This project, presented at the SEQUIN Workshop in Amsterdam, focuses on end-to-end traffic engineering and management across multiple administrative domains using the SuperJANET4 network. Key objectives include investigating managed bandwidth and Quality-of-Service (QoS) provisioning utilizing MPLS in core networks and DiffServ at the edges. Collaborators from institutions such as CISCO, the University of Manchester, and UCL aim to demonstrate high-performance data transfers to CERN and the US, along with robust monitoring of network latency and throughput.

fagan
Télécharger la présentation

Advancements in Managed Bandwidth and QoS on the SuperJANET4 Network

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MB-NG Managed Bandwidth Project On the SuperJANET4 Development Network Richard Hughes-Jones The University of Manchester Particle Physics Network Coordination Group SEQUIN Workshop Amsterdam 1 Feb 2002

  2. UK E-science core project • Project to investigate and pilot: • end-to-end traffic engineering and management over multiple administrative domains – MPLS in core diffserv at the edges. • Managed bandwidth and Quality-of-Service provision. (Robin Tasker) • High performance high bandwidth data transfers. (Richard HJ) • Partners:CISCO, CLRC, Manchester, UCL, UKERNA plus Lancaster and Southampton (IPv6) • Would like to use real Grid traffic – as demonstrator: • CDF UCL-RAL • BaBar Man-RAL • Demonstrate end-to-end Network Services • To CERN using Dante • To the US – DataTAG • Monitoring – DataGrid e2e latency /rtt / UDP and TCP BW SEQUIN Workshop Amsterdam 1 Feb 2002 R. Hughes-Jones Manchester

  3. MAN OSM-4GE-WAN-GBIC MCC OSM-4GE-WAN-GBIC OSM-1OC48-POS-SS UCL OSM-4GE-WAN-GBIC OSM-1OC48-POS-SS WorldCom SJ4 Dev C-PoP Warrington 12416 Leeds SuperJANET4 Production Network SJ4 Dev C-PoP London 12416 SJ4 Dev C-PoP Reading 12416 UCL OSM-4GE-WAN-GBIC WorldCom WorldCom MB – NG SuperJANET4 Development Network Gigabit Ethernet 2.5 Gbit POS Access 2.5 Gbit POS core MPLS Admin. Domains Dark Fiber (SSE) RAL/ UKERNA OSM-4GE-WAN-GBIC RAL/ UKERNA OSM-4GE-WAN-GBIC SEQUIN Workshop Amsterdam 1 Feb 2002 R. Hughes-Jones Manchester

  4. QoS Investigations • Implementing MPLS/QoS at a domain Boundary • Define traffic classes and policies for the domains • Classify packets on input – Diffserve: Source – dest IP address IP port • Perform policing and admission control • Provide 3 Queue types: • IP Premium - EF (Real-time queue eg Strict Priority) • Best efforts - BE • Less than best efforts –LBE (Scavenger QBSS) • Provide flexible Queue Scheduling – WRR • Provide Congestion control RED WRED – ECN • Implementing MPLS/QoS within a domain • Switching / routing on the basis of MPLS labels • Perform policing and admission control • Provide Queuing and Scheduling based on MPLS label • Be able to re-label the MPLS packets in a flexible manner. SEQUIN Workshop Amsterdam 1 Feb 2002 R. Hughes-Jones Manchester

  5. High Performance High Throughput • Bringing Gigabit throughput to the Grid applications • Show and tell demos • TCP streams operating at Gigabit rates • GridFTP operation • 100 Mbit, 500Mbit, 1 Gbit long transfers • Investigate • Understanding the operation of the end system HW • PCI Bus load CPU and OS • How to monitor protocols at Gigabit rates • Test and background traffic patterns • Measure • Latency • UDP and TCP Throughput – Different TCP algorithms • Packet loss • Packet jitter – IPDV • Non TCP transports SEQUIN Workshop Amsterdam 1 Feb 2002 R. Hughes-Jones Manchester

  6. Project Status • Funding • Approved: Equipment, 3 posts: ULCC UCL Manc. + Support for RAL staff • Will Start on 1st Appointment • Core Network • 2.5Gbit Fibres ready • GSRs + Gig Ethernet Delivered, POS blades to be ordered • Expect to connect 2.5Gbit POS fibres to routers by end of June. • Access Links • CPoP – Manc upgrade to10Gbit circuits – expect Jun 02 • Lon CPoP – ULCC link being used for US access - will be free in 1-2 months • ULCC-UCL – UCL fibre – expect after Easter • RAL – dark fibre – will be lit when required SEQUIN Workshop Amsterdam 1 Feb 2002 R. Hughes-Jones Manchester