This document presents a prototype demonstration of the MAHI Research Database's Data Validation System. It encompasses the project vision, goals, task analysis, and a detailed overview of the first phase dedicated to data validation, integrating new technologies like XML and enhancing medical database systems. The prototype focuses on creating a secure, scalable, and flexible architecture and incorporates user feedback for refinement. The report outlines the development stages, required technologies, and aims to significantly improve medical database usability and integration.

1 / 24

Télécharger la présentation

MAHI Research Database

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MAHI Research Database Data Validation System Software Prototype Demonstration September 18, 2001 http://www.cstp.umkc.edu/~yugi/mahi.html

  2. Aug, 2001: Project Status Report • Project Vision & Goal • Task Analysis • Tentative Schedule • Summary of Phase-1 Task • Research: Validation Hierarchy • Prototype Development • Secure Protocol (Digital Sender) • Potential Future Project

  3. Project Goals • Information System for Medical Databases • Phase-1: Data Validation • Phase-2: Data Integration • Phase-3: Data Mining and Analysis • Improve medical database system using new technologies (XML, hierarchical repository, component, etc) • Focus on an open architecture (scaleable, flexible, available, integrable, etc) • Develop representations and models

  4. Project Task Analysis • Research • Technology analysis and review • Development of models and algorithms • Publication • System Development • Requirements/domain analysis • System design • Prototype development • Deliverables • Demo • System specification/source code • Tutorial

  5. Phase-1: Data Validation • Requirements and Technology analysis • Understanding MAHI database system • Identifying stakeholders’ needs • Technology review and analysis • System architecture: XML-based information system • Prototype development (proof-of-concept) • scaleable, flexible, available, integrable, secure

  6. What’s next? Data Integration • Data integration and storage • Understanding of disparate data sources • Data integration for multiple data sources • Data exchange between XML and databases • Seamless Integration with the current MAHI system • Data conversion of legacy database • Enhancement of data validation • Technologies: XML-repository, databases, data warehouses, component technologies

  7. Today’s presentation • Prototype overview • Live demonstration • Audience feedback & discussion

  8. Purpose • We want to make the product tangible, bring usage scenarios to life, and close gaps in understanding user requirements. • 3 major focuses: • Clarify and complete requirements • Explore design alternatives • Grow into the fully-realized product

  9. Staged development for the MAHI Research Database System Structure Data analysis Behavioral prototyping: - Appearance and behavior of user interface Phase 3 Data integration Phase 2 Structural prototyping: - Implementing application functionality Data validation Phase 1 Behavior

  10. How we performed prototyping • ‘Look-and-feel’ vs. ‘Evolutionary’ prototyping Gather user requirements Refine user requirements Construct structural prototype Construct evolutionary prototype Develop ‘look-and-feel’ behavioral prototypes Design software architecture Evolve prototype; verify and deliver increments Design user interface Construct and verify product Construct and verify product Deliver product

  11. Evaluating the prototype • Functionality implemented in expected way? • Any missing functionality? • Any error conditions that the prototype does not address? • Any unnecessary functions? • How comfortable and logical does navigation seem? • Easier ways to perform this task?

  12. Data Validation System Objectives • Provide a common handler to validate all new in-coming data. • Represent the new data in a common, well-structured format that is easily read and manipulated by processing applications. • Separate data content in patient records from process- and presentation-dependent metadata. • Provide a data transformation process to integrate in-coming patient records for storage in the database.

  13. Using the Data Validation Software System IT Administrator XML Schemas & Stylesheets Multiple disparate data sources Researcher (via SAS) Admit File (ASCII) T T T db (. xml) Quarantine database XML-Quarantine User Interface (XQUI) XML repository Storage database Data Coordinator Inform Screen (.dbo) Web views Data interchange Industry standard

  14. System features • User friendly interface • Web accessible • Log-in and authentication • The Main panel • The Settings panel • The Record Viewer • Correcting errors • XML data conversion • Exporting to the database

  15. Log-in and authentication User id and password authenticated in this window. This tab gives user the option to provide user login and password. User login completed pressing this button. User can Log-off using this button. • Password log-in feature for accessing the application. • Added security.

  16. The Main Panel • The Main panel allows the user to connect to the quarantine database. Pop-up window showing user authentication was successful. • User can select the data source to validate and the XML schema to use. • Files are scanned for errors; errors are displayed. • User can resubmit the corrected records from this panel.

  17. The Main Panel User selects table name from a drop down box. It also shows the records display. You can enter the range of records to validate. Pressing this button will call the “validator” module. Progress bar indicating no files processed.

  18. The Settings Panel This panel allows you to make new user login settings. Add user button Dialog box notifying of the success of the new user id creation. • The Settings panel is used to create new user login settings. • Information about the current network port and host settings are also displayed here.

  19. The Record Viewer • The Record Viewer displays all fields of a particular record. This column lists all the fields for the record. This column lists the values for various fields. Fields that have an error have their corresponding ErrorFlags field checked. After changes in the records are made, using this button, database will be updated.

  20. Correcting errors • The validator module returns records containing errors. Validate the records selected by the user and list them on the screen. Lists all the records within the range specified by the data operator. Lists the no. of errors in the particular record.

  21. XML Data Conversion • The XMLGen module converts validated records into an interim XML representation. A validated InformScreen record in XML InformScreen records in Quarantine database

  22. XML Data Conversion • The XSLTransform module then converts the interim XML documents into a common document format (MahiDoc). MahiDoc AdmitFile record Interim AdmitFile record Interim InformScreen record MahiDoc InformScreen record

  23. Exporting to Database • The validated MahiDoc files are exported into SQL Server 2000 database using Microsoft’s OpenXML extension. Exported XML data is stored into Patient, Encounters, Readings, and Location tables. MahiDoc InformScreen record in XML repository

  24. The End