An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DCS CostTB 10.05.05 L.Jirden • Central DCS cost • Detector DCS cost

  2. Central DCS Configuration DB, Archives FSM servers Terminal servers, ACR consoles, etc Storage WAN LAN Services Detectors Magnets Rack control Electricity Safety: DSS Safety: CSAM Infrastructure gas cooling LAN Controller/ PLC VME Field Bus Node Node Experimental equipment ? ? ~1440K

  3. Central DCS • Consoles • Remote access • Backend servers • Worker nodes • Infrastructure and network • Spares

  4. TOTAL: 134.3 KCHF 12 KCHF 13.1 KCHF 34.5 KCHF On DAQ budget 18.5 KCHF 7.1 KCHF 43.6 KCHF Central DCS CERN Consoles Remote Access Backend Servers Domain Controller Firewall System Management Domain Controller DCS Operator IP Reach for KVM DB Server (Config.) DB Server (Archive) Terminal Server DCS Status DB Server (Archive) Terminal Server File Server Safety Status Information Server ACR Consoles DCS network Worker Nodes Network and Security Gas & Cooling Alarms LHC & Access FSM General services General DCS Environment Electricity & Racks Alignment Detector DCS Infrastructure, network Spares Racks, network, cabling KVM switchescontrolled power plugs Hot swap spare serversDisks & memories

  5. Consoles

  6. Remote access

  7. Backend servers

  8. Worker Nodes

  9. Infrastructure and Network

  10. Spares

  11. CENTRAL DCS TPC(1) 26/11/04 108? DETECTOR DCS 216 1 2 22 3 18? ? ? ? 288 108 1..3 1 1? 1..18 ~400? ? 1..22 1 [FSM?] Database(s) PVSS II PVSS II PVSS II Control room (ACR) OPCclient DIMclient User interface Ethernet PVSS II PVSS II PVSS II PVSS II PVSS II OPC client OPC client OPC client OPC client PVSS II ISEG OPCserver Wiener OPCserver ELMB OPCserver ELMB OPCserver DIMclient PCI-CAN PCI-CAN PCI-CAN PCI-CAN RS232 C C C C E S [FED] DIMsrv DIMcl ISEG Heinzinger Eth. Switch E Wiener Eth. Switch E HV LV ELMB HV ELMB LV monitor DDL Chambers Chambers Chambers,detector RCU HVrod HVrod DIMsrv Low Voltage Temp. Mon. FEE Very High Volt High Voltage VHV Curr. Mon.

  12. TPC(2) DETECTOR DCS GAS BUDGET COOLING BUDGET 1 1 ? 4 72 ? 2? 216 18 40 ? 26/11/04 Ethernet [GWG] PVSS II PVSS II DIMserver (?) OPCserver (?) Modbus/TCP Modbus/TCP ? PCI-Profibus P E E PLC [TS/CV] TS/CVSCADA Calibrationpulser PLC PLC C PS Laser P ELMB Gas Gatingpulser CoolingPlant (ch) CoolingPlant (TS) Mirrors,cameras Chambers Chambers,detector HVrod ThermalScreen(s) Detector Laser cal. Syst. Pulser system Ch Cooling Rod Cooling Thermal Screen Gas system

  13. DETECTOR DCS CostDisclaimer • Inputs from 13 detectors • My own guess on 4 • None is complete • Major costs are in cables and connectors • Number and prices very uncertain • Probably underestimated • Installation cost are not included

  14. Estimation today Quoted in MOU Detector DCS cost