1 / 11

ERP Software for Manufacturing Industry

<br><br>Eresource provides manufacturing solutions to midsize Manufacturing Companies with unformed, integrated, on-demand ERP solution designed to reduce costs, improve customer service, increase margins and generate new revenue streams. our erp solution for manufacturing helps you also cut down production bottlenecks. For details:http://www.eresourceerp.com/erpmanufacturing.htm

eresource
Télécharger la présentation

ERP Software for Manufacturing Industry

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MRP II - eresource ERP for Manufacturing 1

  2. Manufacturing Resource Planning •MRP II by itself is the original modality of what we know now as ERP •MRP •MRP II is one of the evolution stages of eresource ERP and covers all the resources in a manufacturing compnay •MRP II module in eresource ERP helps to maintain a neat agenda for the manner in which the resources are to be allocated without any confusion •eresource MRP provides formal plans for each part numbercomponent,or finished good 2

  3. Structure of BOM The BOM components in eresource support the use of the Bill of Material in form of tree structure. BOM can be generated in the following forms: Bill Of Material Forms Material BOM Equipment BOM Order Based BOM 3

  4. Types of BOM • Single level BOM • Multi-level BOM EQUIPMENT EQUIPMENT Level 1 Material 1 Material 2 Assembly 1 Material 3 Assembly 2 Level 2 Material 4 Material 5 Material 6 Level 3 Material A Material B 4

  5. Single Level Bill Of Material Only subordinate components can be captured that are immediately required (not components of component)to manufacture product. 5

  6. Multi Level Bill Of Material • The multiple BOM concept aids the management of a variety of similar BOMs. • Common components of similar BOMs are recorded in a 'Single Level BOM-M' 6

  7. Standard BOM while making new standard BOM eresource ERP gives provision of copy any standard BOM from existing BOM 7

  8. Order Based BOM In eresource ERP the provision is there to create a BOM against the sales order of any customer. 8

  9. Engineering Change Request eresource ERP gives you provision of Revision of BOM which is called ECR. W selection of any item this form gives you provision to zoom in the BOM by click on View BOM. 9

  10. Engineering Change Request • This module allows you to establish controls and manage the process of making changes to documents and drawings,parts, BOM and routing, work orders, and projects. 10

  11. Registered Office: eresource Infotech Private Limited, TMA House 1st floor, Road No. 16, Plot No. 6,Wagle Estate ,Thane (West) Tel: +91 22 41118000 to +91 22 41118050 (50 Lines) www.eresourceerp.com | http://nfra.eresourceerp.com/ Dubai P O Box 52034, Dubai UAE Mobile Number: 0097155 9018499 Email: sn@eresourceinfotech.com 11

More Related