1 / 1

Detailed Project Report

A detailed project report (DPRs) are the output of planning and design phase of a project. DPR is a very detailed business plan that elaborates by indicating the overall programme, different roles and responsibilities, activities and resources required for the project.

Télécharger la présentation

Detailed Project Report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Detailed Project Report A detailed project report (DPRs) are the output of planning and design phase of a project. DPR is a very detailed business plan that elaborates by indicating the overall programme, different roles and responsibilities, activities and resources required for the project. A DPR is a final, detailed project report (DPRs) appraisal report on the project. It gives a detailed of the basic programme the roles and responsibilities, all the activities to be carried out and the resources required and possible risk with recommended measure to counter them. However, the success of the project is measured on the basis of: ● Whether the project was completed on time. ● Whether actual cost of project was within reasonable limits of escalation. ● Whether after completion of the project it was able to deliver the products of desired quality and in adequate quantity to clients satisfaction at profitable costs. ● Whether the project gestation period was within planned duration. Preparation of Detailed Project Report The preparation of detailed project report requires wide variety of expertise. A number of decisions are mutually related. For instance: requirement and training plan is dependent on the nature of the technology, availability in the general employment market in the region, need for foreign collaboration and training, extent of specialised plant and equipments supplied from abroad etc.

More Related