50 likes | 162 Vues
This comprehensive technical review assesses the feasibility of the final VTX tracker proposal for the PHENIX project. Scheduled over 1.5 days on January 19-20, the review focuses primarily on technical issues pertaining to the project, specifically its cost and schedule. A select group of experts will present their findings and insights, followed by a Q&A session to clarify any concerns raised. The agenda and speaker line-up will be finalized shortly, with an emphasis on thorough preparation and rehearsal to ensure a productive review.
E N D
VTX review (plan) Y. Akiba
VTX review • 1/19 and 1/20 (1.5 days) • This is a technical review, with emphasis on cost and schedule • T. Ludlam’s charge to the reviewer • The purpose of this review is to evaluate the technical feasibility of the final proposal for the VTX tracker, and to provide an assessment of the cost and schedule for the project as proposed by PHENIX. • Focus on Technical issues; Minimize emphasis on physics (NSAC report has done it) • The agenda will be set by us • 1/19 for presentations • 1/20 closing sessions to answer Questions raised.
reviewers • Brenna Flaugher FNAL CDF SVXII • Carl Haber LBNL CDF SVXII • David Lynn BNL STAR SiDrift • Ven Polychronakos BNL ATLAS • Rich VanBerg U. Pennsylvania ATLAS, ASD chip
Preparation for the review • Update project • Cost run through on January 11th (tentative) • Decide the agenda of the review • We will set the agenda and the speakers • Need to prepare talks well ahead of the review • Rehearsal on January 17th (BNL holiday)
agenda and speakers • Possible list (Who is available?) • Project overview • YA • Cost and schedule • Craig • Pixels • Hiroaki Overview • Hiroyuki Pilot module • Atsushi bus • Axel Pixel FEE • Strips • Abhay Overview • Junji sensor • Vince ROC and FEE • Junkichi/Kieran Q/A • Auxiliary system and integration • Robert Pak overview • Dave Lee mechanics