1 / 15

CC IN2P3 - T1 for CMS: CSA07: production and transfer

CC IN2P3 - T1 for CMS: CSA07: production and transfer. Nelli PUKHAEVA. CCIN2P3 on CMS computing model. The CCIN2P3 is one of the CMS T1 target is to be around 10 % of the overall T1 resources. Several national and foreign T2 are attached to the CC T1: CC-IN2P3 T2

Télécharger la présentation

CC IN2P3 - T1 for CMS: CSA07: production and transfer

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CC IN2P3 - T1 for CMS:CSA07: production and transfer Nelli PUKHAEVA

  2. CCIN2P3 on CMS computing model The CCIN2P3 is one of the CMS T1 target is to be around 10 % of the overall T1 resources. Several national and foreign T2 are attached to the CC T1: CC-IN2P3 T2 GRIF federated T2 Belgium_IIHE, UCL T2 Beijing T2 Nelli Pukhaeva / CMS at CC

  3. CC in CMS computing model At CCIN2P3 we are sharing T1-T2-T3 functionality ~230TB fully deployed and available Current spliting is: • T1 - 160TB • T2 - 50TB • T3 - 20TB The splitting between T1 and T2 is done through dedicated CEs. Separate CEs: T1 - cclcgceli01(SL4), T2 - cclcgceli02(SL4), cclcgceli05(SL3) The splitting in term of resources is done by priority for jobs according to CEs and job user (prod vs else). Nelli Pukhaeva / CMS at CC

  4. CSA07 CSA07 general objective for T1 site CSA07 -- 1 Oct. -- 10 Nov. This was important event to access CC-IN2P3 capabilities for transfer, CMS job production etc… Tasks to be completed for physics: alacreco, background data sets, ‘enhanced lepton’ reco Nelli Pukhaeva / CMS at CC

  5. Daily CMS work operation at CC • Number of issues with storage and transfers: HPSS, dCache, srm, afs… • merging jobs problem - solved • Cleaning unmerged files • What we can do for the 2GB job problem? • FTS parameter tuning for matrix transfer • Can we avoid accessing HF libraries on /afs and just copy them on WN? Nelli Pukhaeva / CMS at CC

  6. CMS jobs monitoring One good day for us Nelli Pukhaeva / CMS at CC

  7. CMS jobs at CC IN2P3 Monitoring jobs at CC: Max all cmsf running jobs: 1070 Average all cmsf running jobs: 691 Current all cmsf running jobs: 538 Max all running jobs: 5002 Average all running jobs: 4146 Current all running jobs: 4068 Max Percentage 23.0 % Average Percentage 17.0 % Current Percentage 13.0 % Nelli Pukhaeva / CMS at CC

  8. CMS jobs monitoring at CC • T1 jobs • T2 jobs Nelli Pukhaeva / CMS at CC

  9. Grid CMS jobs at CC IN2P3 • Monitoring of jobs at CC: Analysis Nelli Pukhaeva / CMS at CC

  10. T1-T1 Transfer Nelli Pukhaeva / CMS at CC

  11. CMS data transfer by PhEDEx PhEDEx Nelli Pukhaeva / CMS at CC

  12. DDT • It should started from good link to all T1s Things have improved BUT after 1 month of hard effort. Reasonable strategy - to get in priority T1-T1 links and then T1-associated T2 links, then enabling any T1-T2 connection through other T1s. We don’t see a need for continuous commissioning rather recommission after upgrades or several shutdown periods Nelli Pukhaeva / CMS at CC

  13. Data transfer at CC FTS • Dedicated channels for each T1 • Dedicated channels for each corresponding T2 –GRIF, Belgium, Beijing • STAR channel with 10 strims • During of CSA07 we have tune the FTS parameters for each channel • https://cctools.in2p3.fr/dcache/monitoring/ftsmonitor.php?vo=cms • https://cctools.in2p3.fr/dcache/monitoring/ftschannel.php?channel=STAR-IN2P3&vo=cms Nelli Pukhaeva / CMS at CC

  14. CSA07 at CCIN2P3 • CCIN2P3 have done GOOD • There is room for improvement for transfer and production Next step - get more efficient use of these ressources Nelli Pukhaeva / CMS at CC

  15. support Ready for NY ? Number of jobs: Today - 900, 250 production jobs Transfer: Why we cant to keep transfer stable? We believe a LOT can be done improving CMS application and tools - examples of job merging with connection pb, reading data file on /afs to be avoided, manual cleaning of files to be avoided, CMSSW 64 bit build… Nelli Pukhaeva / CMS at CC