of City during High Demand • Unaccounted for Water • Leakage • Unmetered Users • Complex Water Rights Issues • Variable Aquifer Characteristics • Limited Data on Peak Use and Aquifer Response • Global Warming (Drought)

  8. Activities to Address Water Supply Issues • Obtain New Sources of Groundwater • Replace All Malfunctioning Water Meters • Install Meters on City Facilities • Remain Involve in All Water Rights Negotiations, Further Investigate Existing Rights • Expand Monitoring of Water Use including PWL, SWL and Peak Use

  9. Potential New Well

  10. Storage Tank Needs • Two Tanks Under Construction • Renovate Interior Tank Coating on Skyline I • Connect Available Storage at Skyline to West Parts of Town • Plan for Future Storage near Woodbine Tank

  11. Identified DistributionSystem Problems • Low Pressures and Lack of Adequate Flow to Fight Fires in the Downtown Area • Skyline-Woodbine Connector via Skyline Drive Reconstruction • Hydraulic Restrictions (undersized mains) 4th Street East, etc • Looping of Water Mains- Irvine Flats, Kerr Dam Road.

  12. Resolution of Distribution System Problems • Downtown Water Main Improvements • Install 10” Main in Skyline Drive under Road Reconstruction Project • Eliminate Hydraulic Restrictions • Water Main Looping • Ongoing CIP for Undersized Mains

  13. Summary of High Priority Needs • Supply • Construct New Well on East Side • Address UAW • Storage • Rehabilitate Skyline I Metal Tank • Connect Skyline Storage to West Side • Distribution • Downtown Main Upsizing • Skyline Drive Reconstruction • Address Hydraulic Restrictions thru out City

  14. Cost Summary • New Well - $231,945 • Storage Improvements - $189,610 • Distribution Improvements - $1,920,309

  15. Financial Assistance • Treasure State Endowment Program • up to $500,000 grant • DNRC Renewable Resources Grant • up to $100,000 grant • CDBG Grant • up to $500,000 • Montana State Revolving Loan Fund • 2.75% and 3.75% loans • up to 30 year term • Current Economy May Limit Grant Opportunities

  16. Other Funding Scenarios • Extend Loan Term • Seek $500,000 CDBG grant • Divide Project into Smaller Components • Pursue STAG, WRDA, ARRA, RD or other Grant Funding

  17. Existing Rates for Water and Sewer Service Current “Typical” Water Rate $25.09 Current “Typical” Sewer Rate $28.75 Combined Rate $53.84 Target Rate Used for Funding $ 41.92

  18. Cost for Ratepayers Assumptions- No Local Funds, Use SRF Loan Funds @ 3.75% for 20 Years

  19. Potential Project Schedule • Complete PER this Spring • Develop CIP • Grant Applications due April-May of 2010 • Grant Funds Available in Summer 2011 • City is in Process of Drilling Test Well

  20. QUESTIONS?Contacts:Scott Anderson @ 449-3303or Tony Porrazzo @ 883-8215THANK YOU!!