1 / 24

The CBM-MVD prototype: Realization & beam test Michal Koziel Goethe-Universität, Frankfurt

Detector Workshop March 25th-26th 2013 at GSI. The CBM-MVD prototype: Realization & beam test Michal Koziel Goethe-Universität, Frankfurt m.koziel@gsi.de. Outline. CBM experiment and its requirements Prototyping the CBM-MVD Mechanical integration Readout electronics and DAQ

erma
Télécharger la présentation

The CBM-MVD prototype: Realization & beam test Michal Koziel Goethe-Universität, Frankfurt

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DetectorWorkshop March 25th-26th 2013 at GSI The CBM-MVD prototype: Realization & beam test Michal Koziel Goethe-Universität, Frankfurt m.koziel@gsi.de

  2. Outline • CBM experiment and its requirements • Prototyping the CBM-MVD • Mechanical integration • Readout electronics and DAQ • Data analysis • Summary and outlook

  3. The MVD – required performances • CBM-MVD will: • improve secondary vertex resolution • background rejection in di-electron measurements • host highly granular silicon pixel sensors featuring fast read-out, excellentspatial resolution and robustness to radiation environment. MVD Up to 4 stations

  4. Research fields towards the MVD Sensor R&D Sensor R&D • IKF infrastructure: • Class 1.000 (ISO 6) clean room • Grey room • Electronic workshop • Mechanical workshop • Equipment: • Manual wire-bonder • Probe station • 3 microscopes • Powerful cooling system • Vacuum chamber Prototype highlights: Mechanical integration • Develop cooling and support with low material budget employing advances materials System integration DAQ • Develop sensor readout system capable to handle high data rates Data analysis

  5. Progress towards the MVD Prototype Demonstrator >2015 Wire bonds 4 sensors ½ (!) of 1st station Flex Cable 200 µm Future MVD: alternated sensors Encapsulation ...will meet all requirements Final 2012 2010 2008 Sensor 50 µm Sensor: MIMOSA-20 ~200 frames/s few 1011neq/cm2 & ~300 kRad 750µm thick Sensor: MIMOSA-26 AHR ~10 kframes/s ~1013 neq/cm2& >300 kRad 50µm thin Sensor: synergy with ALICE (diff. geometry) FEB Readout speed: ~30 kframes/s Al heat sink Radiation tol.: >1013 neq/cm2& >1 Mrad 200 µm Glue Readout Serial/analog Readout CP/digital/high data rates FEB CVDdiamond Cooling & support: pCVD diamond(thermal grade) Cooling & support: TPG+RVC foam Material budget: ~ 2.45 % X0 Material budget: ~ 0.3 % X0

  6. Sensors for the MVD prototype MIMOSA-26 AHR: 0.35 µm process, High Resistivity (HR) EPI (1 kΩ·cm) • Possible issues: • Internal stress -> long-termreliability • Yield after assembly • Sensor pre-selection with probe cards • Main features: • in pixel amplification • binary charge encoding • - discriminatorfor each column • - 0-suppression logic • pitch: 18.4μm • ∼ 0.7 million pixels Bending radius: ~30 cm Size: 21.2 x 10.6 mm2

  7. Aspects addressed during prototyping phase Back scintillator Sensor integration on CVD diamond: Sensor Plane 4 • Adhesive bonding FPC Glue • Positioning DUT Plane 3 Carrier • Wire bonding r/o • Encapsulation T4 • Cooling optimization DUT micro-tracking T3 Double sided sensor integration Micro-tracking • Readout& control • Scalability • Reliability FPC Plane 2 T2 Plane 1 Beam T1 FPC Front scintillator Cooling FPC

  8. Test beam setup at Beam T3 T4 T1 T2 DUT 200 μm CVD diamond 1mm Al Material budget: 0.053 % X0 Material budget: 0.053 % X0 200 μm CVD diamond

  9. DAQ

  10. Dedicated DAQ sensors based on MIMOSA-26 AHR clock start reset JTAG FPC FPC FPC FEB FEB FEB driver board . . . LVDS, 1m 4x 80 Mbit/s converter board converter board converter board . . . LVDS 4x 80 Mbit/s readout controller board readout controller board Slow control board ~30 m Synergy with HADES readout controller board Hub readout controller board . . . 2 Gbit/s optical fiber to the MVD network General purpose add-on PC HADES TRB V2

