This report summarizes the findings from the recent sensor meeting held at the University of Karlsruhe, focusing on the optical inspection and electrical measurements of various KA-Sets. Key topics include the condition of sensors, handling issues leading to scratches, delivery statuses, and failure rates. Additionally, the report covers the status of the cyclotron components and performance comparisons between Karlsruhe and Louvain. The findings reveal no significant failures in most KA-Sets, though some discrepancies in behaviors between different batches warrant further investigation.
E N D
Status report IEKP – University of Karlsruhe Alexander Furgeri Sensor meeting
QTC • Optical inspection of (16/40) • KA-Set 9 (2.) W5B (5/5) • KA-Set 10/1 W5B (3/8) • KA-Set 11/1 W6B (4/10) • KA-Set 11/2 W6B (4/4) • Electrical measurements of KA-Set 9 (2.) • IV & CV of KA-Sets 10 to 11 (18/35) • Summary • IQC Sensor meeting
Optical inspection KA-S10/1 Batch 31850 W5B (3/8) 9.1.2003 KA-S9 Batch 32965 2. Delivery 26.11.2002 W5B preliminary KA-S11/2 Batch 39728 W6B 9.1.2003 KA-S11/1 Batch 32961 W6B (4/10) 9.1.2003 preliminary Sensor meeting
Impressions of opt. inspection ? IV&CV OK ! Sensor meeting
Summary of optical inspection • Scratches ! On surface and on backplane ! • many at the same region of the sensors (handling facility ?) • some are really deep ! • Antistatic sheets to small for W5B • No -stamps on backplane • No sensor failed Sensor meeting
IV-curves of KA-Set 9 (2.) KA-S9 Batch 32965 2. Delivery 26.11.2003 No failures ! Sensor meeting
CV-curves of KA-S9 KA-S9 Batch 32965 2. Delivery 26.11.2003 Sensor meeting
Strips of KA-S9 No failures ! Sensor meeting
IV-Curves of KA-Set 10/2 W5B Delivered 9.1.2003 2 failures ! Sensor meeting
CV-curves of KA-Set 10/2 Sensor meeting
IV-curves of KA-Set 11/1 W6B Delivered 9.1.2003 No failures ! Sensor meeting
CV-curves of KA-Set 11/1 Sensor meeting
IV-curves of KA-Set 11/2 W5B Delivered 9.1.2003 1 failure ! Sensor meeting
CV-curves of KA-Set 11/2 Sensor meeting
Summary of QTC preliminary Sensor meeting
IQC • Status of cyclotron: • Mechanical part ready • Electrical part problematically • Old components (1962) • Many improvements (automatic temperature control, flux measurement ) • Comparison of Cint-ramps between Louvain and Karlsruhe Statement of main technician: „Ask in 2 weeks“ Sensor meeting
Cint-bumps • Effect only on irradiated ST-mini´s seen • Caused by low Rint ( that´s the problem) • 1 mini sent to Louvain • 3 mini´s sent from Louvain to us, but storage over christmas (3 weeks) at unknown temperature Sensor meeting
Comparison KA-Louvain KA-mini irradiated with p Same behavior! But different values !? Karlsruhe Louvain Strip 92 Sensor meeting
Cint ramps 1 1 8 8 Cint Dissipation Sensor meeting
Rint ramps Maximum of Cint corresponds to Minimum of Rint 1 8 Sensor meeting
Ileakage ramps Profil from 400 V Udep Sensor meeting
Cint ramps (2) In middle of sensor „constant“ 17 27 Sensor meeting
Rint ramps (2) 1 27 In middle of sensor „constant“ Lowest value ~60MOhm Sensor meeting
Ileak ramps (2) Ileak-bumps are no effect of changing temperature during measurement -11°C -10°C -12°C Sensor meeting
Summary of bumps • No temperature effects • Still in specs @400V • „Calibration“ between KA and Louvain • Same behaviour • Different absolute values (due to LCR-mode ?) Sensor meeting
Outlook • Comparison between Cp-D mode and Cp-Rp mode in KA • Measurement of Louvain irrad. Mini in KA • Comparison of Rint ! • Comparison of Rpoly increase (see Eric) Perhaps irradiations ? Sensor meeting