1. Senior Personnel - RNMC. Senior personnel have an average of 22 years mine experience.Goal is to have all process personnel in place by November 1st.Benefits will average around 35%.. . 2. Environmental. PermittingAll permits in place. Groundwater permit NEV92105 currently under renewal by State of Nevada.Use of Liberty Pit for short-term mine waste backfill under development with submittal to NDEP before October 30, 2004. Demonstration will involve a modification to the current Waste M34434

filbert
Télécharger la présentation

Quadra Mining Limited

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


    1. 0 Quadra Mining Limited Robinson Nevada Mining Company September 30, 2004

    2. 1 Senior Personnel - RNMC

    3. 2 Environmental Permitting All permits in place. Groundwater permit NEV92105 currently under renewal by State of Nevada. Use of Liberty Pit for short-term mine waste backfill under development with submittal to NDEP before October 30, 2004. Demonstration will involve a modification to the current Waste Management Plan which will also address mine dump development and concurrent dump closure.

    4. 3 WEEKLY MINE PERFORMANCE (YTD, 2004) ROBINSON MINE

    5. 4 Budget / LOM Plan 2004-2014 Metric

    6. 5 MINE OPERATIONS Working Equipment Schedule

    7. 6 Production Fleet Robinson Mine

    8. 7 Production Fleet Robinson Mine

    9. 8 Production Fleet Robinson Mine

    10. 9 Production Fleet Robinson Mine

    11. 10 Production Fleet Robinson Mine

    12. 11 Production Fleet Robinson Mine

    13. 12

    14. 13

    15. 14 MANPOWER RAMP-UP SCHEDULE WGN Mining Contractor

    16. 15 Mining Contract -- Washington

    17. 16 Mill Projects Improvements and Recommissioning Prior to Start-up Replaced bucket conveyor with conventional conveyor. Updated process control instrumentation. Completed tailings dam extension. Aligned SAG and ball mill gears. Replaced bus bars for 480 volt transformers. Replaced concave and mantle liners at primary crusher. Re-spliced all conveyors. Replaced trommel screens on Sag and Ball Mills

    18. 17

    19. 18

    20. 19 Mill Production Actual Production First mill production August 31, 2004. Over 600,000 tons milled through 9/28/04. Over 5,000 tons of concentrate produced through 9/28/04. Full mill production during October, 2004. Gravity gold circuit to be operational November, 2004

    21. 20

    22. 21

    23. 22

    24. 23 Concentrate Haulage From Mine Site to Port CURRENT STATUS

    25. 24 Quadra Mining Limited Robinson Nevada Mining Company September 30, 2004