1 / 11

Summary of ITU-R Documents

Summary of ITU-R Documents. Authors:. Date: 2011-07-18.

feleti
Télécharger la présentation

Summary of ITU-R Documents

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Summary of ITU-R Documents Authors: Date: 2011-07-18 Notice:This document has been prepared to assist IEEE 802.18. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. John Notor, Notor Research

  2. Abstract The ITU-R has released a number of documents which may be of interest to IEEE 802 WGs. This document summarizes the ITU-R documents. John Notor, Notor Research

  3. ITU-R Documents for 802 Consideration • WORKING DOCUMENT TOWARDS A PRELIMINARY DRAFT NEW REPORT ITU-R SM.[SMART_GRID], WP 1A, 18-11/49r1 • DRAFT NEW QUESTION ITU-R [PWRGRD]/1, WP 1A, 18-11/51r0 • PRELIMINARY DRAFT NEW RESOLUTION ITU-R[CRS],WP 1B, 18-11/52r0 • CORRESPONDENCE GROUP ON NARROW-BAND WIRELESS HOME NETWORKING, WP 1B, 18-11/53r0 • MULTIPLE GIGABIT WIRELESS SYSTEMS IN FREQUENCIES AROUND 60 GHz, WP 5A, 18-11/54r0 • PRELIMINARY DRAFT NEW REPORT ITU-R M.[LMS.WASN STUDY], WP 5A, 18-11/55r0 • QUALITY OF SERVICE REQUIREMENTS AND OBJECTIVES FOR WIRELESS ACCESS SYSTEMS, WP 5A, 18-11/56r0 • PRELIMINARY DRAFT NEW RECOMMENDATION ITU-R M.[LMS.WASN], WP 5A, 18-11/57r0 John Notor, Notor Research

  4. PDNR SM.[SMART_GRID], WP 1A, 18-11/49R1 • Subject is Power Management Systems. • IEEE 802 created an input to the PDNR at the March 2011 Plenary in Singapore. • Our comments were adopted in the most recent WP 1A meeting and WP 1A has invited us to submit additional inputs (edits to the report). • The ITU-R Liaison statement to IEEE 802 is available as 18-11/50r0 John Notor, Notor Research

  5. Draft New Question ITU-R [PWRGRD]/1, WP 1A, 18-11/51r0 • Title: Impact on radiocommunication systems from wireless and wired data transmission technologies used for the support of power grid management systems. • Questions: • What are the technical and operating features and the characteristics of wireless technologies and devices in support of power grid management systems? • What are the data rates, bandwidths, frequency bands and spectrum requirements needed support of power grid management systems? John Notor, Notor Research

  6. Draft New Resolution ITU-R[CRS]/1, WP 1B, 18-11/52r0 • Title: Studies on the implementation and use of cognitiveradio systems (CRS) • Resolves to invite ITU-R: • To study the introduction and use of CRS in radiocommunication services; • To study operational and technical characteristics, requirements, performance and possible benefits associated with the introduction of CRS in relevant radiocommunication services; • To study the technical conditions associated with the implementation of CRS technologies in radiocommunication services in order to facilitate, ensure and enhance coexistence and sharing among radiocommunication services in specific frequency bands; • To develop relevant ITU-R Recommendations and/or Reports based on the aforementioned studies as appropriate… John Notor, Notor Research

  7. Correspondence Group on Narrow Band Wireless Home Networking, WP 1B, 18-11/53r0 • Working Party 1B (WP 1B) decided at its meeting, 25 May–1 June 2011, Geneva, to establish a Correspondence Group on narrow-band wireless home networking (NWHN). • This Correspondence Group (CG) will work in accordance with the following Terms of Reference: • taking into account the Liaison Statement to ITU-T Study Group 15, to consider input contributions providing the following information: • frequency band requirements; • operational requirements; • amount of spectrum needed; • implementation aspects; • to assess whether spectrum and operational requirements for NWHN could be met by the existing ITU-R publications; • if the result of this assessment proves that the requirements cannot be met: • to identify frequency bands which could be suitable for NWHN; • to examine the effect of emissions from short range devices used for NWHN on radiocommunication services; • to develop new or revised ITU-R Recommendation(s) and/or ITU-R Report(s), as appropriate; • to report to the subsequent meetings of WP 1B. John Notor, Notor Research

  8. Multiple Gigabit Wireless Systems in Frequencies Around 60 GHz, WP 5A, 18-11/54r0 • Two updated documents are attached for information and comments (see electronically embedded documents in Attachments 1 and 2 in 18-11/54r0). • Specifically, WP 5A would like to ask external organizations to provide WP 5A with any missing and/or complementary material. • In particular, WP 5A is interested in receiving material for the missing overview sections of the standards in Report ITU-R M.[LMS.MGWS2] as highlighted via editor’s notes. • WP 5A plans to finalize two documents in its eighth meeting of WP 5A to be held 8-17 November 2011. Deadline for contributions is 1st November 2011 at 1600 hours UTC. John Notor, Notor Research

  9. PDNR ITU-R M.[LMS.WASN STUDY], WP 5A, 18-11/55r0 • Title: System design guidelines for wide area sensor and/oractuator network (WASN) systems. • The report may be edited (using change marks) and submitted as a contribution from IEEE to WP 5A. John Notor, Notor Research

  10. QoS Requirements and Objectives for Wireless Access Systems, WP 5A, 18-11/56r0 • Title: Liaison statement to ITU-R Working party 5D, ITU-T Study groups 12, 15 and 16, and External organizations on “QUALITY OF SERVICE REQUIREMENTS AND OBJECTIVESFOR WIRELESS ACCESS SYSTEMS” • The intent of the proposed new Recommendation is to consolidate the end-user performance requirements and objectives for wireless access systems, as per other Recommendations on Quality of Service. • This affects multiple ITU-R documents. John Notor, Notor Research

  11. PDNR ITU-R M.[LMS.WASN], WP 5A, 18-11/57r0 • Title: Objectives, characteristics and functional requirements of wide-area sensor and/or actuator network (WASN) systems. • This Recommendation provides the objectives, system characteristics, functional requirements, service applications and fundamental network functionalities for mobile wireless access systems providing communications to a large number of ubiquitous sensors and/or actuators scattered over wide areas in the land mobile service. The key objective of WASN systems is to support machine-to-machine service applications irrespective of machine locations. • IEEE 802 may provide inputs by editing the PDNR with change marks enabled. John Notor, Notor Research

More Related