An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EC Infrastructure Programme in Mozambique Sergio Piazzardi Head of Infrastructures Section EC Delegation Maputo

  2. Sectors of intervention • Transport Infrastructure € 160.0 • Water and Sanitation € 97.5 • Energy € 24.0 • Health Infrastructure € 11.5 • Telecommunications € 6.5 € 300 M

  3. Financial Instruments National Indicative Programme € 239 M Energy facility (*) € 25 M Water facility (*) € 37 M (*)cofinancing with EU Member states EIBs NGOs.. 10 EDF (2008-2013) € 130 M(pipeline)

  4. Legal basis and operational modalities • Legal basis for financing EDF operations is the Partnership Agreement ACP-EC signed in Cotonou on 23 June 2000 and revised in Luxembourg on 25 June 2005 • It is implemented in close partnership with the Government of Mozambique which is represented by the National Authorizing Officer • and in close cooperation with the responsible Ministries , line agencies and national entities such as : MOPH, ANE, Road Fund, DNA, FIPAG, CFM, DS-MISAU, Ministry of Energy, EDM, FUNAE, TDM

  5. Transport Infrastructure major interventions focused on North-South connection • Zambezi Bridge in Caia overall length 2.3 km – completion 2009 € 25 M (balance of € 65 M total by Italy and Sweden) • N1 Namacurra – Rio Ligonha 375 km – completion 2008 - € 70 M

  6. But also on policy dialogue and institutional capacity to ensure sustainability of the sector • Sector Budget Support to Road Sector 2005-2008 - € 21.5 M Policy dialogue with MOPH , ANE, Road Fund • Small Bridges and Rehabilitation of Rural Roads completion 2008 - € 9 M

  7. In the pipeline • Beira – Machipanda 285 km (2011) • Milange - Mocuba 210 km (2010) • Continuation of SBS in support of PRISE maintenance programme (2009-2013)

  8. Beira

  9. Water and Sanitation major interventions • Beira Sanitation project € 52.5 M Rehabilitation of the network and construction of a new waste water treatment plant in Beira Forecast completion 2010 • Maputo Water Supply € 25 M from the Water facility (balance of 70 M covered with EIB, AFD, Netherlands) Forecast completion 2011

  10. Energy • Provision of Photovoltaic systems in rural areas with FUNAE € 6.0 M • 3 Rural electrification projects in Tete, Cabo Delgado and in Sofala with EDM € 17 M from the Energy Facility (balance of 49 million co-financed with SIDA and Danida); • TA to the Ministry of Energy

  11. Health Infrastructureand Telecommunications • Two hospitals and three health centers in Zambezia completed € 3.0 M • 14 Health centers in Zambezia under construction € 3.5 M to be completed end 2008 • Manhica Hospital € 3.0 million in 2009 • Rural network enhancement to the boundary rural zones in the Provinces of Inhambane and Gaza provinces Completion 2008 Cost € 6.5 M

  12. Priorities 2008-2011 • Satisfactory completion of the current interventions • Strategic capital investment for regional integration • Ensuring the sustainability through provision of capacity building and SBS

  13. Thank you