1 / 1

Tel Aviv immediate work plan

Tel Aviv immediate work plan. Relocate and organize the lab Re-operate the panel signals on the scope – early next week 1D position scan (VME scalar) - next week 2D scan (VME scalar) - after the 1D position scan MicroDAQ

fausta
Télécharger la présentation

Tel Aviv immediate work plan

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Tel Aviv immediate work plan • Relocate and organize the lab • Re-operate the panel • signals on the scope – early next week • 1D position scan (VME scalar) - next week • 2D scan (VME scalar) - after the 1D position scan • MicroDAQ • Teishengand J gathered all the components (except for the KvaserPCIcan) for the system – Erez should bring with him - this weekend • Buy the missing piece – next week • Assemble and install the system • First studies should reproduce a measurement done in AA – hopefully November • Test bench (cosmic & source) – after we get the system working We have two panels (Ni-Ni and SnO2-Ni)

More Related