An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ALICE 5 o’clock meeting Wk 51

  2. INDICO You’ll find this meeting here: http://indico.cern.ch/categoryDisplay.py?categId=2957 The full shutdown planning is here: http://indico.cern.ch/conferenceDisplay.py?confId=117669

  3. Access requestCavern and surface • You should submit an ADI and a task procedure Attach task procedure Work breakdown structure – risk associated at each step Two persons minimum ADI https://edh.cern.ch/Document/ADI Task procedure Template EDMS 1103355 5 o’clock meeting

  4. ALICE Christmas break schedule Open L3 doors TRD Close Experiment EMCal Open Experiment Close L3 doors 5 o’clock meeting

  5. UX25 access • Rules for access restrictions: • Removal/installation of shielding (restriction includes RB24 triplets) • PX24 blocks: no access CR5 and UX25 • PX24 beams (35t): no access CR1-5, Expo, and UX-25 • All other blocks: no access to UX-25 • LHC evacuation test (7/12 after 18:00 and 24/12 tbc) – no access UX25 • Gas functional test (10/12 - 2 hrs) – no access UX25 and CR1-5 • AUG test (20/1) (Arrêt Urgence General – General Emergency Stop) – no access UX25 • DSO test (12-13/1) (Department Safety Officer) – no access UX25 • No access SX2 during manipulation of blocks in SX2 (except ACR and WRs) 5 o’clock meeting

  6. L3 (and MNF) access EMCal 13 3 No Ventilation 24 31 No Ventilation 7 EMCal EMCal Evac. No Ventilation • Wks 50 and 4: access (TPC) to be coordinated with TC (transport) • Wks 1-2: no access during EMCal SMs insertion inside L3 (see day-by-day) • When moving from low-beta to yellow platform: no access to MNF • When inserting the module: no access L3 and MNF • Watcher needed in wk 49 and from wk 4 onwards • Wk 6 or 7 (tbd): Kr calibration – TPC T stability (all interventions to be agreed by TC/RC) 5 o’clock meeting

  7. Day-by-day schedule UX25 and MNF - Wk 51

  8. Week 51 - 20/12 Monday GS/ASE: UX25 fire detection maintenance ALTEADL unload in SXL2 2 EMCal modules Activities: • TRD: installation BBF rails SR16-15 • Survey: TRD and EMCal survey • TPC: replacement 1 FE card (A-side) • PMD+Pieter: move detector in parking position 5 o’clock meeting

  9. It H Activities in UX25 - Week 51 - 20/12 Monday EMCal Survey (1/2 day) TRD and EMCal Survey TPC FEC TPC FEC Prepare TRD 16 installation 5 o’clock meeting

  10. Activities in MNF - Week 51 - 20/12 Monday Move PMD in parking position 5 o’clock meeting

  11. Week 51 - 21/12 Tuesday Google Streetview visit (5 people). 16:15 GS/ASE: UX25 fire detection maintenance DAQ: switch off DAQ. The ACR PCs will be left ON to give access to the DCS for the detectors teams who need it DCS: the access restrictions to the DCS network will be enforced from December 21st towards the end of working hours Activities: • TRD: install TRD16 • Philippe+Didier: removal ladder BKF • PMD: replacement electronics chains 5 o’clock meeting

  12. It H Activities in UX25 - Week 51 - 21/12 Tuesday Install TRD 16 5 o’clock meeting

  13. Activities in MNF - Week 51 - 21/12 Tuesday PMD: replacement electronics chains 5 o’clock meeting

  14. It Activities in UX25 - Week 51 - 22/12 Wednesday Visit: RIKEN RIBF Accelerator technical coordination group. Ken Oyama TRD Survey Prepare TRD 15 installation Connect TRD 16 5 o’clock meeting

  15. Activities in MNF - Week 51 22/12 Wednesday PMD: replacement electronics chains 5 o’clock meeting

  16. It H Activities in UX25 - Week 51 - 23/12 Thursday TRD Survey Install TRD 15 Connect TRD 16 5 o’clock meeting

  17. Activities in MNF - Week 51 - 23/12 Thursday PMD: replacement electronics chains 5 o’clock meeting

  18. It H Activities in UX25 - Week 51 - 24/12 Friday LHC evacuation test. no access UX25 5 o’clock meeting

  19. Activities in MNF - Week 51 - 24/12 Friday LHC evacuation test. no access UX25 5 o’clock meeting

  20. It H Activities in UX25 - Week 51 - 25/12 Saturday Christmas day 5 o’clock meeting

  21. Activities in MNF - Week 51 - 25/12 Saturday PMD: replacement electronics chains 5 o’clock meeting

  22. It H Activities in UX25 - Week 51 - 26/12 Sunday TRD team at CERN: 26 to 30/12 5 o’clock meeting

  23. Activities in MNF - Week 51 - 26/12 Sunday PMD: replacement electronics chains 5 o’clock meeting

  24. DCS plans Wk 51 Contingency for system upgrades Support to detectors restarting/testing their systems after upgrades Detectors shall test functionality as much as possible Tue 21/12 PM: Limit access to DCS cluster during end-of-year closure Register with your SRC if you require access (see message Peter 2/12/2010) Wk 52 – Wk 01 Only ‘best effort’ support during CERN closure 5 o’clock meeting André / Peter

  25. AOB • - 5 o’clock meeting