An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. STIS Status TIPS, September 17, 2009 Charles Proffitt for the STIS team

  2. STIS Status: Topics • STIS SMOV & Calibration Overview • STIS CCD status summary • NUV Dark current update

  3. STIS SMOV Status • All STIS SMOV observations complete as of September 6, 2009 • Most STIS SMOV analysis complete • Final superbias & super-dark reference files for SMOV period have been delivered • New CCD reference file delivered • Readnoise, gain, and CTE parameters • CCD TDS reference files delivered • Time-dependent sensitivity corrections to flux calibration • Open issues in STIS SMOV analysis • Waiting for additional Cycle 17 calibration observations to finalize MAMA TDS updates • Changes from pre-repair predictions appear to be small (< 3%) • Monitoring of NUV MAMA dark is being continued by cycle 17 calibration program 11857 • Detailed writeups still pending for most activities

  4. STIS Cycle 17 Calibration • Analysis leads assigned for all programs • New leads will also track execution • Most Calibration Programs have started • Routine dark monitors have begun • Routine delivery of weekly bias and dark reference files • Automated Bias & Dark Pipeline still under work • P-flat data collection has begun • SMOV plan deferred this calibration to cycle 17 • Data being combined with SMOV results to improve calibration • Cycle 17 data especially important for CTE calibration

  5. STIS Calibration Plan

  6. STIS CCD Status • Dark current, read-noise, and CTE measured • Read noise slightly greater than pre-repair • Gain = 1 was 5.3 now 5.8 e- • Gain = 4 was 7.8 now 8.3 e- • Observed charge Transfer Efficiency (CTE) in 2009 close to extrapolation of old trend (CTI = 1 - CTE). • CTE losses becoming very large for faint sources

  7. STIS CCD Status - cont • Current pipeline CTE algorithm assumes constant “spurious charge” over detector at a given time • Can get better CTE correction if this allowed to vary over detector • This will require modest changes to CALSTIS • For now will use compromise value with old algorithm

  8. CCD Dark Current Behavior • Median CCD dark current in 2009 slightly above extrapolated trend from 2004 • CCD Dark shows increasing spatial dependence over time • about 40% lower near row 900 as compared to center of chip!

  9. CCD Sensitivity Changes

  10. Advantages of E1 position • For many years, we have had defined “E1” positions for CCD near row 900 of STIS long slit • Closer to default readout amplifier • Reduced CTI losses • Reduced effective dark current • Less contamination by CTE tails of CR & hot pixels • While we have advertised advantages of E1 position for years in IHB and other documentation, ETC does not distinguish between center and E1 posistion • GO need to manually estimate CTE losses • Re-emphasize importance of using E1 position to GOs • For cycle 19 ETC, should include variations in dark current & CTE as function of slit position

  11. NUV dark update • Post SM4 NUV dark current (black dots) much higher than expected • model as “expected dark” + “something extra” • Model as the “expected dark” (orange curve below) declining according to old behavior + an extra component Ae-(E/T) e-t/ • “extra” term appears to have stronger T dependence (E ≈ 1.8 eV vs 1.5 eV) • Plot below compares different e-folding times for extra component •  =100 d (red) &  = ∞ (blue)