  11. Tests before beam time • Stability runs • Slow control cross-check • Tests with radioactive sources • Threshold scans • Cooling check • Test with long cables • ... Laboratory setup Fully operational setup ready for travelling to CERN Corresponding fluence 24 kHz/cm2 (limited by source)

  12. Full beam setup at SPS Beam telescope FEE DAQ Huber cooling system

  13. DAQ performance during beam tests 9 s 40 s CERN-SPS Spill structure 12 sensors running in parallel All sensors are synchronized: No deviations detected within 10 ns precision. • Peak fluence: 350-400 kHz/cm 2 • 20% of MIMOSA-26 computing resources used • Factor of 1000 away from peak fluence @ AuAu 25AGeV ~9 s Limited by beam 110 ms 260 259 Frame number Frame number • DAQ runs very stable:No network errors, no data loss (5 days of tests) • Datarates: 6 MB/s - 25 MB/s but also overload test with +100 MB/s. • JTAG passed also all tests (100 000 programming cycles per chain). • In total 2TB of data stored The Readout Network was proven to be highly scalable.

  14. Data analysis

  15. Data analysis Beam setup 20 – 120 GeVPions CERN SPS North Hall beam • Detection efficiency, Fake Hit Rate, Spatial resolution as a function of threshold voltage (DUT) • 4 inclination angles of 0 ,30 ,45, 60 • Temperature (-6, +6, +17 C) & threshold scans • High beam intensity runs (in average up to 10 hits/frame but due to the non-uniform beam it could also be ~100 hits / some of frames – to be confirmed) DUT Plane 1 Plane 2 Plane 3 Plane 4 Data analysis flow: Cluster analysis 3D alignment Track selection with the 4-plane telescope (straight lines) Response of DUT to charged particles

  16. Cluster shape studies Top 8 most frequently observed cluster shapes 5 7 8 6 3 4 1 2 Cluster classification will be used for further FPGA-based data compression Center of gravity used to compute the “hit” position

  17. Cluster multiplicity studies PRELIMINARY Sensing diode  EPI Charge = 80EPIth[μm] / cos [e-]

  18. Detection Efficiency (DUT) PRELIMINARY signal Amplitude noise V threshold probe time NOISE = individual pixel feature V threshold Example: FHR < 10-5 Efficiency > 95% „safe” region

  19. Spatial Resolution (DUT) Spatial resolution: DUT only PRELIMINARY Correlation back - front X (row) back sensor X (row) front sensor FEB • Resultforthe DUT: • σx= 3.3 µm • σY= 3.3 µm Al heat sink π- 200 µm Front sensor FEB Reproducing the intrinsic parameters of the sensors validates the concept of the prototype. Back sensor

  20. Summary & outlook

  21. Summary • Achieved: • An ultra low material budget (0.3% X0) double-sided micro-tracking device: 2x2 sensors, CVD Diamond, glue & FPC. • Development of tools & assembly procedures. Mechanical integration DAQ • Achieved: • Synchronization • Reliability • Scalability • Slow control & monitoring tools • Data quality • Achieved: • package for alignment and data analysis for test beam setup (telescope-DUT) • online monitoring software (test beam setup) Data analysis

  22. Outlook p. 1 • Towards the CBM-MVD: • Optimizing the digitizer based on data on sensor response • Performance studies of physics cases allowing for more realistic studies on detector performance Data analysis DAQ • Towards the CBM-MVD: • Interface to the CBM DAQ • Optical data link between FEE and DAQ board • Towards the CBM-MVD: • Vacuum compatibility and integration into the CBM-MVD vacuum box • design the MVD platform in the target vacuum chamber • cable routing • finalize services (LV, cooling) • Improve in heat transfer. • Quality assurance while assembling (yields) Mechanical integration

  23. Outlook p. 2 How to move the MVD stations in vacuum ? Mechanical integration • Expertise needed in the future: • Glue: dedicated, radiation tolerant, reworkable, dispensing techniques... • Vacuum:feed-through concepts, MVD stations positioning • Cooling: CO2, or conventional Synergy with FAIR experiment (...and beyond) needed

  24. Thank you for your attention...

More Related