1 / 18

AMCA Mr Warwick Stannus, A.G. Coombs Technical Manager 3 February 2012

AMCA BIM-MEP AUS Ductwork Design to Fabrication Workflows. AMCA Mr Warwick Stannus, A.G. Coombs Technical Manager 3 February 2012. BIM Challenges. Current BIM challenges. CAD Construction and Detailing. Proprietary BIM Design. CAD As-Installed. 2D PDF. CAM. CAM Fabrication.

Télécharger la présentation

AMCA Mr Warwick Stannus, A.G. Coombs Technical Manager 3 February 2012

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. AMCA BIM-MEPAUS Ductwork Design to Fabrication Workflows AMCA Mr Warwick Stannus, A.G. Coombs Technical Manager 3 February 2012

  2. BIM Challenges

  3. Current BIM challenges CAD Construction and Detailing Proprietary BIM Design CADAs-Installed 2D PDF CAM CAMFabrication Level of Development ?

  4. BIM Ductwork Models “A building database that uses data files together with intelligent parametric 3D objects to represent the building elements”

  5. BIM-MEPAUS Workflows / BIM All The Way BIMConstruction BIMAs-Installed BIM-MEPAUSRevit Design BIM-MEPAUSRevitConstruction BIM-MEPAUSRevit Commissioned - As-Built FAB-MEPAUS BIM-MEPAUSFabrication

  6. BIM Progress – Australia at the Leading Edge • Most new large projects are being specified now for BIM Implementation and delivery of an As- Built BIM Model • Construction coordination and Model Development will be in Revit and be managed by a BIM Coordinator – likely to be the Mechanical Contractor • Most new projects will use Trimble site positioning systems • BIM capability will become a point of differentiation

  7. BIM-MEPAUS Workflows / BIM All The Way BIMConstruction BIMAs-Installed BIM-MEPAUSRevit Design BIM-MEPAUSRevitConstruction BIM-MEPAUSRevit Commissioned - As-Built FAB-MEPAUS BIM-MEPAUSFabrication

  8. BIM-MEPAUS Ductwork Delivery Workflows MAPMechanical SC Shop Drawing BIMConstruction BIMConstruction BIMConstruction BIMAs-Installed BIMAs-Installed BIMAs-Installed BIM-MEPAUSRevitConstruction BIM-MEPAUSRevitConstruction BIM-MEPAUSRevitConstruction BIM-MEPAUSRevit Coordinated Design MAPOutsourced Fabrication MAPOutsourced Fabrication MAP Mechanical SC Fabrication FAB-MEPAUS FAB-MEPAUS FAB-MEPAUS BIM-MEPAUSRevit Coordinated Design MAPOutsourced Shop Drawing MAPMechanical SC Shop Drawing BIM-MEPAUSRevit Coordinated Design

  9. BIM-MEPAUSDuctwork Workflows / Key Success Factors MANUFACTURING DATABASE FORMS BASIS OF SHOP DRAWING AND ESTIMATING DATABASE LINKED REVIT/MAP LIBRARY TO ASSURE EFFICIENT DESIGN LINE >95% MANUFACTURER’S LIBRARIES BECOME THE WORKFLOW INTEGRATION KEY

  10. BIM-MEPAUSDuctwork Fitting Libraries

  11. BIM Ductwork Design Models

  12. BIM-MEPAUSDuctwork Fitting Libraries

  13. MAP Fabrication and Estimating BIMConstruction BIMConstruction BIMAs-Installed BIMAs-Installed FABRICATION LABOUR & MATERIALS FABRICATION LABOUR & MATERIALS PIPEWORK ESTIMATED COST DUCTWORK ESTIMATED COST SITE LABOUR & MATERIALS SITE LABOUR & MATERIALS

  14. BIM-MEPAUS Workflows / BIM All The Way REVIT BMA DUCT LAYOUT DESIGN LINE MAPEstimating and Shop Drawing FAB-MEPAUS BIMConstruction BIMAs-Installed BIM-MEPAUSDesign Model BIM-MEPAUSConstruction Model Manufacturer’s Fabrication Library CAMFabrication Duct Fabrication MAP BMA DUCT LIBRARY MAPDUCTWORK CAM CADShop Detailing

  15. BIM-MEPAUSDuctwork Workflows $$ T

  16. BIM based Site Positioning

  17. BIM-MEPAUS Step Change Innovation

More Related