Air-Ground Data Link - DFS Strategy

Air-Ground Data Link - DFS Strategy. ATN’99 - An International Conference on the Implementation of Aeronautical Datalink 23 September 1999 Speaker: Thomas Belitz, DFS Telecommunications (tbelitz@compuserve.com).

farrah
Télécharger la présentation

Air-Ground Data Link - DFS Strategy

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Air-Ground Data Link - DFS Strategy ATN’99 - An International Conference on the Implementation of Aeronautical Datalink 23 September 1999 Speaker: Thomas Belitz, DFS Telecommunications (tbelitz@compuserve.com) FOR PRINTOUTS OF THIS PRESENTATION PLEASE USE THE „PRINT>WITH NOTES“-FEATURE OF MS POWERPOINT.

  2. Air-Ground Data Link - DFS StrategyContents 1. Today‘s Shortcomings 2. Environment 3. Operational Requirements 4. Air-Ground Data Link Media 5. DFS-ATM-Systems/ Processes 6. Implementation Scenario Phase 1 (from 2005) 7. Implementation Scenario Phase 2 (from 2007) 8. Benefits according to Implementation Phases 9. Cost-Benefit Considerations 10. Summary 11. Conclusions

  3. Today‘s Shortcomings • increasing number of aircraft results in • reaching capacity limits on voice frequencies/ frequency shortage • overload of executive controllers • increasing challenge to ensure the safety of flight • voice communication implies potential of misunderstandings • no automated exchange of information between data processing systems in the Air and on the Ground • Airline requirements regarding data link are not satisfied

  4. Environment Relevant Strategies and Programs • Strategies, approved by DFS • ATM 2000+ • EATMS-OCD • EATCHIP-Communications Strategy • Important Programs • FAA- NEXCOM- Program • LINK 2000+ • PIT - PETAL Integration Team • Military Aviation • There was no specific military requirement for ATS-Data Link Services identified yet.

  5. D-ATIS (INDAL) D-DCL (INDAL) D-OTIS, D-RVR, D-SIGMET CAP, SAP PPD, (ADS) FLIPCY others DCL, CIC, ACM, (COTRAC) Operational RequirementsData Link Services - specific to DFS D-FIS CPDLC ADAP others 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 year

  6. Air-Ground Data Link MediaAssumption of Availabilities Alternative Media

  7. DFS-ATM-Systems/ProcessesPotential in Performance-Enhancementsresulting from the introduction of Data Link Services

  8. INDAL (D-ATIS, D-DCL) CPDLC (DCL, CIC- none time critical) DFIS (D-OTIS, D-SIGMET) ADAP (CAP, SAP) FLIPCY ACARS Alternative Media(Selection of complementary media by 2001) VDL M2 primary datalink A/G-Mediea Mode S Com SATCOM, complementary datalink System adaptations Implementation Scenario Phase 1 (from 2005)Non-Time Critical Services DL-Services ATM-Systems 2000 2001 2002 2003 2004 2005 2006 year

  9. CPDLC(CIC-time critical), ADAP(PPD, ADS), DFIS(D-RVR), others ACARS Alternative Media(Selection by 2001) • VDL M2 primary link (non-time critical services only) Mode S Com, complementary link SATCOM, complementary link Alternative Media(Selection by 2002) VDL M3 VDL M4 System adaptations Implementation Scenario Phase 2 (from 2007)Time Critical Services DL-Services A/G-Link Media ATM-Systems 2007 2008 2009 2010 2011 2012 year

  10. Benefits according to implementation phases

  11. Cost-Benefit ConsiderationsRequirement driven Capacity Plan Traffic Growth Data Link Introduction „Do Nothing“-Alternative EAM 04 P1 Program RVSM VAFORIT 1 Mode S ES

  12. Cost-Benefit Considerationstill in progress • DFS is a contributor to the ongoing Link 2000+ CBA. • The objective is to conduct a European-wide analysis. • The uncertainty* of early conducted cost estimations with particular focus to DFS was very high. Therefore, the introduction of Data Link Services** could notbe justified by economic reasons only.* At the moment of already conducted estimations there were very few reliable sources of monetary information regarding costs and benefits.** There was no individual investigation particular to singular data link services.

  13. Summary (1) • Future ATM-concepts depend on Air-Ground Data Link Services. • Air- Ground data communications is a major component of the„ATM Strategy for 2000+“. • The benefits of Air-Ground Data Link Services were demonstrated in the framework of PHARE and during the PETAL Life Trials. • The continued use of today's operational environment will result in further frequency shortages. • The cost/ benefit-ratio could not be finally calculated. There are a lot of currently unknown factors in the equation. This leaves the risk, that the figure will not justify the need.  The introduction of Air-Ground Data Link Services could not only be justified by a cost/ benefit-analysis.

  14. Summary (2) • The migration from ACARS to VDL M2 as the next generation AOC- Data Link media seems to be decided by the Airlines and the Service Providers (SITA/ ARINC). • Service Providers already decided on installation and operation of VDL M2 Ground- Infrastructure. • Airspace capacity shortages are expected when Data Link Services are not introduced before 2006. • DFS customers are requesting Data Link Services today, in order to receive enhanced and improved overall quality of ATC Services.

  15. Conclusions (1)Data Link Services There is a strategic requirement to introduce Air- Ground Data Link services within DFS controlled airspace. Therefore DFS introduces Air-Ground Data Link Services in a phased approach: Phase 0 (starting 1999): Initial Data Link Applications (Result of the Projects INDAL- DATIS and -DDCL) Phase 1 (starting 2005): non- time critical Data Link Services depending on operational requirements: Phase 2 (starting 2007): time critical Data Link Services

  16. Conclusions (2)Data Link Services • Data Link Services (main categories only) • Phase 1 (starting 2005): non- time critical Services • CPDLC (DCL, CIC- non time critical) • ADAP (CAP, SAP) • D-FIS (D-OTIS, D-SIGMET) • other Services (e.g. FLIPCY) • additional Phase 2 Services (optional starting 2007): time critical Services • CPDLC (CIC-time critical) • ADAP (PPD, ADS) • D-FIS (D-RVR) • other Services.

  17. Conclusion (3)Air-Ground Data Link Media • Non- time critical ATS Data Link- messages will use VDL M2 (medium timeframe, starting 2005) • The need for and the type of a “complementary Data- Link Media” (in addition to VDL M2) needs to be investigated and decided till 2001.In the light of the DFS- decision on Mode S Enhanced Surveillance, SSR Mode S communications will get special attention. • The operational requirement for the use of time critical ATS- Data Link- messages - and if so the type of the media - needs to be defined till 2002.