1 / 2

HSL Dynamic C2 Prototype

HSL Dynamic C2 Prototype. Prototype developed in three days at Cambridge. Development team included: NWDC, TFW, CINC21, NPS, MITRE, Labs. -Today’s ”Demo” is unclass single ops thread only. Prototype is extensible, adaptable, changeable, maintainable, scaleable…

frieda
Télécharger la présentation

HSL Dynamic C2 Prototype

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. HSL Dynamic C2 Prototype • Prototype developed in three days at Cambridge. • Development team included: • NWDC, TFW, CINC21, NPS, MITRE, Labs. • -Today’s ”Demo” is unclass single ops thread only. • Prototype is extensible, adaptable, changeable, • maintainable, scaleable… • supports rapid coevolution of prototype with • operational concept

  2. Way Ahead • Prototype provides solid first step in coevolution process. • Integrated into HLS concept development process. • Integrated into HSL C2 wargame 29-31 Oct at NWC and NPS Monterey game 6-8 Nov complete. • Follow-on wargames planned. • Coordination/visits with ONI, USCG, Fleet, Customs, others underway. • Transition path through TFW (Dec 01 pilot portal) /CINC21 planned and promising. • Delivery of C2 capabilities to HLS nodes May 01.

More Related