Community Infrastructure Upgrading Program (CIUP) and Water Intensification (DAWASA)

Impact Evaluation of the Community Infrastructure Upgrading Program (LGSP), Water intensification (DAWASA), and Tanzania Social Action Fund (TASAF). Community Infrastructure Upgrading Program (CIUP) and Water Intensification (DAWASA). Projects description:

felice
Télécharger la présentation

Community Infrastructure Upgrading Program (CIUP) and Water Intensification (DAWASA)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Impact Evaluation of the Community Infrastructure Upgrading Program (LGSP), Water intensification (DAWASA), and Tanzania Social Action Fund (TASAF)

  2. Community Infrastructure Upgrading Program (CIUP) and Water Intensification (DAWASA) Projects description: • The Community Infrastructure Upgrading Program of LGSP will provide a package for upgrading basic infrastructure and services in 16 selected low-income settlements of Dar es Salam. • DAWASA will provide water intensification (ho. connections and water points) to all communities (progressively during the next 5 years) including the 16 CIUP communities. The CIUP communities will be covered in the next two years. Objective: Evaluate the total impact of a package of infrastructure upgrading and relative to investments in water upgrading alone

  3. Design: main evaluation of CIUP vs. DAWASA • Survey. Community andHousehold surveys in the low-income settlements mtaas of Dar es Salam. Baseline end 2005. Follow up survey end 2007. • Sample of household surveyRepresentative sample of households from • 16 CIUP communities, • 30 DAWASA only communities, and • 40 non-beneficiary communities. • Sample size (86x30)= 2,780 households • Survey cost (2780x$50x2)=$278,000 • Community survey will cover the 86 communities. The community survey will be used to match communities together with selected indicators from the household survey. Community survey cost (86x100)=$8600.

  4. Design: main evaluation of CIUP vs. DAWASA • Method. Propensity score matching of communities using baseline data: match • CIUP communities to DAWASA communities • CIUP communities to non-beneficiary communities • DAWASA communities to non-beneficiary communities • Average treatment effects estimated as difference in difference: • Infrastructure except water effect = (Y2-Y0)CIUP-(Y2-Y0)DAWASA • Infrastructure effect = (Y2-Y0)CIUP-(Y2-Y0)N-BEN • Water effect = (Y2-Y0)DAWASA-(Y2-Y0) N-BEN

  5. Evaluation of water intensification • Background. Water intensification interventions are implemented progressively from the costal area into the inland along three trunk corridors • Objective: evaluate impact of water intensification and validate water results from main evaluation above • Method. • Moving pipeline comparison. • Measure outcomes either side of the rehabilitation frontier at various points in time along the corridor (Pugu Road) • 4 surveys 1 year frequency. Sample size 100 households. Surveys costs $50x100 ho.x4surveys=$20,000 • Average treatment effect will be estimated every year as: • Average water effect = (Y1-Y0)WITHIN FRONTIER-(Y1-Y0)OUTSIDE FRONTIER

  6. Surveying quality • Water sampling across Dar es Salam. This will include all communities covered by the main CIUP/DAWASA evaluation (feasibility to be investigated)