Capacity Methodology Statements. Transmission Workstream 5 th July 2007. Capacity Methodology Statements. Methodology Statement – Timetable. Consultation on the proposed Entry Capacity Substitution Methodology Statement. Key concerns expressed: Loss of capacity at the donor ASEP

emolinar
Télécharger la présentation

Capacity Methodology Statements

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Capacity Methodology Statements Transmission Workstream 5th July 2007

  2. Capacity Methodology Statements

  3. Methodology Statement – Timetable

  4. Consultation on the proposed Entry Capacity Substitution Methodology Statement Key concerns expressed: • Loss of capacity at the donor ASEP • Makes new projects expecting to use “spare” capacity less viable. Impact on Security of Supply. • Storage contracts are generally of short duration. User unable to signal long term requirements to prevent capacity being substituted away. • May lead to inefficient investment decision as Users bid to protect capacity normally obtained short-term. • Loss of Total Capacity • Generally a limit on exchange rates preferred. • Most respondent unable to specify a precise rate, but 1:1 and 1.5:1 suggested.

  5. Consultation on the proposed Entry Capacity Substitution Methodology Statement Key concerns expressed: • Scope of Substitutions. • Capacity substitutions limited to within zone to reserve capacity for within zone transfers and trades. • Substitutions should be applied to incremental requests irrespective of whether the NPV test is passed. • Adverse impact on short-term markets. • Concern that proposals may have an adverse impact of availability of NTS exit capacity, particularly flexibility capacity.

  6. Consultation on the proposed Entry Capacity Substitution Methodology Statement Key concerns expressed: • Comments on Detail of Proposed Process • Use of lowest revenue driver to identify recipient ASEP • Should the process aim to avoid “material” or “incremental” risk? • Exchanges should be assessed against “peak” flow analysis. • Definition of zones – storage ASEPs should be separate from non-storage.