1 / 14

OBSOLETE PESTICIDE DISPOSAL PROJECT IN ETHIOPIA

OBSOLETE PESTICIDE DISPOSAL PROJECT IN ETHIOPIA. OBSOLETE PESTICIDE DISPOSAL PROJECT IN ETHIOPIA. Ekokem Hazardous waste management company in Finland Main activity: high temperature incineration of organic hazardous waste, > 80 000 tonnes/a Established 1979, waste treatment started 1984

emily
Télécharger la présentation

OBSOLETE PESTICIDE DISPOSAL PROJECT IN ETHIOPIA

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. OBSOLETE PESTICIDE DISPOSAL PROJECT IN ETHIOPIA

  2. OBSOLETE PESTICIDE DISPOSAL PROJECT IN ETHIOPIA Ekokem • Hazardous waste management company in Finland • Main activity: high temperature incineration of organic hazardous waste, > 80 000 tonnes/a • Established 1979, waste treatment started 1984 • Owners: Finnish State, municipalities and industry • Until today has treated 2 million tonnes of hazwaste by several techniques • Customers in over 30 different countries worldwide since 1986

  3. OBSOLETE PESTICIDE DISPOSAL PROJECT IN ETHIOPIA Ethiopia • Location: Eastern Africa • Landlocked • Area: 1.1 million km2 • Elevation extremes: -125 m  4620 m, mainly highland • Population: 70 million

  4. OBSOLETE PESTICIDE DISPOSAL PROJECT IN ETHIOPIA • Pilot project to Africa Stockpiles Programme (ASP) • Project carried out in 2001 - 2003 • Ekokem was selected after bidding competition • Financed by the Netherlands, Sweden and USA through the FAO of the UN • 1500 tonnes from over 220 different stores all over the country • Included ~ 400 tonnes of POPs pesticides: Aldrin, Chlordane, DDT, Dieldrin, Endrin, Heptachlor, HCB • Obsolete stocks accumulated over the last 40 years

  5. OBSOLETE PESTICIDE DISPOSAL PROJECT IN ETHIOPIA • Local project personnel, incl. 25 MoA staff, trained by Ekokem • Management and supervision of the work in the hands of 3-6 Ekokem ex-pats in co-operation with MoA staff • All the packaging materials and equipment needed in the project were imported • The pesticide wastes were shipped to Ekokem/Finland and disposed of by high temperature incineration

  6. OBSOLETE PESTICIDE DISPOSAL PROJECT IN ETHIOPIA • Strict Health & Safety standards were followed, e.g. • Personal protective equipment • Task based risk assessments • Paramedic available on site all the time • Cholinesterase tests • Local transportation carried out according to ADR • Waste exportation according to IMDG • Export-import licenses according to Basel Convention and EU Council Regulation No. 259/93 • High temperature incineration according to strict EU standards in Finland

  7. OBSOLETE PESTICIDE DISPOSAL PROJECT IN ETHIOPIA • Difficulties / challenges: • Bureaucracy, especially in the Notification procedure, customs… • Long distances, road conditions • Rain season / hot weather / altitude • Lack of suitable transport equipment • In some cases inventories incorrect • Illnesses (diarrhoea, flu, malaria) • Long duration of the project + all the difficulties  mental exhaustion of the project personnel

  8. OBSOLETE PESTICIDE DISPOSAL PROJECT IN ETHIOPIA • Positive experiences: • Good preparatory work done by the MoA and FAO, e.g. inventories and contractor site visit • Commitment of the MoA National Local Counterparts • Good co-operation atmosphere • Security • Local products and workforce very cheap

  9. OBSOLETE PESTICIDE DISPOSAL PROJECT IN ETHIOPIA • Capacity built for future operations (in Ethiopia still exist obsolete pesticides) • 25 regional local counterparts trained to supervise inventories and repackaging operations • 3 national local counterparts for managing implementation of collection, centralisation and repackaging operations, as well as Notification procedure • Trained local workers to carry out repackaging work • Practical awareness of the Notification procedure and transport regulations

  10. OBSOLETE PESTICIDE DISPOSAL PROJECT IN ETHIOPIA • Important in preparatory work: • Exact inventories • Contractor site visit: • Comprehensive examples of the stores, road conditions, accommodation possibilities etc. • Local counterparts  fully devoted to the project • Transportation possibilities • Collection centre(s): suggestions & locations

  11. OBSOLETE PESTICIDE DISPOSAL PROJECT IN ETHIOPIA Pesticide store in Dire Dawa:

  12. OBSOLETE PESTICIDE DISPOSAL PROJECT IN ETHIOPIA

  13. OBSOLETE PESTICIDE DISPOSAL PROJECT IN ETHIOPIA Pesticide store in Addis Abeba before and after:

  14. Contact information: • Website: www.ekokem.fi • E-mail: export@ekokem.fi